General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 56-1-2018
FLOATING ISLANDS IN: Hartung Park Wet Detention Pond – East of Menomonee River Parkway and south of West Keefe Avenue
05/30/2018 03:30 PM UTC
OFFICIAL NOTICE 77-1-2018
POLICE DISTRICT STATIONS ADA REMODELING 2ND DISTRICT, 245 W LINCOLN AVENUE 4TH DISTRICT, 6929 W SILVER SPRING DRIVE, 6TH DISTRICT, 3006 S 27TH STREET 7TH DISTRICT, 3626 W FOND DU LAC AVENUE MILWAUKEE, WI
05/25/2018 03:30 PM UTC
OFFICIAL NOTICE 61-1-2018
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, 7” CONCRETE DRIVEWAY, 5” CONCRETE WALK, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALKS AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE DRIVEWAYS, CRACKING AND SEATING CONCRETE PAVEMENT, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.
05/24/2018 03:30 PM UTC
OFFICIAL NOTICE 78-1-2018
WATER MAIN RELAYS at the following locations: W. Crossfield Av. (WT410180654), W. Douglas Av. to W. Bender Av. (17 working days); W. Winfield Av. (WT410180655), W. Bender Av. to 190 Ft. E/O N. 89th St. (17 working days); W. Bender Av. (WT410180656), N. Joyce Av. to N. 91st St. (34 working days); W. Monrovia Av. (WT410180657), W. Crossfield Av. to W. Bender Av. (35 working days); N. 89th St. (WT410180658), W. Lynx Av. to W. Monrovia Av. (13 working days); W. Douglas Av. (WT410180659), N. Joyce Av. to N. 89th St. (30 working days); W. Lynx Av. (WT410180660), N. 84th St. to N. 89th St. (45 working days); N. Joyce Av. (WT410180661), W. Lynx Av. to W. Mill Rd. (36 working days); N. 86th Ct. (WT410180662), N. Joyce Av. to 320 Ft. NE/O N. Joyce Av. (11 working days); W. Kaul Av. (WT410180663), N. 84th St. to N. 87th St. (28 working days); N. 87th St. (WT410180664), W. Kaul Av. to W. Douglas Av. (13 working days). (Note: Contractor to furnish and install approximately 13,199 lin. ft. of ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
05/23/2018 03:30 PM UTC
OFFICIAL NOTICE 005-1-2018
SANITARY AND COMBINED SEWER MAIN RELAY, COMBINED SEWER MAIN LINING AND MANHOLE REPAIR AND LINING in: Located at: N. 33rd St. – 220’ +/- South of W. Clybourn St. to W. Clybourn St. N. 41st St. – W. Hampton Ave. to W. Stark St. E. Bradford Ave. – N. Frederick Ave. to N. Maryland Ave. E. Wisconsin Ave. – N. Broadway to N. Water St.
05/22/2018 03:30 PM UTC
OFFICIAL NOTICE 41-1-2018
LINCOLN GARAGE REROOFING 3921 W LINCOLN AVENUE MILWAUKEE, WISCONSIN
05/21/2018 03:30 PM UTC
OFFICIAL NOTICE 66-1-2018
POLICE ADMINISTRATION BUILDING 3RD FLOOR RENOVATIONS 749 WEST STATE STREET MILWAUKEE WI 53233
05/17/2018 03:30 PM UTC
OFFICIAL NOTICE 76-1-2018
Poured-In-Place Resilient Rubber Surface Installation Various MKE Parks Locations Milwaukee WI
05/14/2018 03:30 PM UTC
OFFICIAL NOTICE 65-1-2018
WATER MAIN RELAY at the following location: W. Vliet St. (WT410180007), N. 12th St. to N. 27th St. (120 working days). (Note: Contractor to furnish and install approximately 7,548 lin. ft. of 16", 12", 8", 6", 4" and 3" ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
05/07/2018 03:30 PM UTC
OFFICIAL NOTICE 62-1-2018
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, INSTALLATION OF PERMEABLE PAVERS, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE WALKS AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE DRIVEWAYS, CRACKING AND SEATING CONCRETE PAVEMENT, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.
05/03/2018 03:30 PM UTC
921 - 930 of 1601 Solicitations
1 2 89 90 91 93 95 96 97 160 161