General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 55-1-2026
Kneeland Properties Infrastructure Improvement Project - 825, 907, and 1025 West Mt. Vernon Avenue, Milwaukee, WI
06/30/2026 03:30 PM UTC
OFFICIAL NOTICE 6-2-2026
PROJECT NO. 2: COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING N. 15th St. – W. Meinecke Ave. to W. Wright St. N. 15th St. – W. North Ave. to W. Meinecke Ave.
07/01/2026 03:30 PM UTC
OFFICIAL NOTICE 6-1-2026
PROJECT NO. 1: SANITARY AND STORM SEWER MAIN RELAY & SANITARY SEWER MAIN LINING. Located at: N. 42nd St. – 50’ S. of W. Courtland Ave. to 50' N. of W. Courtland Ave. N. 55th St.– W. Townsend St. to W. Keefe Ave. W. Keefe Ave.– N. 53rd St. to N. 60th St.
07/01/2026 03:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 67-1-2024
200 Lead Service Line Replacement - Equity Prioritization Program
05/23/2024 03:30 PM UTC
OFFICIAL NOTICE 9-1-2024
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, PAVEMENT GRINDING, 7” AND 8” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” AND 7” CONCRETE WALKS, PAVEMENT GRINDING, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, CUC ADJUSTMENTS, ETC.; ST211220229 – East Montana Street – from South Quincy Avenue to South Howell Avenue
05/16/2024 03:30 PM UTC
OFFICIAL NOTICE 34-1-2024
PROJECT NO. 1: SANITARY BYPASS PUMP REHABILITATION Located at: Various Locations
05/09/2024 03:30 PM UTC
OFFICIAL NOTICE 59-1-2024
The project generally consists of providing the replacement of seven (7) Automatic Transfer Switches (ATS) with PLC controllers and Master Generator Synchronous Controller. The intent is to replace the rollout switch assembly and controller, keeping the cabinet and manual bypass intact. Building shall remain operational throughout project.
05/08/2024 03:30 PM UTC
OFFICIAL NOTICE 65-1-2024
350 LEAD SERVICE LINE REPLACEMENTS - EQUITY PRIORITIZATION PROGRAM
05/03/2024 03:30 PM UTC
OFFICIAL NOTICE 65-2-2024
350 LEAD SERVICE LINE REPLACEMENTS - EQUITY PRIORITIZATION PROGRAM
05/03/2024 03:30 PM UTC
OFFICIAL NOTICE 65-3-2024
350 Lead Service Line Replacements - Equity Prioritization Program
05/03/2024 03:30 PM UTC
OFFICIAL NOTICE 65-4-2024
150 Lead Service Line Replacements - Equity Prioritization Program
05/03/2024 03:30 PM UTC
OFFICIAL NOTICE 45-1-2024
The general work requested is: THE REMOVAL OF EXISTING LIGHTING UNITS AND INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, ETC.; Located at: RG1515236326 –2024 LED Street Lighting Improvements/Upgrades – Phase 2 @ Various Locations (City Wide)
05/02/2024 03:30 PM UTC
OFFICIAL NOTICE 53-1-2024
PROJECT NO. 1: STORMWATER POND IN: N. 31st St. - W. Capitol Dr. to 250' N. of W. Capitol Dr.
04/30/2024 03:30 PM UTC
241 - 250 of 1588 Solicitations
1 2 21 22 23 25 27 28 29 158 159