General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE NO. 11-1-2026
Description: Construction of Handicap Concrete Ramps Per ADA Requirements, Construction Staking of Ramps, Detectable Warning Field, 5” Concrete Walk, Concrete Walk and/or Driveway, Concrete Curb & Gutter, 6” Concrete Pavement Variable Thickness Concrete Base, Variable Thickness Asphaltic Concrete Pavement, Various Concrete Removals, Sewer Work, Installation of Conduit and other Appurtenance Underground Work, ETC.; Located at: ST216250111 – ADA Ramps for 2026 High Impact Paving @ Various Locations (South Side Projects). The scope of this contract is to remove and replace the ADA ramp on Menomonee River Pkwy/Tower View Rd. In addition, all of the pedestrian ramps within the limits of the following “high-impact” asphalt paving projects as follows: O.N. 14-1-2026 S. 52nd Pl. - W. Cleveland Av. to S. 53rd St. N. 68th St. - W. Center St. to W. Lisbon Av. N. 80th St. - W. Burleigh St. to W. Lisbon Av. N. 81st St. - W. Lorraine Pl. to W. Burleigh St. S. 89th St. - W. Howard Av. to W. Warnimont Av. S. 90th St. - W. Crawford Av. to W. Warnimont Av. N. 90th St. - W. Hawthorne Av. to W. Mt. Vernon Av. S. 91st St. - W. Morgan Av. to W. Holt Av. S. 99th St./Ct. - A point south of W. Ohio Av. to W. Oklahoma Av. W. Concordia Av. - N. 84th St. to N. 92nd St. W. Mount Ct. - N. 54th St. to N. 55th St. W. Ohio Av. - S. 97th St. to S. 99th Ct. W. St. Paul Av. - N. Hawley Rd. to N. 62nd St. O.N. 15-1-2026 S. 1st Pl.- W. Bolivar Av. to W. Waterford Av. S. 1st St. - W. Bolivar Av. to W. Waterford Av. S. 2nd St. - W. Bolivar Av. to W. Waterford Av. S. 5th Pl. - W. Armour Av. to W. Bottsford Av. S. 10th St. - W. Washington St. to W. National Av. S. 14th St. - A point south of W. Cleveland Av. to W. Cleveland Av. S. 29th St. - W. Lapham St. to W. Greenfield Av. S. 34th St. - W. Kinnickinnic River Pk. to W. Forest Home Av. S. 34th St. - W. Oklahoma Av. to W. Manitoba St. E. Armour Av. - S. Quincy Av. to S. Howell Av. E. Euclid Av. - S. Brust St. to S. Clement Av. E. Falling Heath Pl. - S. Kinnickinnic Av. to S. Pennsylvania Av. S. Hanson Av. - E. Howard Av. to E. Saveland Av. E. Malvern Pl. - S. Pennsylvania Av. to S. Kinnickinnic Av. W. Manitoba St. - S. 6th St. to S. 11th St. W. Rogers St. - S. 6th St. to Point east of S. 8th St. E. Tripoli Av. - S. Brust Av. to S. Hanson Av.
03/18/2026 03:30 PM UTC
OFFICIAL NOTICE 37-1-2026
PROJECT 1: 2026 SANITARY BYPASS PUMP CONTROL CABINET REPLACEMENT AND SERVICE UPGRADES Located at: Various Locations
03/19/2026 03:30 PM UTC
OFFICIAL NOTICE 46-1-2026
Concrete Repairs and Painting of the Lower Level of MacArthur Square Parking Structure
03/25/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
05/04/2026 03:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 67-1-2024
200 Lead Service Line Replacement - Equity Prioritization Program
05/23/2024 03:30 PM UTC
OFFICIAL NOTICE 9-1-2024
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, PAVEMENT GRINDING, 7” AND 8” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” AND 7” CONCRETE WALKS, PAVEMENT GRINDING, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, CUC ADJUSTMENTS, ETC.; ST211220229 – East Montana Street – from South Quincy Avenue to South Howell Avenue
05/16/2024 03:30 PM UTC
OFFICIAL NOTICE 34-1-2024
PROJECT NO. 1: SANITARY BYPASS PUMP REHABILITATION Located at: Various Locations
05/09/2024 03:30 PM UTC
OFFICIAL NOTICE 59-1-2024
The project generally consists of providing the replacement of seven (7) Automatic Transfer Switches (ATS) with PLC controllers and Master Generator Synchronous Controller. The intent is to replace the rollout switch assembly and controller, keeping the cabinet and manual bypass intact. Building shall remain operational throughout project.
05/08/2024 03:30 PM UTC
OFFICIAL NOTICE 65-1-2024
350 LEAD SERVICE LINE REPLACEMENTS - EQUITY PRIORITIZATION PROGRAM
05/03/2024 03:30 PM UTC
OFFICIAL NOTICE 65-2-2024
350 LEAD SERVICE LINE REPLACEMENTS - EQUITY PRIORITIZATION PROGRAM
05/03/2024 03:30 PM UTC
OFFICIAL NOTICE 65-3-2024
350 Lead Service Line Replacements - Equity Prioritization Program
05/03/2024 03:30 PM UTC
OFFICIAL NOTICE 65-4-2024
150 Lead Service Line Replacements - Equity Prioritization Program
05/03/2024 03:30 PM UTC
OFFICIAL NOTICE 45-1-2024
The general work requested is: THE REMOVAL OF EXISTING LIGHTING UNITS AND INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, ETC.; Located at: RG1515236326 –2024 LED Street Lighting Improvements/Upgrades – Phase 2 @ Various Locations (City Wide)
05/02/2024 03:30 PM UTC
OFFICIAL NOTICE 53-1-2024
PROJECT NO. 1: STORMWATER POND IN: N. 31st St. - W. Capitol Dr. to 250' N. of W. Capitol Dr.
04/30/2024 03:30 PM UTC
201 - 210 of 1548 Solicitations
1 2 17 18 19 21 23 24 25 154 155