General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 81-1-2025
PROJECT NO.1: ROADWAY NARROWING, PAVING, GREEN INFRASTRUCTURE, AND TRAFFIC SAFETY PROJECT IN: S. 1ST St. – S. Chase Ave. to W. Lincoln Ave.
08/07/2025 03:30 PM UTC
OFFICIAL NOTICE 91-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
08/08/2025 03:30 PM UTC
OFFICIAL NOTICE 78-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; Street Lighting Upgrades for: ST3202318100 – Street Lighting Improvement for Carbon Reduction Program @ Various Locations
08/15/2025 03:30 PM UTC
OFFICIAL NOTICE 90-1-2025
CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, PAVERS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS, GRAVEL FILLING, CRUSHED GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER ALTERATIONS, STREET LIGHTING, UNDERGROUND CONDUIT, LANDSCAPING, TOPSOILING, ETC.
08/19/2025 03:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 86-1-2023
LEAD SERVICE LINE REPLACEMENTS
08/28/2023 03:30 PM UTC
OFFICIAL NOTICE 73-1-2023
CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT, 6’ CONCRETE BASE, VARIABLE THICKNESS CONCRETE BASE, REPAIR PAVEMENT JOINTS AND CRACKS, SEALING JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, SPEED HUMP SIGNAGEASSEMBLY, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, ETC.; Located at: ST211210156 - North 84th St. - West Congress Street to West Hampton Avenue ST211210198 – West Glendale Avenue - North 84th Street to 87th Street
08/22/2023 03:30 PM UTC
OFFICIAL NOTICE 80-1-2023
2nd and Plankinton parking structure east passenger elevator hoistway repair and replace.
08/17/2023 03:30 PM UTC
OFFICIAL NOTICE 65-1-2023
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, PERMEABLE PAVERS, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded By (ABB): ST212210105 – West Euclid Avenue, West Oklahoma Avenue, South 7th Street, & South 8th Street ST212220106 – North Farwell Avenue, East Irving Place, East Lafayette Place, & North Oakland Avenue ST212220105 – West Florist Avenue, West Oriole Drive, North 34th Street, & North 35th Street ST212220103 – West Glendale Avenue, West Rudy Avenue, North 41st Street, & North 42nd Street
08/10/2023 03:30 PM UTC
OFFICIAL NOTICE 17-1-2023
SANITARY SEWER MAIN RELAY, COMBINED SEWER MAIN RELAY, AND COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING: Located at: S. Illinois Ave. – 255' +/- N. of E. Holt Ave. to E. Morgan Ave. S. Mabbett Ave. – E. Bennett Ave. to E. Oklahoma Ave. E. Malvern Pl. – S. Kinnickinnic Ave. to S. Pennsylvania Ave. E. Oklahoma Ave. – S. Mabbett Ave. to S. Pennsylvania Ave. S. Pennsylvania Ave. – E. Ohio Ave. to E. Holt Ave. S. Pennsylvania Ave. – 176' N. of E. Oklahoma Ave. to E. Oklahoma Ave.
07/31/2023 03:30 PM UTC
OFFICIAL NOTICE 17-2-2023
SANITARY SEWER MAIN RELAY, NEW STORM SEWER, AND COMBINED SEWER MAIN RELAY: Located at: S. 9th Pl. – W. Montana St. to 300'+/- S. of W. Dakota St. S. 22nd St. – W. Greenfield Ave. to W. Orchard St. S. 41st St. – W. Greenfield Ave. to W. Orchard St. W. Orchard St. – S. 38th St. to S. 41st St. W. Walker St. – S. 5th St. to S. 6th St.
07/31/2023 03:30 PM UTC
OFFICIAL NOTICE 81-1-2023
WORK ON THIS PROJECT SHALL INCLUDE, BUT NOT LIMITED TO: TRAFFIC CONTROL, INSTALLATION OF VARIOUS STREET LIGTHING APPURTENANCE WORK, INSTALLATION OF STREET LIGHTING POLES, LIGHT POLE REMOVALS, INSTALLATION OF CONDUITS AND CABLES, ELECTRICAL APPURTENANCE REMOVALS, ETC.; Installation work at the following location: RG1515236326A – Street Lighting Series Conversion SG9-10 @ Various Locations
07/19/2023 03:30 PM UTC
OFFICIAL NOTICE 82-1-2023
WORK ON THIS PROJECT SHALL INCLUDE, BUT NOT LIMITED TO: TRAFFIC CONTROL, INSTALLATION OF VARIOUS STREET LIGTHING APPURTENANCE WORK, INSTALLATION OF STREET LIGHTING POLES, LIGHT POLE REMOVALS, INSTALLATION OF CONDUITS AND CABLES, ELECTRICAL APPURTENANCE REMOVALS, ETC.; Installation work at the following location: RG1515236326 – Street Lighting Series Conversion SO5-6 @ Various Locations
07/19/2023 03:30 PM UTC
OFFICIAL NOTICE 68-1-2023
REMOVAL AND CONSTRUCTION OF: 5 INCH CONCRETE WALKS, 7 INCH CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, SAWING AND SODDING & TOPSOIL, GRAVEL FILLING, OTHER CONCRETE REMOVALS, ETC.; Located at: ST230230102 – 2023 Scattered Sites Sidewalk Replacements At Various Locations City Wide
07/18/2023 03:30 PM UTC
OFFICIAL NOTICE 83-1-2023
CONSTRUCTION OF 5” CONCRETE WALK, CONCRETE WALK WITH INTEGRAL CURB, 7” CONCRETE DRIVEWAY, HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, CONCRETE CURB AND GUTTER, 7” HIGH EARLY STRENGHT CONCRETE DRIVEWAY, 8” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIOUS CONCRETE REMOVALS, GRAVEL FILING, DETECTABLE WARNING FIELDS, MANHOLE/INLET ADJUSTMENTS, AND SODDING & TOPSOIL , OTHER REMOVALS, ETC.; Located at: ST230230101 - Area Bounded By: East North Avenue, North Oakland Avenue, East Irving Place, East Boylston Street, and Milwaukee River Area Bounded By: North Lake Drive, North Wahl Avenue, and East Belleview Place Area Bounded By: West Vine Street, North 47th Street, West Lloyd Street, and North Hi Mount Boulevard Also Include: 2043 East North Avenue and 6506 West Warnimont Avenue ST216230105 - ADA Ramps for 2023 Areawide Sidewalk Replacement
07/10/2023 03:30 PM UTC
221 - 230 of 1490 Solicitations
1 2 19 20 21 23 25 26 27 148 149