General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 81-1-2025
PROJECT NO.1: ROADWAY NARROWING, PAVING, GREEN INFRASTRUCTURE, AND TRAFFIC SAFETY PROJECT IN: S. 1ST St. – S. Chase Ave. to W. Lincoln Ave.
08/07/2025 03:30 PM UTC
OFFICIAL NOTICE 91-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
08/08/2025 03:30 PM UTC
OFFICIAL NOTICE 78-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; Street Lighting Upgrades for: ST3202318100 – Street Lighting Improvement for Carbon Reduction Program @ Various Locations
08/15/2025 03:30 PM UTC
OFFICIAL NOTICE 90-1-2025
CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, PAVERS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS, GRAVEL FILLING, CRUSHED GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER ALTERATIONS, STREET LIGHTING, UNDERGROUND CONDUIT, LANDSCAPING, TOPSOILING, ETC.
08/19/2025 03:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 71-1-2023
200 LEAD SERVICE LINE REPLACEMENTS
06/12/2023 03:30 PM UTC
OFFICIAL NOTICE 67-1-2023
CONSTRUCTION OF 5” CONCRETE WALK, CONCRETE WALK WITH INTEGRAL CURB, 7” CONCRETE DRIVEWAY, HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, CONCRETE CURB AND GUTTER, 7” HIGH EARLY STRENGHT CONCRETE DRIVEWAY, 8” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIOUS CONCRETE REMOVALS, GRAVEL FILING, DETECTABLE WARNING FIELDS, MANHOLE/INLET ADJUSTMENTS, AND SODDING & TOPSOIL , OTHER REMOVALS, ETC.; Located at: ST230230101 – Area Wide Walk Replacement for Areas Bounded By (ABB): West Vine Street, North 47th Street, West Lloyd Street, North Hi Mount Boulevard; East North Avenue, North Oakland avenue, East Irving Place, East Boylston Street, The Milwaukee River; North Lake Drive, North Wahl Avenue, East Belleview Place ST216230105 – ADA Ramps Replacement @ Various Locations
06/09/2023 03:30 PM UTC
OFFICIAL NOTICE 62-1-2023
WORK ON THIS PROJECT SHALL INCLUDE, BUT NOT LIMITED TO: TRAFFIC CONTROL, INSTALLATION OF VARIOUS STREET LIGTHING APPURTENANCE WORK, INSTALLATION OF STREET LIGHTING POLES, LIGHT POLE REMOVALS, INSTALLATION OF CONDUITS AND CABLES, ELECTRICAL APPURTENANCE REMOVALS, ETC.; Installation work at the following location: RG1515236326 – Street Lighting Series Conversion SG9-10 and SO5-6 @ Various Locations
06/07/2023 03:30 PM UTC
OFFICIAL NOTICE 59-1-2023
WORK ON THIS PROJECT SHALL INCLUDE, BUT NOT LIMITED TO: THE REMOVAL OF EXISTING LIGHTING FIXTURE UNITS AND INSTALLATION OF NEW LIGHING LED FIXTURE UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, ETC.; Located at: ST240230504 – 2023 LED Street Lighting Improvements @ Various Locations (City Wide)
06/06/2023 03:30 PM UTC
OFFICIAL NOTICE 14-3-2023
COMBINED SEWER MAIN RELAY AND LINING Located at: N. 17th St. – W. Concordia Ave. to W. Keefe Ave. W. Concordia Ave. – N. Dr. Martin Luther King Jr. Dr. to N. 6th St. N. Dousman St. – E. Concordia Ave. to 285’ +/- N. of E. Randolph Ct. N. Hubbard St. – E. Wright St. to E. Center St. N. Palmer St. – E. Ring St. to E. Concordia Ave.
06/01/2023 03:30 PM UTC
OFFICIAL NOTICE 14-1-2023
SANITARY SEWER MANHOLE INSPECTIONS Located at: Various locations within the City Of Milwaukee
06/01/2023 03:30 PM UTC
OFFICIAL NOTICE 14-2-2023
COMBINED SEWER LINING & MANHOLE REPAIR AND LINING Located at: N. 25th St. – 50’ +/- S. of W. St. Paul Ave. to 50’ +/- N. of W. St. Paul Ave. N. 31st St. – W. Burleigh St. to W. Auer Ave. E. Belleview Pl. - N. Maryland Ave. to N. Stowell Ave.
06/01/2023 03:30 PM UTC
OFFICIAL NOTICE 72-1-2023
VEL R. PHILLIPS PLAZA
05/31/2023 03:30 PM UTC
OFFICIAL NOTICE 60-1-2023
WATER MAIN RELAYS, at the following locations: W. Klein Ave (WT410220602), S.13th St. to S. 15th Pl. (21 working days); W. Wanda Ave. (WT410220603), S. 14th St. to S. 15th Pl. (18 working days); W. Denis Ave. (WT410220603), S. 14th St. to S. 15th Pl. (18 working days); S. 15th Pl. (WT410220605), W. Denis Ave. to W. Wanda Ave. (7 Working Days); N. 14th St. (WT410220606), W. Grange Ave. to W. Klein Ave. (17 Working Days); S. 20th Pl. (WT410220656), W. Tripoli Ave. to W. Howard Ave. (12 Working Days); W. Tripoli Ave. (WT410220657), S. 20th St. to S. 24th St. (29 Working Days); W. Wilbur Ave. (WT410220658), S. 20th St. to S. 23rd St. (22 Working Days); S. 25th St. (WT410220659), 425’ N/O W. Wilbur Ave. to W. Wilbur Ave. (9 Working Days); S. 23rd St. (WT410220660), W. Wilbur Ave. to 280’ S/O W. Wilbur Ave. (9 Working Days); W. Ramsey Ave. (WT410220700), S. 23rd St. to S. 27th St. (23 Working Days); S. 22nd St. (WT410220701), W. Henry Ave. to W. Bridge St. (12 Working Days); S. 23rd St. (WT410220702), W. Henry St. to W. Kimberly Ave. (18 Working Days); W. Henry Ave (WT410220703), S. 23rd St. to S. 25th Ct. (12 Working Days). (Note: Contractor to furnish and install approximately 11819 lin. ft. of 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
05/30/2023 03:30 PM UTC
OFFICIAL NOTICE 32-1-2023
CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT, 8” HIGH EARLY STRENGTH CONCRETE PAVEMENT, 8’ CONCRETE BASE, VARIABLE THICKNESS CONCRETE BASE, REPAIR PAVEMENT SEALING JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, PAVEMENT GRINDING, 8” CONCRETE DRIVEWAY, 8” HIGH EARLY STRENGTH CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, CUC, ETC.; Located at: ST211180195 - North Fratney Street - East Vienna Avenue to East Capitol Drive ST211190140 - East Vienna Avenue - North Humboldt Boulevard. to North Holton Street
05/24/2023 03:30 PM UTC
241 - 250 of 1490 Solicitations
1 2 21 22 23 25 27 28 29 148 149