General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 83-1-2023
CONSTRUCTION OF 5” CONCRETE WALK, CONCRETE WALK WITH INTEGRAL CURB, 7” CONCRETE DRIVEWAY, HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, CONCRETE CURB AND GUTTER, 7” HIGH EARLY STRENGHT CONCRETE DRIVEWAY, 8” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIOUS CONCRETE REMOVALS, GRAVEL FILING, DETECTABLE WARNING FIELDS, MANHOLE/INLET ADJUSTMENTS, AND SODDING & TOPSOIL , OTHER REMOVALS, ETC.; Located at: ST230230101 - Area Bounded By: East North Avenue, North Oakland Avenue, East Irving Place, East Boylston Street, and Milwaukee River Area Bounded By: North Lake Drive, North Wahl Avenue, and East Belleview Place Area Bounded By: West Vine Street, North 47th Street, West Lloyd Street, and North Hi Mount Boulevard Also Include: 2043 East North Avenue and 6506 West Warnimont Avenue ST216230105 - ADA Ramps for 2023 Areawide Sidewalk Replacement
07/10/2023 03:30 PM UTC
OFFICIAL NOTICE 15-1-2023
SANITARY SEWER LINING, COMBINED SEWER MAIN RELAY, COMBINED SEWER LINING & MANHOLE REPAIR AND LINING IN: N. 25th St. – W. Nash St. to 185’ +/- S. of W. Melvina St. Plan File: 2023-017, 2023-018 and 2023-164 N. 27th St. – W. Keefe Ave. (ext.) to W. Nash St. Plan File: 2023-028 and 2023-037 N. 70th St. – W. Locust St. to 950’ +/- N. of W. Locust St. Plan File: 2022-027 and 2023-028
06/30/2023 03:30 PM UTC
OFFICIAL NOTICE 15-2-2023
PROJECT NO.2: COMBINED SEWER RELAY, COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING IN: N. 38th St. – 150’ South of W. Roberts St. to W. Roberts St. W. Roberts St. – N. 37th St. to N. 40th St.
06/30/2023 03:30 PM UTC
OFFICIAL NOTICE 70-1-2023
REMOVAL/PRUNING OF DEAD AND HAZARD TREES OR BRANCHES. Work performed under this contract shall consist of dead and hazard tree abatement throughout the City of Milwaukee. The CONTRACTOR shall furnish all labor, supervision, administration, materials, equipment, disposal, utility coordination, insurance, licenses, and permits as required for removal/hazard pruning of dead and hazard trees or branches from privately owned properties in violation of City Ordinance 116-53 and City-owned Properties.
06/28/2023 03:30 PM UTC
OFFICIAL NOTICE 75-1-2023
CONSTRUCTION, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS APPURTENCES REMOVALS, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKINGS, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, ETC.; Located at: ST211180196 – South 32nd Street - West. Madison Street to a pt. 400' n/o West National Avenue ST211200131 – West Grant Street - South 33rd Street to South 35th Street ST221230208 – US Grant School, near 2920 West Grant Street (Traffic Circles & Crosswalks)
06/23/2023 03:30 PM UTC
OFFICIAL NOTICE 63-1-2023
Rehabilitation of South Abutment and Installation Debris Netting at The South 16TH Street Viaduct
06/21/2023 03:30 PM UTC
OFFICIAL NOTICE 61-1-2023
WATER MAIN RELAYS, at the following locations: W. St. Paul Av. (WT410180615), N. 13th St. to 72’ W/O N. 17th St. (42 working days); W. St. Paul Av. (WT410180614), 72’ W/O N. 17th St. to 600’ E/O W. Greves St. (37 working days); W. St. Paul Av. (WT410180613), 600’ E/O W. Greves St. to N. 25th St. (22 working days); W. Greves St. (WT410180616), W. St. Paul Av. to 250’ E/O N. 25th St. (9 working days) (Note: Contractor to furnish and install approximately 5410 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/20/2023 03:30 PM UTC
OFFICIAL NOTICE 69-1-2023
Installation of concrete traffic islands, pavement markings, and flexible delineators to address pedestrian, bicyclist, and motor vehicle traffic safety concerns.
06/14/2023 03:30 PM UTC
OFFICIAL NOTICE 74-1-2023
STORM BOX CULVERT RELAY Located at: N. 60th St. - Lincoln Creek 908' +/- N. of W. Hemlock St.
06/13/2023 03:30 PM UTC
OFFICIAL NOTICE 78-1-2023
COMBINED SEWER MAIN RELAY AND LINING Located at: N. 17th St. – W. Concordia Ave. to W. Keefe Ave. W. Concordia Ave. – N. Dr. Martin Luther King Jr. Dr. to N. 6th St. N. Dousman St. – E. Concordia Ave. to 285’ +/- N. of E. Randolph Ct. N. Hubbard St. – E. Wright St. to E. Center St. N. Palmer St. – E. Ring St. to E. Concordia Ave.
06/13/2023 03:30 PM UTC
341 - 350 of 1601 Solicitations
1 2 31 32 33 35 37 38 39 160 161