General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 27-1-2025
PROJECT 1: SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & SANITARY SEWER MAIN REPAIR S. 6th St. - W. Ohio Ave. to 480’ S. of W. Ohio Ave. S. Austin St. – E. Van Norman Ave. to E. Armour Ave. N. Bartlett Ave. – E. Kane Pl. to 200’+/- NE. of E. Kane Pl. E. Howard Ave. – S. Kansas Ave. to 210’+/- E. of S. Kansas Ave. E. Howard Ave. – S. Nevada St. to S. Brust Ave. S. Kansas Ave. – E. Howard Ave. to E. Norwich Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 27-2-2025
PROJECT NO. 2: COMBINED SEWER MAIN RELAY Located at: N. 15th St. – W. Concordia Ave. to W. Keefe Ave. N. 16th St. – W. Ring St. to W. Keefe Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 77-1-2017
For the hauling and recycling of residential asphalt shingles from the City of Milwaukee's Drop Off Centers.
05/30/2017 03:30 PM UTC
OFFICIAL NOTICE 26-1-2017
SEWER CLEANING AND EXAMINATION Located at: Various Locations **Attendance at a Pre-Bid meeting on Wednesday, May 17, 2017 at 10:30 AM in Room 820, 841 N. Broadway, Milwaukee, WI 53202 is mandatory to bid on this project.
05/26/2017 03:30 PM UTC
OFFICIAL NOTICE 51-1-2017
CHIP SEAL BITUMINOUS PAVEMENT USING AN ASPHALTIC MATERIAL WITH ¼” LIMESTONE AGGREGATE COVER CONSISTING OF A MIXTURE OF BITUMINOUS SEAL COATING WITH STONE COVER AGGREGATE SPREAD EVENLY ON THE SURFACE AS SPECIFIED AND DIRECTED AND FILL CRACKS AND FOG SEALING OF CHIP SEALED PAVEMENTS, ETC.; Located at: ST211170186 - Various Street Locations Within the City of Milwaukee
05/18/2017 03:30 PM UTC
OFFICIAL NOTICE 66-1-2017
WATER MAIN RELAYS at the following locations: N. 94th St. (WT410170626), W. Capitol Dr. to 300 Ft. N/O W. Capitol Dr. (10 working days); N. 97th St. (WT410170627), W. Sarasota Pl. to W. Fiebrantz Av. (9 working days); N. 85th St. (WT410170635), 320 Ft. S/O W. Fairmount Av. to W. Villard Av. (44 working days); W. Lancaster Av. (WT410170636), N. 85th St. to N. 87th St. (24 working days); W. Hampton Av. (S/S) (WT410170665), N. 110th St. to 540 Ft. W/O N. 110th St. (17 working days); N. Holton St. (WT410170695), E. Concordia Av. to E. Townsend St. (5 working days). (Note: Contractor to furnish and install approximately 4,093 lin. ft. of 12”, 8”, 6” and 4” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
05/12/2017 03:30 PM UTC
OFFICIAL NOTICE 62-1-2017
WATER MAIN RELAYS, in the following locations: S. 60th St. (WT410170006), W. Morgan Ave. to W. Coldspring Rd. (7 working days); S. 24th Ct. (WT410170601), W. Leroy Ave. to 210’ S/O W. Leroy Ave. (11 working days); S. 6th St. (WT410170615), W. Abbott Ave. to 120’ N/O W. Grange Ave. (65 working days); S. 39th St. (WT410170642), W. Birchwood Ave. to W. Iona Tr. (10 working days); W. Iona Tr. (WT410170643), W. Parnell Ave. to S. 39th St. (11 working days); S. Melinda St. (WT410170655), W. Birchwood Ave. to W. Parnell Ave. (10 working days); S. 5th St. (WT410170657), 600’ N/O W. Layton Ave. to W. Layton Ave. (18 working days); S. 53rd St. (WT410170662), W. Wilbur Ave. to W. Howard Ave. (36 working days); W. Armour Ave. (WT410170668), S. 13th St. to S. 14th St. (9 working days); S. 14th St. (WT410170669), W. Armour Ave. to 550’ S/O W. Cudahy Ave. (18 working days); S. 16th St. (WT410170670), W. Bolivar Ave. to W. Whitaker Ave. (9 working days); S. 25th St. (WT410170674), W. Henry Ave. to 210’ S/O W. Henry Ave. (10 working days); S. 82nd St. (WT410170676), W. Warnimont Ave. to W. Wilbur Ave. (26 working days) (Note: Contractor to furnish and install approx. 7099 lin. ft. of 16”, 12”, 8”, and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.).
05/10/2017 03:30 PM UTC
OFFICIAL NOTICE 71-1-2017
LEAD SERVICE LINE REPLACEMENT, at 50 locations, by qualified City of Milwaukee licensed and bonded contractors (100 working days). Locations will be at various sites throughout the City of Milwaukee.
05/10/2017 03:30 PM UTC
OFFICIAL NOTICE 49-1-2017
LEAD SERVICE LINE REPLACEMENT, at 50 locations, by qualified City of Milwaukee licensed and bonded contractors (100 working days). Locations will be at various sites throughout the City of Milwaukee.
05/02/2017 03:30 PM UTC
OFFICIAL NOTICE 28-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE BASE, SEALING PAVEMENT JOINT AND CRACKS, 8” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: TD4884042 - N. 5th St. - W. Juneau Ave. to W. McKinley Ave.
05/01/2017 03:30 PM UTC
OFFICIAL NOTICE 53-1-2017
CRACKFILL ASPHALT AND CONCRETE STREET PAVEMENTS WITH A HOT-APPLIED ASPHALT BASED PRODUCT USED TO SEAL AND FILL CRACKS AND JOINTS. ADDITIONAL WORK INVOLVING THE FILLING OF SMALL HOLES, JOINT FAILURES, EXPOSURE OF WIRE MESH AND OTHER MINOR SURFACE DEFECTS USING HOT-APPLIED ASPHALT BASED PRODUCT AND PEA GRAVEL WILL BE REQUIRED ON ALL PAVEMENTS. ETC. Located at: ST211160118 - Various street locations within the City of Milwaukee
04/28/2017 03:30 PM UTC
OFFICIAL NOTICE 48-1-2017
2017 BYPASS PUMP REHABILITATION PROJECT
04/26/2017 03:30 PM UTC
921 - 930 of 1476 Solicitations
1 2 89 90 91 93 95 96 97 147 148