General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 12-1-2026
The general work requested is: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC. Located at: ST216260101 – 2026 HIP Group 2 (North-West) N. 74th St. - W. Beckett Av. to W. Congress St. N. 79th St. - W. Vienna Av. to W. Melvina St. N. 84th St. - W. Cheyenne St. to W. Helena St. N. 99th St. - W. Appleton Av. to Point north of W. Carmen Av. W. Caldwell Ct. - W. Medford Av. to a Point West of W. Medford Av. W. Fairmount Av. - N. Green Bay Av. to N. Teutonia Av. (retain speed humps) N. Granville Rd. - W. Bradley Rd. to N. 107th St. (paved pedestrian lane on one side) W. Helena St. - N. 84th St. to N. 86th St. W. Lancaster Av. - N. 37th St. to N. Hopkins St. W. Leon Tr. - N. 76th St. to W. Silver Spring Dr. W. Medford Av. - W. Villard Av. to W. Sheridan Av. W. Park Pl. - N. 107th St. to N. 110th St. W. Stark St. - N. Sherman Bl. to N. 47th St.
05/11/2026 03:30 PM UTC
OFFICIAL NOTICE 52-1-2026
CONCRETE SURFACE REPAIRS AND PAINTING OF THE LOWER LEVEL OF MACARTHUR SQUARE PARKING STRUCTURE.
05/12/2026 03:30 PM UTC
OFFICIAL NOTICE 13-1-2026
The general work requested is: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC. Located at: ST216260102 – 2026 HIP Group 3 (East) N. 6th St. - N. Dr. Martin L. King Jr. Dr. to point north of W. Melvina St. N. 33rd St. - W. Center St. to W. Locust St. N. 33rd St. - W. North Av. to W. Meinecke Av. (retain speed humps) N. 42nd St. - W. Congress St. to W. Courtland Av. E. Albion St. - N. Farwell Av. to N. Warren Av. E. Concordia Av. - N. Humboldt Bl. to N. Pierce St. N. Hackett Av. - E. Kenwood Bl. to E. Hartford Av. N. Jefferson St. - E. Knapp St. to E. Ogden Av. (retain speed hump) W. Kilbourn Av. - N. 35th St. to point west of N. 38th St. E. Knapp St. - N. Jefferson St. to N. Broadway (retain speed hump) W. Mc. Kinley Av. - N. 21st St. to N. 26th St. (retain speed humps) W. Nash St. - W. Scranton Pl. to N. 51st Bl. E. Park Pl. - N. Lake Dr. to N. Downer Av. W. Richardson Pl. - N. 27th St. to N. 29th St. (retain speed humps) N. Summit Av. - E. Kane Pl. to E. North Av. W./N. Toronto St. - N. 35th St. to W. Hope Av. W. Wright St. - N. Teutonia Av. to N. 19th St.
05/13/2026 03:30 PM UTC
OFFICIAL NOTICE 40-1-2026
Granville Station Public Water Main Extension/Private Water Loop Extension - West Menard Road/North 80TH Street/8110 & 8120 West Brown Deer Road/Former Northridge Mall Property, Milwaukee, WI.
05/15/2026 03:30 PM UTC
OFFICIAL NOTICE 59-1-2026
Remote Bridge Upgrades at Multiple Structures over Milwaukee River
05/19/2026 03:30 PM UTC
OFFICIAL NOTICE 54-1-2026
PROJECT NO.1: SANITARY SEWER LATERAL AND LEAD SERVICE LINE REPLACEMENT & SUMP PUMP INSTALLATION IN: Area Bounded by North 54th Street to North 58th Street and West Vienna Avenue to West Capitol Drive
05/20/2026 03:30 PM UTC
OFFICIAL NOTICE 54-2-2026
PROJECT NO.2: SANITARY SEWER MANHOLE INSPECTION: Located at: Various Locations within the City of Milwaukee
05/20/2026 03:30 PM UTC
OFFICIAL NOTICE 31-1-2026
The general work requested is: THE INSTALLATION OF NON-INTRUSIVE DETECTION CAMERAS AT EXISTING SIGNALIZED INTERSECTIONS. Non-Intrusive Detection Grant 4 – ST320233401 Located at: 15 INTERSECTIONS, NORTH SIDE IN THE CITY OF MILWAUKEE (Wisconsin Department of Transportation ID No. 2984-29-94)
05/27/2026 03:30 PM UTC
OFFICIAL NOTICE 56-1-2026
46TH AND STATE STREET – RETAINING WALL REPLACEMENT
05/28/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
06/02/2026 03:30 PM UTC
10 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 68-1-2018
ERADICATE AND INSTALL PAVEMENT MARKINGS.
04/25/2018 03:30 PM UTC
OFFICIAL NOTICE 4-1-2018
STORM SEWER MAIN RELAY, STORM AND COMBINED SEWER MAIN LINING, & MANHOLE REPAIR AND LINING in: Located at: W. Ridge Ct. – N. Sherman Blvd. to A Point 140’ W. of N. Sherman Blvd. N. Sherman Blvd. – W. Wright St. to W. Hadley St. N. Sherman Blvd (E/S) – Alley N. of W. Roosevelt Dr. to 115’ N. of W. Ridge Ct. N. Sherman Blvd. (W/S) – W. Roosevelt Dr. to 550’ N. of W. Ridge Ct.
04/24/2018 03:30 PM UTC
OFFICIAL NOTICE 004-2-2018
COMBINED SEWER MAIN RELAY: Located at: N. 5th St. – N. Dr Martin Luther King Jr Dr. to W. Keefe Ave. N. 5th St. – W. Chambers St. to W. Ring St. N. 6th St. – W. Chambers St. to W. Burleigh St. W. Burleigh St. – N. Dr Martin Luther King Jr Dr. to N. 7th St.
04/24/2018 03:30 PM UTC
OFFICIAL NOTICE 004-3-2018
SANITARY MANHOLE REHABILITATION AT VARIOUS LOCATIONS
04/24/2018 03:30 PM UTC
OFFICIAL NOTICE 42-1-2018
INSTALLATION OF LIGHT EMITTING DIODE (LED) TRAFFIC SIGNAL MODULES 12-INCH.
04/23/2018 03:30 PM UTC
OFFICIAL NOTICE 48-1-2018
WATER MAIN RELAYS AND LEAD SERVICE LINE REPLACEMENTS at the following locations: N. Marshall St. (WT410150669), E. Pleasant St. to E. Brady St. (49 working days); W. Orchard St. (WT410150673), S. 13th St. to S. 15th St. (58 working days); S. 15th St. (WT410150674), W. Greenfield Ave. to W. Lapham Blvd. (59 working days); W. Lapham Blvd. (WT410110630), S. 12th St. to S. 15th Pl. (16 working days); N. 23rd St. (WT410160683), W. Fairmount Ave. to W. Lincoln Creek Pkwy. (66 working days); N. 22nd St. (WT410160684), W. Stark St. to W. Fairmount Ave. (16 working days). (Note: Contractor to furnish and install approximately 4,910 lin. ft. of 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/20/2018 03:30 PM UTC
OFFICIAL NOTICE 70-1-2018
LEAD SERVICE LINE REPLACEMENT, at 50 locations, by qualified City of Milwaukee licensed and bonded contractors. Qualified bidders shall have the necessary equipment and experience to replace lead service lines using trenchless methods. All locations will be emergency service line replacements due to a leak or failure. Each location will require either the full replacement of the water service line from the municipal water main up to the interior water meter setting, or, at locations where a portion of the service line was previously replaced with copper, the replacement of the remaining lead portion of the service line. When the existing water meter setting is not code compliant, work will also include a new meter setting. Work may include, but is not limited to, the procurement of all necessary permits, a site visit prior to work beginning, scheduling the installation with the property owner, traffic control, erosion control, saw-cutting, excavation, installation of a new copper service line utilizing trenchless technology (MWW approval is required for open cut installation), tapping of the water main, abandonment of the lead service line, installation of an updated water meter setting up to and including the outlet valve, reconnection to the interior building piping, code-compliant restoration of the electrical ground wire, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Locations will be at various sites throughout the City of Milwaukee. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
04/18/2018 03:30 PM UTC
OFFICIAL NOTICE 47-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 8” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.
04/17/2018 03:30 PM UTC
OFFICIAL NOTICE 49-1-2018
COUNTING, PROCESSING AND DEPOSITING PARKING METER COIN COLLECTIONS FOR THE CITY'S APRROXIMATELY 7,000+ PAID PARKING METER SPACES
04/10/2018 03:30 PM UTC
OFFICIAL NOTICE 063-1-2018
GREEN STREET BIOSWALES IN: W. Mill Rd. – 26’ ± East of N. 46th St. to 300” ± East of N. 89th St. & W. Good Hope Rd. – 110” ± East of N. Granville Rd to 200” ± East of N. 97th St.
04/05/2018 03:30 PM UTC
901 - 910 of 1568 Solicitations
1 2 87 88 89 91 93 94 95 156 157