We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 31-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PAVEMENT MARKING, ETC.; Construct Asphalt Speed Humps at the Following Locations: (ST211180126) N. 25th St. – W. Melvina St. to W. Capitol Dr. (1 speed hump) (ST211180140) N. 26th St. – W. Auer Ave. to W. Townsend St. (2 speed humps) (ST211170191) N. 26th Sr. – W. Hope Ave. to W. Roosevelt Dr. (1 speed hump) (ST211180147) N. 33rd St. – W. Lloyd St. to W. North Ave. (2 speed humps) (ST211170129) N. 37th St. – W. Lloyd St. to W. Garfield Ave. (1 speed hump) (ST211180151) N. 44th St. – W. Meinecke Ave. to W. Wright St. (1 speed hump) (ST211180152) N 45th St. – W. Glendale Ave. to W. Hampton Ave. (3 speed humps) (ST211170148) N. 47th St. – W. Hampton Ave. to W. Fairmount Ave. (2 speed humps) (ST211180129) N. 48th St. – W. Meinecke Ave. to W. Wright St. (1 speed hump) (ST211180154) N. 48th St. – W. Villard Ave. to W. Rohr Ave. (1 speed hump) (ST211180143) N. 63rd St. – W. Capitol Dr. to W. Fiebrantz Ave. (1 speed hump) (ST211180145) S. 7th St. – W. Becher St. to W. Rogers St. (1 speed hump) (ST211160127) S. 7th St. – W. Lincoln Ave. to W. Becher St. (2 speed humps) (ST211180123) S. 7th St. – W. Holt Ave. to W. Ohio Ave. (1 speed hump) (ST211180138) S. 18th St. – W. Arthur Ave. to W. Hayes Ave. (2 speed humps) (ST211180125) S. 18th St. – W. Hayes Ave. to W. Lincoln Ave. (1 speed hump) (ST211180127) S. 29th St. – W. Lincoln Ave. to W. Grant St. (1 speed hump) (ST211180128) S. 30th St. – W. Hayes Ave. to W. Arthur Ave. (1 speed hump) (ST211180141) S. 31st St. – W. Scott St. to W. National Ave. (2 speed humps) (ST211180130) W. Chambers St. – N. 26th St. to N. 27th St. (1 speed hump) (ST211170163) W. Fairmount Ave. – N. 24th St. to N. 27th St. (4 speed humps) (ST211170164) W. Fairmount Ave. – N. Green Bay Ave. to N. 24th St. (5 speed humps)
06/20/2018 03:30 PM UTC
OFFICIAL NOTICE 88-1-2018
COMBINED SEWER MAIN RELAY & COMBINED SEWER MAIN LINING IN: Alley W. of S. 2nd St. – W. Oregon St. to 125’ +/- S. of W. Oregon St.
06/15/2018 03:30 PM UTC
OFFICIAL NOTICE 91-1-2018
WATER MAIN RELAYS at the following locations: N. 57th St. (WT410180624), W. Villard Ave. to W. Sheridan Ave. (48 working days); W. Villard Ave. (WT410180644), N. 56th St. to N. 60th St. (38 working days); N. 57th St. (WT410180645), W. Hampton Ave. to W. Villard Ave. (59 working days). (Note: Contractor to furnish and install approximately 6,054 lin. ft. of ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/14/2018 03:30 PM UTC
OFFICIAL NOTICE 101-1-2018
50 LEAD SERVICE LINE REPLACEMENTS at various locations within the City of Milwaukee.
06/14/2018 03:30 PM UTC
OFFICIAL NOTICE 74-1-2018
CONSTRUCTION OF 5 INCH CONCRETE WALKS, CONCRETE WALK W/INTEGRAL CURB, 7 INCH CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 7 INCH HIGH EARLY STRENGTH CONCRETE DRIVEWAYS, DETECTABLE WARNING FIELDS, AND CONCRETE WALKS, DRIVEWAYS, AND CONCRETE CURB AND GUTTER REMOVALS, ETC.; Located at: ST230180155: Area Wide Sidewalk Replacements - 2018 ABB: W. North Av., N 32nd St., W. Meinecke Av. & N. 35th St. ABB: W. Mitchell St., S. 11th St., W. Becher St. & S. 13th St. ABB: W. Cleveland Av., S 47th St., W Oklahoma Av. & S. 51st St. And Various School Locations
06/13/2018 03:30 PM UTC
OFFICIAL NOTICE 86-1-2018
WATER MAIN RELAYS at the following locations: W. Lincoln Ave. (S/S) (WT410170696), at S. 37th St. (10 working days); S. 24th St. (WT410180608), W. Warnimont Ave. to W. Wilbur Ave. (19 working days); S. 52nd St. (WT410180619), W. Crawford Ave. to W. Howard Ave. (20 working days); W. Crawford Ave. (WT410180620), S. 51st St. to S. 53rd St., (15 working days); E. Tripoli Ave. (WT410180665), S. Clement Ave. to S. Hanson Ave. (16 working days); S. Griffin Ave. (WT410180693), 620 Ft. N/O E. Howard Ave. to E. Howard Ave. (19 working days); S. Quincy Ave./S. Quincy Ct. (WT410180694), E. Morgan Ave. to 215 Ft. S/O E. Wilbur Ave. (33 working days). Note: Contractor to furnish and install approximately 4,639 lin. ft. of ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/07/2018 03:30 PM UTC
OFFICIAL NOTICE 39-1-2018
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, ETC.; Located at: ST216180108 - Handicap Ramp Work to Meet ADA Requirements at Various Locations on the 2018 High Impact Paving Projects of Office Notice No.’s 14-2018, 15-2018, & 16-2018: O.N. # 14-2018 Locations: North Bartlett Avenue – East Locust Street to East Kenwood Boulevard North Bartlett Avenue – East Kenwood Boulevard to East Providence Avenue East/West Burleigh Street – North Holton Street to North 7th Street West Hopkins Street/North 31st Street – North 27th Street to West Capitol Drive North Sherman Boulevard – West Congress Street to West Hampton Avenue O.N. # 15-2018 Locations: North 84th Street – West Center Street to West Burleigh Street West Burleigh Street – North 92nd Street to City Limits (Menomonee River) West Center Street- North 60th Street to North 76th Street West Locust Street – North 51st Street to North 60th Street North 55th Street – West Burleigh Street to West Louise Place North Norwood Place – West Louise Place to West Philip Place North Humboldt Boulevard – West Keefe Avenue to West Capitol Drive O.N. # 16-2018 Locations: North 51st Boulevard – West Hampton Avenue to West Silver Spring Drive North 51st Boulevard – West Good Hope Road to West Calumet Road West Fond du Lac Avenue – West Silver Spring Drive to a point West of North 87th Street West Granville Road – West Bradley Road to North 107th Street West Hampton Avenue – North 60th Street to North 68th Street
06/06/2018 03:30 PM UTC
OFFICIAL NOTICE 64-1-2018
CRACKFILL ASPHALT AND CONCRETE STREET PAVEMENTS WITH A HOT-APPLIED ASPHALT BASED PRODUCT USED TO SEAL AND FILL CRACKS AND JOINTS. ADDITIONAL WORK INVOLVING THE FILLING OF SMALL HOLES, JOINT FAILURES, EXPOSURE OF WIRE MESH AND OTHER MINOR SURFACE DEFECTS USING HOT-APPLIED ASPHALT BASED PRODUCT AND PEA GRAVEL WILL BE REQUIRED ON ALL PAVEMENTS. ETC.; Located at: ST211180169 - Various Street Locations within the City of Milwaukee
06/06/2018 03:30 PM UTC
OFFICIAL NOTICE 85-1-2018
WATER MAIN RELAYS at the following locations: W. Fiebrantz Ave. (WT410180603), N. 88th St. to N. 89th St. (10 working days); N. 87th St. (WT410180604), W. Capitol Dr. to W. Fiebrantz Ave. (19 working days); W. Auer Ave. (WT410180609), N. 84th St. to N. 85th St. (15 working days); W. Elmore Ave. (WT410180610), N. Willis Pl. to N. 94th St., (10 working days); N. 87th St. (WT410180638), W. Arden Pl. to W. Palmetto Ave. (10 working days); W. Glendale Ave. (WT410180639), N. 84th St. to N. 87th St. (28 working days); W. Herbert Ave. (WT410180640), W. Hampton Ave. to N. 90th St. (40 working days); W. Ruby Ave. / N. 88th St. (WT410180641), N. 85th St. to W. Lawrence Ave. (33 working days). Note: Contractor to furnish and install approximately 6,147 lin. ft. of ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/01/2018 03:30 PM UTC
OFFICIAL NOTICE 87-1-2018
COUNTING, PROCESSING AND MAINTAINING PARKING METER COLLECTIONS
05/31/2018 03:30 PM UTC