General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 57-1-2025
WATER MAIN RELAYS, at the following locations: S. 20TH ST (WT410220709), W COLLEGE AV TO W WOOD AVE, (53 working days); W. CARRINGTON AV. (WT410220710), S. 19TH ST. TO S. 20TH ST. , (7 working days); S. 86TH ST. (WT410240629), 250' N/O W. BURDICK AV. TO W. OHIO AV., (11 working days); S. 85TH ST. (WT410240630), 560' N/O W. OHIO AV. TO W. OHIO AV., (12 working days); W. OHIO AV. (WT410240631), S. 84TH ST. TO S. 86TH ST., (10 working days); N. JACKSON ST. (WT410240632), E. MICHIGAN ST. TO E. WISCONSIN AV., (9 working days); W. KIEHNAU AV. (WT410240659), N. 40TH ST. TO N 43RD ST., (17 working days); N. 42ND ST. (WT410240660), W. KIEHNAU AV. TO 910' N/O W. KIEHNAU AV., (17 working days); W. HEMLOCK RD. (WT410240661), N. 51ST BL. TO W. GREENWOOD TR., (26 working days); N. 52ND ST. (WT410240662), W. HEMLOCK RD. TO W. CALUMET RD., (21 working days); W. PORTAGE AV. (WT410240663), N. 53RD ST. TO N. 55TH ST., (12 working days); (Note: Contractor to furnish and install approximately 10,430.00 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/20/2025 03:30 PM UTC
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 27-1-2025
PROJECT 1: SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & SANITARY SEWER MAIN REPAIR S. 6th St. - W. Ohio Ave. to 480’ S. of W. Ohio Ave. S. Austin St. – E. Van Norman Ave. to E. Armour Ave. N. Bartlett Ave. – E. Kane Pl. to 200’+/- NE. of E. Kane Pl. E. Howard Ave. – S. Kansas Ave. to 210’+/- E. of S. Kansas Ave. E. Howard Ave. – S. Nevada St. to S. Brust Ave. S. Kansas Ave. – E. Howard Ave. to E. Norwich Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 27-2-2025
PROJECT NO. 2: COMBINED SEWER MAIN RELAY Located at: N. 15th St. – W. Concordia Ave. to W. Keefe Ave. N. 16th St. – W. Ring St. to W. Keefe Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
8 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 14-1-2023
SANITARY SEWER MANHOLE INSPECTIONS Located at: Various locations within the City Of Milwaukee
06/01/2023 03:30 PM UTC
OFFICIAL NOTICE 14-2-2023
COMBINED SEWER LINING & MANHOLE REPAIR AND LINING Located at: N. 25th St. – 50’ +/- S. of W. St. Paul Ave. to 50’ +/- N. of W. St. Paul Ave. N. 31st St. – W. Burleigh St. to W. Auer Ave. E. Belleview Pl. - N. Maryland Ave. to N. Stowell Ave.
06/01/2023 03:30 PM UTC
OFFICIAL NOTICE 72-1-2023
VEL R. PHILLIPS PLAZA
05/31/2023 03:30 PM UTC
OFFICIAL NOTICE 60-1-2023
WATER MAIN RELAYS, at the following locations: W. Klein Ave (WT410220602), S.13th St. to S. 15th Pl. (21 working days); W. Wanda Ave. (WT410220603), S. 14th St. to S. 15th Pl. (18 working days); W. Denis Ave. (WT410220603), S. 14th St. to S. 15th Pl. (18 working days); S. 15th Pl. (WT410220605), W. Denis Ave. to W. Wanda Ave. (7 Working Days); N. 14th St. (WT410220606), W. Grange Ave. to W. Klein Ave. (17 Working Days); S. 20th Pl. (WT410220656), W. Tripoli Ave. to W. Howard Ave. (12 Working Days); W. Tripoli Ave. (WT410220657), S. 20th St. to S. 24th St. (29 Working Days); W. Wilbur Ave. (WT410220658), S. 20th St. to S. 23rd St. (22 Working Days); S. 25th St. (WT410220659), 425’ N/O W. Wilbur Ave. to W. Wilbur Ave. (9 Working Days); S. 23rd St. (WT410220660), W. Wilbur Ave. to 280’ S/O W. Wilbur Ave. (9 Working Days); W. Ramsey Ave. (WT410220700), S. 23rd St. to S. 27th St. (23 Working Days); S. 22nd St. (WT410220701), W. Henry Ave. to W. Bridge St. (12 Working Days); S. 23rd St. (WT410220702), W. Henry St. to W. Kimberly Ave. (18 Working Days); W. Henry Ave (WT410220703), S. 23rd St. to S. 25th Ct. (12 Working Days). (Note: Contractor to furnish and install approximately 11819 lin. ft. of 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
05/30/2023 03:30 PM UTC
OFFICIAL NOTICE 32-1-2023
CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT, 8” HIGH EARLY STRENGTH CONCRETE PAVEMENT, 8’ CONCRETE BASE, VARIABLE THICKNESS CONCRETE BASE, REPAIR PAVEMENT SEALING JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, PAVEMENT GRINDING, 8” CONCRETE DRIVEWAY, 8” HIGH EARLY STRENGTH CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, CUC, ETC.; Located at: ST211180195 - North Fratney Street - East Vienna Avenue to East Capitol Drive ST211190140 - East Vienna Avenue - North Humboldt Boulevard. to North Holton Street
05/24/2023 03:30 PM UTC
OFFICIAL NOTICE 48-1-2023
PROJECT 1: BIOSWALES Located at: W. Fond du Lac Ave. – N. 76th St. to 459’ +/- west of W. Sheridan Ave. W. Good Hope Rd. – N. 110th St. to N. 124th St.
05/18/2023 03:30 PM UTC
OFFICIAL NOTICE 16-1-2023
BUILDING SANITARY SEWER LATERAL REPLACEMENT & LEAD SERVICE LINE REPLACEMENT IN THE CITY OF MILWAUKEE
05/17/2023 03:30 PM UTC
OFFICIAL NOTICE 42-1-2023
CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8”CONCRETE PAVEMENT, 6’ CONCRETE BASE, VARIABLE THICKNESS CONCRETE BASE, REPAIR PAVEMENT JOINTS AND CRACKS, SEALING JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, ETC.; Located at: ST211150111 - South 94th Street - West Howard Avenue to a pt. 600' n/o West Howard Avenue ST211180218 - South 48th Street - West Forest Home Avenue to West Oklahoma Avenue
05/16/2023 03:30 PM UTC
OFFICIAL NOTICE 56-1-2023
Vel R. Phillips Plaza
05/15/2023 03:30 PM UTC
OFFICIAL NOTICE 56-1-2023
Vel R. Phillips Plaza
05/11/2023 03:30 PM UTC
231 - 240 of 1475 Solicitations
1 2 20 21 22 24 26 27 28 147 148