General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 78-1-2024
This project consists of the demolition, disposal, and replacement of an uninterruptible power supply (UPS) at Florist Pumping Station.
08/20/2024 03:30 PM UTC
OFFICIAL NOTICE 97-1-2024
ABB SANITARY SEWER CLEANING AND EXAMINATION in: Area bounded by: S. 6th St to S. 24th St. and W. Waterford Ave. to W. Ramsey Ave.
08/16/2024 03:30 PM UTC
OFFICIAL NOTICE 46-1-2024
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded By (ABB): ST212220121 - North Bremen Street, East Center Street, East Clarke Street, and North Weil Street (Permeable Alley) ST212220110 - West Burleigh Street, West Chamber Street, North 88th Street, and North 89th Street (Permeable Alley) ST212230101 - West Capitol Drive, West Melvina Street, North 52nd Street, and North 53rd Street (Permeable Alley) ST212220117 - West Galena Street, West Vliet Street, North 51st Street, and North 52nd Street (Permeable Alley) ST212220120 - West Congress Street, West Marion Street, South 61st Street, and South 63rd Street (Permeable Alley) ST212220109 - West Rohr Avenue, North Sherman Boulevard, West Villard Avenue and North 44th Street (Permeable Alley)
08/15/2024 03:30 PM UTC
OFFICIAL NOTICE 23-1-2024
CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, TREE CLEARING & GRUBBING, ETC.; Located at: ST320210201 - North 20th Street Powerline and Beerline Trail Pedestrian/Bike Improvements (Wisconsin Department of Transportation ID No. 2984-22-75)
08/14/2024 03:30 PM UTC
OFFICIAL NOTICE 86-1-2024
COMBINED SEWER MAIN RELAY, COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING IN: E. Bennett Ave. – S. Mabbett Ave. to S. Kinnickinnic Ave. S. California St. – E. Pryor Ave. to S. Kinnickinnic Ave. S. Ellen St. – S. Kinnickinnic Ave. to E. Rusk Ave. E. Estes St. – S. Ellen St. to S. Wentworth Ave. E. Rusk Ave. – 40’+/- W. of S. Linebarger Terr. to S. Ellen St. E. Seeley St. – S. Clement Ave. to 450’ E. of S. Clement Ave.
08/07/2024 03:30 PM UTC
OFFICIAL NOTICE 21-1-2024
PROJECT NO.1: COMBINED SEWER MAIN RELAY IN: N. 40th St. – W. Chambers St. to W. Burleigh St. Plan File:         2024-069, 2024-132         Dated: 7/1/24, 7/12/24 Project ID:       SM495230041 W. Auer Ave. – N. 28th St. to N. 30th St. Plan File:         2024-071, 2024-132          Dated: 6/28/24, 7/12/24 Project ID:       SM495230056 W. Chambers St. – N. 28th St. to 130' +/- W. of N. 30th St. Plan File:         2023-097, 2023-132          Dated: 4/9/24, 7/12/24 Project ID:       SM495240018
07/31/2024 03:30 PM UTC
OFFICIAL NOTICE 21-2-2024
SANITARY SEWER CLEANING AND EXAMINATION in: Area bounded by: From S. 6th St to S. 24th St. From W. Waterford Ave. to W. Ramsey Ave.
07/31/2024 03:30 PM UTC
OFFICIAL NOTICE 20-1-2024
PROJECT NO.1: COMBINED SEWER MAIN RELAY & COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING IN: N. 53rd St. – W. Galena St. to W. Washington Blvd. Plan File: 2024-060, 2024-065 Dated: 5/10/2024, 5/21/2024 Project ID: SM495230047 N. 53rd St. – W. Vliet St. to W. Galena St. Plan File: 2024-054 Dated: 5/20/2024 Project ID: SM495230049 N. 54th St. – W. Vliet St. to W. Washington Blvd. Plan File: 2024-034, 2024-065, 2024-116 Dated: 5/21/2024, 5/22/2024 Project ID: SM495230031 W. Cherry St. – N. 48th St. to N. 49th St. Plan File: 2024-065 Dated: 5/21/2024 Project ID: SM495230054 W. Cherry St. – N. 54th St. to N. Hawley Rd. Plan File: 2024-065, 2024-066 Dated: 5/21/2024, 5/22/2024 Project ID: SM495230053 W. Galena St. – N. 53rd St. to N. Hawley Rd. Plan File: 2024-053, 2024-065 Dated: 5/21/2024, 5/24/2024 Project ID: SM495230052 N. Hawley Rd. – W. Vliet St. to W. Galena St. Plan File: 2024-037 Dated: 2/29/2024 Project ID: SM495230035
07/15/2024 03:30 PM UTC
OFFICIAL NOTICE 20-2-2024
PROJECT NO.2: SANITARY SEWER MAIN RELAY, SANITARY SEWER MAIN LINING & MANHOLE REPAIR AND LINING, COMBINED SEWER MAIN RELAY & COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING IN: N. 60th St. – 250' S. of W. Wright St. to 300’ N. of W. Clarke St. Plan File: 2024-028, 2024-029, 2024-030 Dated: 1/24/2024 Project ID: SM495230028 W. Vine St. – N. 51st St. to N. 55th St. Plan File: 2024-067, 2024-068 Dated: 5/28/2024 Project ID: SM495230046
07/15/2024 03:30 PM UTC
OFFICIAL NOTICE 73-1-2024
The general work requested is: CONSTRUCTION STAKING ELECTRICAL INSTALLATION, REMOVAL OF EXISTING LIGHTING UNITS AND INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, CONDUIT, ELECTRICAL CABLE, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, ETC.; RG1515236321B – Area Bounded By (ABB): West Congress Street, North 12th Street, North 19th Place, and West Atkinson Avenue
07/12/2024 03:30 PM UTC
231 - 240 of 1601 Solicitations
1 2 20 21 22 24 26 27 28 160 161