General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 57-1-2025
WATER MAIN RELAYS, at the following locations: S. 20TH ST (WT410220709), W COLLEGE AV TO W WOOD AVE, (53 working days); W. CARRINGTON AV. (WT410220710), S. 19TH ST. TO S. 20TH ST. , (7 working days); S. 86TH ST. (WT410240629), 250' N/O W. BURDICK AV. TO W. OHIO AV., (11 working days); S. 85TH ST. (WT410240630), 560' N/O W. OHIO AV. TO W. OHIO AV., (12 working days); W. OHIO AV. (WT410240631), S. 84TH ST. TO S. 86TH ST., (10 working days); N. JACKSON ST. (WT410240632), E. MICHIGAN ST. TO E. WISCONSIN AV., (9 working days); W. KIEHNAU AV. (WT410240659), N. 40TH ST. TO N 43RD ST., (17 working days); N. 42ND ST. (WT410240660), W. KIEHNAU AV. TO 910' N/O W. KIEHNAU AV., (17 working days); W. HEMLOCK RD. (WT410240661), N. 51ST BL. TO W. GREENWOOD TR., (26 working days); N. 52ND ST. (WT410240662), W. HEMLOCK RD. TO W. CALUMET RD., (21 working days); W. PORTAGE AV. (WT410240663), N. 53RD ST. TO N. 55TH ST., (12 working days); (Note: Contractor to furnish and install approximately 10,430.00 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/20/2025 03:30 PM UTC
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 27-1-2025
PROJECT 1: SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & SANITARY SEWER MAIN REPAIR S. 6th St. - W. Ohio Ave. to 480’ S. of W. Ohio Ave. S. Austin St. – E. Van Norman Ave. to E. Armour Ave. N. Bartlett Ave. – E. Kane Pl. to 200’+/- NE. of E. Kane Pl. E. Howard Ave. – S. Kansas Ave. to 210’+/- E. of S. Kansas Ave. E. Howard Ave. – S. Nevada St. to S. Brust Ave. S. Kansas Ave. – E. Howard Ave. to E. Norwich Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 27-2-2025
PROJECT NO. 2: COMBINED SEWER MAIN RELAY Located at: N. 15th St. – W. Concordia Ave. to W. Keefe Ave. N. 16th St. – W. Ring St. to W. Keefe Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
8 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 42-3-2022
GROUNDS-KEEPING SERVICES at the following locations: Howard Avenue Water Treatment Plant (3929 S. 6th St.), Texas Pumping Station (2900 E. Texas Ave.), Grange Pumping Station (5353 S. 43rd St., Greenfield), Lincoln Pumping Station (3641 W. Lincoln Ave.) and Greenfield Elevated Storage Tank (8787 W. Waterford Ave., Greenfield)
03/21/2022 03:30 PM UTC
OFFICIAL NOTICE 41-1-2022
100 LEAD SERVICE LINE REPLACEMENTS
03/09/2022 04:30 PM UTC
OFFICIAL NOTICE 36-1-2022
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 1: Central Forestry District: Area approximately bounded by W. Capitol Dr. and W I-94.
03/08/2022 04:30 PM UTC
OFFICIAL NOTICE 36-2-2022
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 2: South Forestry District: Area approximately bounded by W I-94 and South City Limits
03/08/2022 04:30 PM UTC
OFFICIAL NOTICE 36-3-2022
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 3: North Forestry District: Area approximately bounded by W Capitol Dr. and W County Line Rd
03/08/2022 04:30 PM UTC
OFFICIAL NOTICE 35-1-2022
CITY-WIDE REMOVAL OF WEEDS AND TALL GRASSES, SIDEWALK SNOW AND ICE, AND RIGHT-OF-WAY ENCROACHMENTS FROM PRIVATE PROPERTY IN VIOLATION OF CITY ORDINANCE 80-17, 116-8, AND 116-55.
03/07/2022 04:30 PM UTC
OFFICIAL NOTICE 9-1-2022
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC.; Located at: ST216220104 – High Impact Project Locations South 71st Street – West Burdick Avenue to West Lakefield Drive South Avalon Street – West Granada Street to South 15th Court (include South 15th Court) West Burdick Avenue – South 70th Street to South 71st Street East Carol Street – South Iowa Avenue to South Brust Avenue East Euclid Avenue – South 68th Street to South 70th Street West Granada Street – South 13th Street to South Avalon Street West Green Avenue – West Ramsey Avenue to South Melinda Street West Lakefield Drive – South 70th Street to West Oklahoma Avenue West Lincoln Avenue – South 1st Street to South Chase Avenue East Rhode Island Avenue – South Superior Street to East Fernwood Avenue West Tripoli Avenue – South Massachusetts Avenue to South 75th Street West Upham Court – South 18th Street to point west of South 18th Street
03/04/2022 04:30 PM UTC
OFFICIAL NOTICE 8-1-2022
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC.; Located at: ST216220103 – High Impact Project Locations East Juneau Avenue – North Prospect Avenue to North Van Buren Avenue East Kane Plane – North Summit Avenue to North Cambridge Avenue East Knapp Street - North Prospect Avenue to North Van Buren Start West Pierce Street - West Reynolds Place to South Layton Boulevard East Royall Place - North Prospect Avenue to North Oakland Avenue West Vliet Street - North 27th Street to North 47th Street
03/03/2022 04:30 PM UTC
OFFICIAL NOTICE 7-1-2022
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC.; Located at: ST216220102 – High Impact Project Locations North 7th Street - North Dr. Martin L King Jr. Drive to West Capitol Drive North 13th Street - A point south of West Vine Street to West Brown Street North 32nd Street - West Atkinson Avenue to West Cameron Avenue North 47th Street - West Vliet Street to West Lloyd Street North 51st Street - West Lisbon Avenue to West Center Street North Hopkins Street - West Villard Avenue. to North Sherman Boulevard West Locust Street - West Appleton Avenue to West Lisbon Avenue West Melvina Street - North 46th Street to West Leon Terrace
03/02/2022 04:30 PM UTC
OFFICIAL NOTICE 29-1-2022
Keenan Health Center ADA Compliance Program 3200 North 36th Street, Milwaukee, WI 53216
03/01/2022 04:30 PM UTC
381 - 390 of 1475 Solicitations
1 2 35 36 37 39 41 42 43 147 148