General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 97-1-2025
SANITARY SEWER MAIN RELAY AND SANITARY SEWER MAIN LINING IN: N. Lincoln Memorial Dr. – 550’ SW of the Pump Station at Bradford Beach to E. Kenwood Blvd.
11/05/2025 04:30 PM UTC
OFFICIAL NOTICE 97-2-2025
COMBINED SEWER MAIN LINING IN: Vacated W. Galena St. – Vacated N. 2nd St. to N. Dr. Martin Luther King Jr. Dr.
11/05/2025 04:30 PM UTC
OFFICIAL NOTICE 99-1-2025
WP-346 Linnwood Window Improvement Project
11/11/2025 04:30 PM UTC
OFFICIAL NOTICE 99-2-2025
WP-346 Cameron Window Improvement Project
11/11/2025 04:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 57-1-2022
Sanitary Bypass Pump Control Cabinet Replacement
05/03/2022 03:30 PM UTC
OFFICIAL NOTICE 55-1-2022
KP-55: KILBOURN PARK IMPROVEMENTS This project consists of the surface preparation of the existing American Legion Star at the Kilbourn Reservoir Park to be suitable for the resurfacing of the landmark. The resurfacing of the American Legion Star shall consists of new materials, as specified to match the previous colors. Located at: KILBOURN RESERVOIR PARK
04/29/2022 03:30 PM UTC
OFFICIAL NOTICE 54-2022
Transporting wood logs to Kettle Moraine Hardwoods
04/28/2022 03:00 PM UTC
OFFICIAL NOTICE 44-2022
RECYCLING OF RESIDENTIAL ASPHALT SHINGLES FROM THE CITY OF MILWAUKEE DROP OFF CENTERS
04/26/2022 03:30 PM UTC
OFFICIAL NOTICE 22-1-2022
CONSTRUCTION, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 8” CONCRETE BASE, 5” CONCRETE WALK, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT GRINDING/MILLING, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, PERMEABLE PAVER BLOCKS, , GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, ETC.; Located at: ST211120114 – West Ruby Avenue – North 36th Street to North Sherman Boulevard
04/22/2022 03:30 PM UTC
OFFICIAL NOTICE 39-1-2022
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded By (ABB): ST212040121 – ABB: East Linnwood Avenue, East Locust Street, North Prospect Avenue, to North Stowell Avenue ST212100104 – ABB: West Capitol Drive, West Fiebrantz Avenue, North 14th Street, to North 15th Street ST212170101 – ABB: West Center Street, North Grant Boulevard, West Hadley Street, to North 41st Street
04/21/2022 03:30 PM UTC
OFFICIAL NOTICE 60-2022
MILWAUKEE SEWER SCADA UPGRADE
04/20/2022 03:30 PM UTC
OFFICIAL NOTICE 13-1-2022
Floor Resurfacing – Building 36 Century City Business Park 3533 North 27th Street, Milwaukee, Wisconsin
04/19/2022 03:30 PM UTC
OFFICIAL NOTICE 51-2022
PROJECT 1 - WITKOWIAK PARK SURFACING – SYNTHETIC TURF 1656 South 4th Street, Milwaukee, WI 53204
04/18/2022 03:30 PM UTC
OFFICIAL NOTICE 51-2-2022
WITKOWIAK PARK SURFACING – FLEXIBLE POROUS PAVEMENT PATHWAYS & COURTS 1656 South 4th Street, Milwaukee, WI 53204
04/18/2022 03:30 PM UTC
391 - 400 of 1508 Solicitations
1 2 36 37 38 40 42 43 44 150 151