General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 91-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
08/08/2025 03:30 PM UTC
OFFICIAL NOTICE 78-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; Street Lighting Upgrades for: ST3202318100 – Street Lighting Improvement for Carbon Reduction Program @ Various Locations
08/15/2025 03:30 PM UTC
OFFICIAL NOTICE 90-1-2025
CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, PAVERS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS, GRAVEL FILLING, CRUSHED GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER ALTERATIONS, STREET LIGHTING, UNDERGROUND CONDUIT, LANDSCAPING, TOPSOILING, ETC.
08/19/2025 03:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 4-1-2022
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, CONSTRUCTION STAKING OF RAMPS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, 7” CONCRETE PAVEMENT VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIOUS CONCRETE REMOVALS, SEWER WORK, APPURTENANCE UNDERGROUND WORK, ETC.; Located at: ST216210111 – ADA RAMPS FOR 2022 HIGH IMPACT PAVING @ VARIOUS LOCATIONS (NORTH SIDE PROJECTS) The scope of this contract is to remove and replace all of the pedestrian ramps within the limits of each of the City of Milwaukee “High Impact” asphalt paving projects. The “High Impact” asphalt paving projects are as follows: O.N. # 6-1-2022 North 56th Street - West Hampton Avenue to West Villard Avenue North 66th Street - West Port Avenue to West Bradley Road North 70th Street - West Congress Street to West Hampton Avenue North 80th Street - West Center Street to West Burleigh Street North 82nd Street - West Center Street to West Burleigh Street North 95th Street - West Silver Spring Drive to West Carmen Avenue North 104th Street - West Grantosa Drive to West Congress Street West Appleton Lane - West Florist Avenue to North 115th Street West Port Avenue - North 60th Street to North 66th Street O.N. # 7-1-2022 North 7th Street - North Doctor Martin Luther King Junior Drive to West Capitol Drive North 13th Street - A point south of West Vine Street to West Brown Street North 32nd Street - West Atkinson Avenue to West Cameron Avenue North 47th Street - West Vliet Street to West Lloyd Street North 51st Street - West Lisbon Avenue to West Center Street North Hopkins Street - West Villard Avenue to North Sherman Boulevard West Locust Street - West Appleton Avenue to West Lisbon Avenue West Melvina Street - North 46th Street to West Leon Trail
02/23/2022 04:30 PM UTC
OFFICIAL NOTICE 31-1-2022
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATION: CITY-OWNED LOT AREA 2: AREA BOUNDED BY NORTH AVENUE, WEST CITY LIMIT, CAPITOL DRIVE, AND NORTH 27TH STREET.
02/18/2022 04:30 PM UTC
OFFICIAL NOTICE 32-1-2022
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATION: CITY-OWNED LOT AREA 4 - AREA BOUNDED BY NORTH AVENUE, NORTH 20TH ST, CAPITOL DRIVE, AND NORTH 13TH ST.
02/18/2022 04:30 PM UTC
OFFICIAL NOTICE 33-1-2022
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATION: CITY-OWNED LOT AREA 5 - AREA BOUNDED BY NORTH AVENUE, NORTH 13TH ST, CAPITOL DRIVE, AND INTERSTATE 43
02/18/2022 04:30 PM UTC
OFFICIAL NOTICE 34-1-2022
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATION: CITY-OWNED LOT AREA 10 - AREA BOUNDED BY INTERSTATE 94 AND SOUTH CITY LIMIT
02/18/2022 04:30 PM UTC
Official Notice 30-1-2022
100 Lead Service Line Replacements
02/16/2022 04:30 PM UTC
OFFICIAL NOTICE 28-1-2022
WORK ON THIS PROJECT SHALL INCLUDE, BUT NOT LIMITED TO: INSTALLATION OF VARIOUS STREET LIGTHING APPURTENANCE WORK, INSTALLATION OF TEMPORARY STREET LIGHTING WOODEN POLES INSTALLATION OF TEMPORARY LIGHTING UNITS BOTH SINGLE AND DOUBLE, INSTALLATION OF CONDUIT AND CABLE, INSTALLATION OF 9” HIGH EARLY STRENGTH CONCRETE, ELECTRICAL APPURTENANCE REMOVALS, CONCRETE BASE REMOVALS, ETC.; Located at: RE5239118511 – West Good Hope Road – North Range Lind Road to 490’+/- east of North Teutonia Avenue (Rail Road Tracks) (Temporary Street Lighting)
02/14/2022 04:30 PM UTC
OFFICIAL NOTICE 27-1-2022
NEW SANITARY SEWER & SANITARY SEWER RELAY
02/10/2022 04:30 PM UTC
OFFICIAL NOTICE 11-1-2022
2022 Sanitary Bypass Pump & Sanitary Lift Station Inspection and Bypass Pump Wet Testing
02/01/2022 04:30 PM UTC
OFFICIAL NOTICE 10-1-2022
PROJECT NO. 1: SANITARY & COMBINED SEWER LINING & MANHOLE REPAIR AND LINING Alley 125 Feet E. of N. 6th St. - W. McKinley Av. to 110 Feet N. of W. McKinley Av. W. Madison St. – S. 3rd St. to S. 4th St. W. Medford Av. – W. Custer Av. to W. Sheridan Av. W. Wells St. – N. 11th St. to N. 14th St.
01/28/2022 04:30 PM UTC
411 - 420 of 1491 Solicitations
1 2 38 39 40 42 44 45 46 149 150