General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 27-1-2025
PROJECT 1: SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & SANITARY SEWER MAIN REPAIR S. 6th St. - W. Ohio Ave. to 480’ S. of W. Ohio Ave. S. Austin St. – E. Van Norman Ave. to E. Armour Ave. N. Bartlett Ave. – E. Kane Pl. to 200’+/- NE. of E. Kane Pl. E. Howard Ave. – S. Kansas Ave. to 210’+/- E. of S. Kansas Ave. E. Howard Ave. – S. Nevada St. to S. Brust Ave. S. Kansas Ave. – E. Howard Ave. to E. Norwich Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 27-2-2025
PROJECT NO. 2: COMBINED SEWER MAIN RELAY Located at: N. 15th St. – W. Concordia Ave. to W. Keefe Ave. N. 16th St. – W. Ring St. to W. Keefe Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 87-1-2017
KEENAN HEALTH CENTER ELEVATOR MODERNIZATION 3200 NORTH 36TH STREET MILWAUKEE WI
07/14/2017 03:30 PM UTC
OFFICIAL NOTICE 86-1-2017
Epoxy polymer overlay to the North and South 6th Street cable stay sidewalks and West Vliet Street over CPRW
07/13/2017 03:30 PM UTC
OFFICIAL NOTICE 88-1-2017
ASPHALT PARKING LOT REPAIR AT SAFETY ACADEMY 6680 N TEUTONIA AVE MILWAUKEE WI
07/10/2017 03:30 PM UTC
OFFICIAL NOTICE 89-1-2017
FLOATING ISLANDS AT HARTUNG QUARRY PARK
07/06/2017 03:30 PM UTC
OFFICIAL NOTICE 70-1-2017
WATER MAIN RELAYS at the following locations: N. 80Th St. (WT41017069), W. Congress St. to W. Ruby Ave. (11 working days); W. Potomac Ave. (WT410170610), W. Ruby Ave. to W. Courtland Ave. (42 working days); S. Herman St. (WT410170652), E. Doty Pl. to S Whitnall Ave. (12 working days); E. Waterford Ave. (WT410170654), S. Lenox St. to S. Herman St. (15 working days); N. 84Th St (WT410170675), W. Courtland Ave to W. Hampton Ave (30 working days); W. Ruby Ave. (WT410170677), N. 82nd. to N. 83Rd St (12 working days); (Note: Contractor to furnish and install approximately 4,767 lin. ft. of 16”, 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
07/05/2017 03:30 PM UTC
OFFICIAL NOTICE 75-1-2017
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, INSTALLATION OF PERMEABLE PAVERS, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST212060105 – Alley BB- W. Chambers St., W. Locust St., N. 76th St., & N.77th St. (Permeable Alley Pavement) ST212010143 – Alley BB- W. Auer Av., W. Concordia Ave., N. 87th St., & N. 88th St. (Permeable Alley Pavement) ST212080102 – Alley BB- W. Keefe Ave., W. Medford Ave., W. Roosevelt Dr., N. 45th St. & W. Scranton Pl. (Permeable Alley Pavement) ST212160113 – Alley BB- Auer Av., W. Burleigh St., N. 54th St., & N. 55th St. (Nth/Sth Leg) (Permeable Alley Pavement) ST212160102 – Alley between W. Capitol Dr., W. Melvina St., N. 64th St. & N. 65th St. (Concrete Alley Pavement)
07/05/2017 03:30 PM UTC
OFFICIAL NOTICE 84-1-2017
THE INSTALLATION OF CUC MANHOLES, ENCASED NONMETALLIC CONDUIT, CONSTRUCTION OF TEMPORARY 3” CONCRETE, 5” CONCRETE WALK, CONCRETE REMOVALS, ETC.; Located at: TD04884042 - W. Juneau Ave. - N. Old World Third St. to N. 4th St.; N. 4th St – W. Highland Ave. to W. Juneau Ave.; N. 5th St. - W. Juneau Ave. to Parking Structure
07/03/2017 03:30 PM UTC
OFFICIAL NOTICE 40-1-2017
PERFORM COMPLETE TEAR-OFF OF METER SHOP ROOF AT 3929 W. CAMERON AVENUE. PROVIDE BUILT-UP ROOF, FASCIA AND MISCELLANEOUS ITEMS
06/29/2017 03:30 PM UTC
OFFICIAL NOTICE 69-1-2017
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, INSTALLATION OF PERMEABLE PAVERS, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST212160116 – Alley BB- W. Burnham St., Rogers St., S. 12th St., & S. 13th St. (Concrete Alley Pavement) ST212140104 – Alley BB- W. Greenfield Ave., S. Layton Blvd., W. Scott St., & S. 28th St. (Permeable Alley Pavement) ST212160110 – Alley BB- W. Main St., S. 61st St., S. 62nd St., & Lands North (Permeable Alley Pavement) ST212060106 – Alley between W. Cleveland Ave., W. Montana St., S. 49th St., & S. 50th St. (Permeable Alley Pavement)
06/27/2017 03:30 PM UTC
OFFICIAL NOTICE 85-1-2017
LEAD SERVICE LINE REPLACEMENT, at 20 locations, by qualified City of Milwaukee licensed and bonded contractors (40 working days). Locations will be at various sites throughout the City of Milwaukee.
06/22/2017 03:30 PM UTC
901 - 910 of 1476 Solicitations
1 2 87 88 89 91 93 94 95 147 148