We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 45-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKINGS, SEWER WORK, WATER WORK, ETC.; TD08584031 – West Pierce Street - South 6th Street to South 9th Street West Virginia Street - South 6th Street to South 9th Street TD09484011 – South 5th Place - South Chase Avenue to West Burnham Street South 6th Street - West Hayes Avenue to South Chase Avenue West Maple Street - South 2nd Street to South 4th Street
05/06/2025 03:30 PM UTC
OFFICIAL NOTICE 35-1-2025
LS-38: LINCOLN ELECTRICAL UPGRADES PROJECT ELECTRICAL WORK TO REPLACE MEDIUM VOLTAGE SWITCHGEAR LINE-UP, AUTOMATION CONTROLS CABINET, AND RESTROOM RELOCATION AT THE MILWAUKEE WATER WORKS (MWW) LINCOLN STATION
05/13/2025 03:30 PM UTC
OFFICIAL NOTICE 56-1-2025
Election Operations Center & Southwest Shop – Boiler Replacement(s)
05/14/2025 03:30 PM UTC
OFFICIAL NOTICE 32-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8 REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located At: TD11584013 – In East Michigan Street – North Cass Street to North Lincoln Memorial Drive
05/15/2025 03:30 PM UTC
OFFICIAL NOTICE 13-1-2025
South 20th Street Culvert Rehabilitation
05/21/2025 03:30 PM UTC
OFFICIAL NOTICE 4-1-2025
Street Lighting LED upgrades CRP Area C: ST320240910 – South City Limits to East/West Oklahoma Avenue, Lake Michigan to West City of Milwaukee Limits Street Lighting Upgrades (Wisconsin Department of Transportation ID No. 2984-55-74)
05/22/2025 03:30 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 55-1-2017
SANITARY AND COMBINED SEWER MAIN RELAY, & STORM SEWER MAIN LINING, & MANHOLE REPAIR AND LINING in: S. Austin St. – E. Morgan Ave. to E. Warnimont Ave. S. Kinnickinnic Ave. – E. Ohio Ave. to 110' S. of E. Ohio Ave. E. Layton Ave. – S. Howell Ave. to S. Burrell St. S. Taylor Ave. – S. Whitnall Ave. to E. Bolivar Ave. S. Whitnall Ave. – S. Quincy Ave. to S. Pine Ave.
07/25/2017 03:30 PM UTC
OFFICIAL NOTICE 3-1-2017
CONSTRUCTION OF 8” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” & 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKINGS, CONCRETE REMOVALS, TRACK ZONE REMOVALS, AND SEWER WORK, ETC.; Located at: (ST211120171) E. Nash St. - N. Fratney St. to N. Holton St. (Elimination of RR X-ings)
07/21/2017 03:30 PM UTC
OFFICIAL NOTICE 82-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PAVEMENT MARKING, ETC.; Located at: (ST211151165) – N. 53rd St. – W. Roosevelt Dr. to W. Keefe Ave. (1 Speed Hump) (ST211170175) – S. 8th St. – W. Madison St. to W. Scott St. (1 Speed Hump) (ST211170144) – S. 11th St. – W. Oklahoma Ave. to W. Montana St. (3 Speed Humps) (ST211170111) – N. 19th Pl. – W. Stark St. to W. Fairmont Ave. (1 Speed Hump) (ST211170108) - N. 19th St. – W. Hampton Ave. to W. Stark St.. (1 Speed Hump) (ST211170109) – N. 19th St. – W. Stark St. to W. Fairmount Ave. (I Speed Hump) (ST211170107) – S. 19th St. – W. Burnham St. to W. Mitchell St. (1 Speed Hump) (ST211170112) – N. 28th St. – W. Chambers St. to W. Burleigh St. (1 Speed Hump) (ST211170136) – N. 28th St. – W. Locust St. to W. Chambers St. (1 Speed Hump) (ST211170143) – S. 30th St. – W. Hayes Ave. to W. Lincoln Ave. (1 Speed Hump) (ST211170189) – S. 30th St. – W. Lapham Blvd. to W. Orchard St. (1 Speed Hump) (ST211170188) – S. 31st St. – W. Grant St. to W. Becher St. (1 Speed Hump) (ST211170157) – N. 34th St. – W. Park Hill Ave. to W. St. Paul Ave. (2 Speed Humps) (ST211150195) – N. 36th St. – W. Thurston Ave. to W. Florist Ave. (3 Speed Humps) (ST211170131) – S. 36th St. – W. National Ave. to W. Pierce St. (1 Speed Hump) (ST211170113) – N. 38th St. – W. Villard Ave. to W. Rohr Ave. (1 Speed Hump) (ST211160145) – N. 39th St. – W. Silver Spring Dr. to W. Florist Ave. (4 Speed Humps) (ST211170114) – N. 40th St. – W. Roosevelt Dr. to W. Capitol Dr. (1 Speed Hump) (ST211170115) – N. 42nd St. – W. Thurston Ave. to W. Florist Ave. (3 Speed Humps) (ST211170137) – N. 44th St. – W. Hadley St. to W. Locust St. (1 Speed Hump) (ST211170116) – N. 46th St. – W. Glendale Ave. to W. Hampton Ave. (2 Speed Humps) (ST211170119) – N. 54th Blvd. – W. Keefe Ave. to W. Melvina St. (3 Speed Humps) (ST211170118) - N. 54th St. – W. Roosevelt Dr. to W. Keefe Ave. (2 Speed Humps) (ST211170106) - N. 56th St. – W. Wright St. to W. Clarke St. (1 Speed Hump) (ST211170184) – N. 75th St. – W. Beckett Ave. to W. Marion St. (1 Speed Hump) (ST211130156) – N. Buffum St. – E. Clarke St. to E. Center St. (1 Speed Hump) (ST211160136) – W. Congress St. – N. 22nd St. to N. Teutonia Ave. (2 Speed Humps) (ST211170120) – N. Grant Blvd. – W. Clarke St. to W. Center St. (1 Speed Hump) (ST211170124) – W. McKinley Ave. – N. 18th St. to N. 19th St. (1 Speed Hump) (ST211160148) – W. Medford Av. – W. Congress St. to W. Baldwin St. (2 Speed Humps) (ST211170105) – W. Michigan St. – N. 32nd St. to N. 33rd St. (1 Speed Hump) (ST211170128) – W. Scott St. – S. 30th St. to S. 31st St. (1 Speed Hump) (ST211170127) – E. Smith St. – S. Howell Ave. to S. Burrell St. (2 Speed Humps)
07/20/2017 03:30 PM UTC
OFFICIAL NOTICE 87-1-2017
KEENAN HEALTH CENTER ELEVATOR MODERNIZATION 3200 NORTH 36TH STREET MILWAUKEE WI
07/14/2017 03:30 PM UTC
OFFICIAL NOTICE 86-1-2017
Epoxy polymer overlay to the North and South 6th Street cable stay sidewalks and West Vliet Street over CPRW
07/13/2017 03:30 PM UTC
OFFICIAL NOTICE 88-1-2017
ASPHALT PARKING LOT REPAIR AT SAFETY ACADEMY 6680 N TEUTONIA AVE MILWAUKEE WI
07/10/2017 03:30 PM UTC
OFFICIAL NOTICE 89-1-2017
FLOATING ISLANDS AT HARTUNG QUARRY PARK
07/06/2017 03:30 PM UTC
OFFICIAL NOTICE 70-1-2017
WATER MAIN RELAYS at the following locations: N. 80Th St. (WT41017069), W. Congress St. to W. Ruby Ave. (11 working days); W. Potomac Ave. (WT410170610), W. Ruby Ave. to W. Courtland Ave. (42 working days); S. Herman St. (WT410170652), E. Doty Pl. to S Whitnall Ave. (12 working days); E. Waterford Ave. (WT410170654), S. Lenox St. to S. Herman St. (15 working days); N. 84Th St (WT410170675), W. Courtland Ave to W. Hampton Ave (30 working days); W. Ruby Ave. (WT410170677), N. 82nd. to N. 83Rd St (12 working days); (Note: Contractor to furnish and install approximately 4,767 lin. ft. of 16”, 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
07/05/2017 03:30 PM UTC
OFFICIAL NOTICE 75-1-2017
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, INSTALLATION OF PERMEABLE PAVERS, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST212060105 – Alley BB- W. Chambers St., W. Locust St., N. 76th St., & N.77th St. (Permeable Alley Pavement) ST212010143 – Alley BB- W. Auer Av., W. Concordia Ave., N. 87th St., & N. 88th St. (Permeable Alley Pavement) ST212080102 – Alley BB- W. Keefe Ave., W. Medford Ave., W. Roosevelt Dr., N. 45th St. & W. Scranton Pl. (Permeable Alley Pavement) ST212160113 – Alley BB- Auer Av., W. Burleigh St., N. 54th St., & N. 55th St. (Nth/Sth Leg) (Permeable Alley Pavement) ST212160102 – Alley between W. Capitol Dr., W. Melvina St., N. 64th St. & N. 65th St. (Concrete Alley Pavement)
07/05/2017 03:30 PM UTC
OFFICIAL NOTICE 84-1-2017
THE INSTALLATION OF CUC MANHOLES, ENCASED NONMETALLIC CONDUIT, CONSTRUCTION OF TEMPORARY 3” CONCRETE, 5” CONCRETE WALK, CONCRETE REMOVALS, ETC.; Located at: TD04884042 - W. Juneau Ave. - N. Old World Third St. to N. 4th St.; N. 4th St – W. Highland Ave. to W. Juneau Ave.; N. 5th St. - W. Juneau Ave. to Parking Structure
07/03/2017 03:30 PM UTC