General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 12-1-2026
The general work requested is: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC. Located at: ST216260101 – 2026 HIP Group 2 (North-West) N. 74th St. - W. Beckett Av. to W. Congress St. N. 79th St. - W. Vienna Av. to W. Melvina St. N. 84th St. - W. Cheyenne St. to W. Helena St. N. 99th St. - W. Appleton Av. to Point north of W. Carmen Av. W. Caldwell Ct. - W. Medford Av. to a Point West of W. Medford Av. W. Fairmount Av. - N. Green Bay Av. to N. Teutonia Av. (retain speed humps) N. Granville Rd. - W. Bradley Rd. to N. 107th St. (paved pedestrian lane on one side) W. Helena St. - N. 84th St. to N. 86th St. W. Lancaster Av. - N. 37th St. to N. Hopkins St. W. Leon Tr. - N. 76th St. to W. Silver Spring Dr. W. Medford Av. - W. Villard Av. to W. Sheridan Av. W. Park Pl. - N. 107th St. to N. 110th St. W. Stark St. - N. Sherman Bl. to N. 47th St.
05/11/2026 03:30 PM UTC
OFFICIAL NOTICE 52-1-2026
CONCRETE SURFACE REPAIRS AND PAINTING OF THE LOWER LEVEL OF MACARTHUR SQUARE PARKING STRUCTURE.
05/12/2026 03:30 PM UTC
OFFICIAL NOTICE 13-1-2026
The general work requested is: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC. Located at: ST216260102 – 2026 HIP Group 3 (East) N. 6th St. - N. Dr. Martin L. King Jr. Dr. to point north of W. Melvina St. N. 33rd St. - W. Center St. to W. Locust St. N. 33rd St. - W. North Av. to W. Meinecke Av. (retain speed humps) N. 42nd St. - W. Congress St. to W. Courtland Av. E. Albion St. - N. Farwell Av. to N. Warren Av. E. Concordia Av. - N. Humboldt Bl. to N. Pierce St. N. Hackett Av. - E. Kenwood Bl. to E. Hartford Av. N. Jefferson St. - E. Knapp St. to E. Ogden Av. (retain speed hump) W. Kilbourn Av. - N. 35th St. to point west of N. 38th St. E. Knapp St. - N. Jefferson St. to N. Broadway (retain speed hump) W. Mc. Kinley Av. - N. 21st St. to N. 26th St. (retain speed humps) W. Nash St. - W. Scranton Pl. to N. 51st Bl. E. Park Pl. - N. Lake Dr. to N. Downer Av. W. Richardson Pl. - N. 27th St. to N. 29th St. (retain speed humps) N. Summit Av. - E. Kane Pl. to E. North Av. W./N. Toronto St. - N. 35th St. to W. Hope Av. W. Wright St. - N. Teutonia Av. to N. 19th St.
05/13/2026 03:30 PM UTC
OFFICIAL NOTICE 40-1-2026
Granville Station Public Water Main Extension/Private Water Loop Extension - West Menard Road/North 80TH Street/8110 & 8120 West Brown Deer Road/Former Northridge Mall Property, Milwaukee, WI.
05/15/2026 03:30 PM UTC
OFFICIAL NOTICE 59-1-2026
Remote Bridge Upgrades at Multiple Structures over Milwaukee River
05/19/2026 03:30 PM UTC
OFFICIAL NOTICE 54-1-2026
PROJECT NO.1: SANITARY SEWER LATERAL AND LEAD SERVICE LINE REPLACEMENT & SUMP PUMP INSTALLATION IN: Area Bounded by North 54th Street to North 58th Street and West Vienna Avenue to West Capitol Drive
05/20/2026 03:30 PM UTC
OFFICIAL NOTICE 54-2-2026
PROJECT NO.2: SANITARY SEWER MANHOLE INSPECTION: Located at: Various Locations within the City of Milwaukee
05/20/2026 03:30 PM UTC
OFFICIAL NOTICE 31-1-2026
The general work requested is: THE INSTALLATION OF NON-INTRUSIVE DETECTION CAMERAS AT EXISTING SIGNALIZED INTERSECTIONS. Non-Intrusive Detection Grant 4 – ST320233401 Located at: 15 INTERSECTIONS, NORTH SIDE IN THE CITY OF MILWAUKEE (Wisconsin Department of Transportation ID No. 2984-29-94)
05/27/2026 03:30 PM UTC
OFFICIAL NOTICE 56-1-2026
46TH AND STATE STREET – RETAINING WALL REPLACEMENT
05/28/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
06/02/2026 03:30 PM UTC
10 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 84-1-2022
ELECTRICAL WORK TO REPLACE MCC-2 NORTH FILTER FLOOR, MCC-3 SOUTH FILTER FLOOR, AND ASSOCIATED LOAD CENTERS AT THE MILWAUKEE WATER WORKS (MWW) LINWOOD WATER TREATMENT PLANT
07/12/2022 03:30 PM UTC
OFFICIAL NOTICE 83-1-2022
MILWAUKEE WATER WORKS (MWW) PRINTING AND MAILING SERVICES
07/11/2022 03:30 PM UTC
OFFICIAL NOTICE 19-1-2022
COMBINED SEWER MAIN RELAY & COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING in: N. 1st St. – E. / W. Meinecke Ave. to E. / W. Wright St. N. 29th St. – 240’+/- S. of W. Kilbourn Ave. to W. Richardson Pl. N. 37th St. – W. Clarke St. to W. Center St. E. Clarke St. – N. 1st St. to N. Palmer St. W. Clarke St. – N. 37th St. to N. 38th St. W. Hadley St. – N. 25th St. to N. 27th St. W. Locust St. – N. 17th St. to 15’+/- E. of N. 20th St.
06/29/2022 03:30 PM UTC
OFFICIAL NOTICE 19-2-2022
SANITARY, STORM, AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & MANHOLE REPAIR AND LINING in: Located at: N. 24th Pl. – W. Nash St. to 155’+/- N. of W. Vienna Ave. N. 25th St. – 125’ +/- N. of W. Capitol Dr. to W. Hope. Ave. S. 90th St. – W. Adler St. to 340’+/-W. Adler St. W. Blue Mound Rd. – N. 63rd St. to N. 67th St. W. Vienna Ave. – N. 24th Pl. to 245’+/- E. of N. 24th Pl. W. Wisconsin Ave. – N. 55th St. to N. Hawley Rd.
06/29/2022 03:30 PM UTC
OFFICIAL NOTICE 89-1-2022
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATION: CITY-OWNED LOT AREA 6, BOUNDED BY NORTH AVE., W I-43, CAPITOL DR., AND EAST CITY LIMIT
06/27/2022 03:30 PM UTC
OFFICIAL NOTICE 58-1-2022
Rehabilitation of South 35th Street Viaduct over Pierce Street
06/23/2022 03:30 PM UTC
OFFICIAL NOTICE 64-1-2022
CONSTRUCTION OF 5” CONCRETE WALK, CONCRETE WALK WITH INTEGRAL CURB, 7” CONCRETE DRIVEWAY, HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, CONCRETE CURB AND GUTTER, 7” HIGH EARLY STRENGHT CONCRETE DRIVEWAY, 8” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIOUS CONCRETE REMOVALS, GRAVEL FILING, DETECTABLE WARNING FIELDS, MANHOLE/INLET ADJUSTMENTS, AND SODDING & TOPSOIL , OTHER REMOVALS, ETC.; Located at: ST230220165 – Area Wide Walk Replacement for Area Bounded By (ABB) ST216220106 - ADA Ramps for Area Wide Walk for Area Bounded By (ABB): ABB: N. Downer Ave., E Belleview Pl., N. Lake Dr. and E. Park Pl. ABB: W. Historic Mitchell St., S. 7th St., W. Windlake Ave. and S. 11th St.
06/21/2022 03:30 PM UTC
OFFICIAL NOTICE 82-1-2022
Installation of pavement markings, colored pavement markings, and flexible delineators to address pedestrian, bicyclist, and motor vehicle traffic safety concerns.
06/17/2022 03:30 PM UTC
OFFICIAL NOTICE 81-1-2022
WITKOWIAK PARK SURFACING – SYNTHETIC TURF & POROUS PAVEMENT Located at: 1656 South 4th Street, Milwaukee, WI 53204 PROJECT NO. 81-1-2022: Synthetic Turf Athletic Field & Playground Surfacing
06/16/2022 03:30 PM UTC
OFFICIAL NOTICE 81-2-2022
WITKOWIAK PARK SURFACING – SYNTHETIC TURF & POROUS PAVEMENT Located at: 1656 South 4th Street, Milwaukee, WI 53204 PROJECT NO. 81-2-2022: Flexible Porous Pavement Pathways & Courts
06/16/2022 03:30 PM UTC
421 - 430 of 1568 Solicitations
1 2 39 40 41 43 45 46 47 156 157