We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 27-1-2025
PROJECT 1: SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & SANITARY SEWER MAIN REPAIR S. 6th St. - W. Ohio Ave. to 480’ S. of W. Ohio Ave. S. Austin St. – E. Van Norman Ave. to E. Armour Ave. N. Bartlett Ave. – E. Kane Pl. to 200’+/- NE. of E. Kane Pl. E. Howard Ave. – S. Kansas Ave. to 210’+/- E. of S. Kansas Ave. E. Howard Ave. – S. Nevada St. to S. Brust Ave. S. Kansas Ave. – E. Howard Ave. to E. Norwich Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 27-2-2025
PROJECT NO. 2: COMBINED SEWER MAIN RELAY Located at: N. 15th St. – W. Concordia Ave. to W. Keefe Ave. N. 16th St. – W. Ring St. to W. Keefe Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 59-1-2017
SANITARY SEWER MAIN RELAY, & COMBINED SEWER MAIN LINING, & MANHOLE REPAIR AND LINING in: W. Ohio Ave. – S. 35th St. to S. 39th St. S. Pennsylvania Ave. – E. Euclid Ave. to E. Fernwood Ave. W. Pierce St. – S. 37th St. to S. 39th St.
10/24/2017 03:30 PM UTC
OFFICIAL NOTICE 111-1-2017
ERADICATION OF PAVEMENT MARKINGS, INSTALLATION OF LONGITUDINAL PAVEMENT MARKINGS, INSTALLATION OF OTHER PAVEMENT MARKINGS INCLUDING ARROWS, SYMBOLS, WORDS, STOP LINES, CROSSWALKS, AND GREEN THERMOPLASTIC MARKINGS, AND INSTALLATION OF BICYCLE LANE DELINEATORS; Located at: (ST220170210) W. Locust St. – E. Humboldt Blvd. to N. Oakland Ave. W. North Ave. – N. Bremen St. to N. Cambridge Ave
10/13/2017 03:30 PM UTC
OFFICIAL NOTICE 100-1-2017
CONSTRUCTION OF 8” & 9” CONCRETE PAVEMENT, 8” HIGH EARLY STRENGTH CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, REPAIR PAVEMENT JOINTS AND CRACKS, PAVEMENT GRINDING, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST211150161 - S. California St. - E. Euclid Ave. to E. Oklahoma. Ave. ST211170194 - E. North Ave. @ N. Palmer St., & @ N. Buffum St. ST211170197 - S. Howell Ave. @ E. Montana St., & @ E. Dewey Pl.
10/12/2017 03:30 PM UTC
OFFICIAL NOTICE 83-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST214170106 - W. Michigan St. @ N. 34th St. ST211170183 - N. 84th St. - W. Brentwood Ave. to W. Green Tree Rd. ST211170173 - S. Clement Ave. @ E. Dakota St.
10/10/2017 03:30 PM UTC
OFFICIAL NOTICE 99-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 9” CONCRETE PAVEMENT, 8” CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST211150150 - W. Garfield Ave. - N. Dr. MLK Jr. Dr. to N. 4th St. ST211150101 - W. Blue Mound Ct. - 400'e/o N. Story Pkwy. to 50' e/o N. Story Pkwy. TD08284500 - N. Astor St. - E. Kilbourn Ave. to E. State St. (TID-82).
09/29/2017 03:30 PM UTC
OFFICIAL NOTICE 102-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 8” CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST211150163 - W. St. Paul Ave. - N. 92nd St. to N. 95th St.
09/29/2017 03:30 PM UTC
OFFICAL NOTICE 106-1-2017
Provide Snow and Ice Removal Services to the Milwaukee Water Works
09/28/2017 03:30 PM UTC
OFFICIAL NOTICE 58-1-2017
COMBINED SEWER MAIN RELAY, SANITARY AND COMBINED SEWER MAIN LINING, & MANHOLE REPAIR AND LINING in: N. 34th St. – W. Garfield Ave. to W. North Ave. N. 48th St. – W. Meinecke Ave. to W. Wright Ave. W. Ely Pl./N. 54th St. – W. Fond Du Lac Ave. to W. Congress St.
09/26/2017 03:30 PM UTC
OFFICIAL NOTICE 58-2-2017
STORM SEWER MAIN RELAY, STORM SEWER MAIN REPAIR AND LINING, & MANHOLE REPAIR AND LINING in: N. 28th St. – Alley 230' +/- North of W. Hope Ave. to 120' +/- South of W. Roosevelt Dr. N. 29th St. – Alley 230' +/- North of W. Hope Ave. to 120' +/- South of W. Roosevelt Dr. Alley North of W. Hope Ave. – Alley East of N. 28th St. to N. 30th St. (Vacated)
09/26/2017 03:30 PM UTC
OFFICIAL NOTICE 110-1-2017
MFD REPAIR SHOP STORAGE FACILITY 100 WEST VIRGINIA STREET MILWAUKEE WI 53204
09/21/2017 03:30 PM UTC