General Info

Business Logo

San Joaquin County Department of Public Works

1810 E Hazelton Ave, Stockton, CA 95205-6232
(209) 468-3000

The overall mission of the San Joaquin County Department of Public Works is to plan, design, construct, operate and maintain the County infrastructure, which includes public roads, transportation systems, bridges, water, wastewater, channel maintenance and solid waste disposal systems of the County, in order to best serve the interests of the people. These systems are maintained to protect the health and welfare of the public and the County’s financial investments. Public Works also provides vehicle support for the County, including procurement support, heavy and light vehicle maintenance and repair, and daily rental services.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
SJCDPW-RFP-26-07
The San Joaquin County Department of Public Works (SJCDPW) requests technical proposals from qualified consulting firms to undertake, perform, and complete the tasks set forth in Request for Proposals – SJCDPW-RFP-26-07. The selected consulting firm (CONSULTANT) will perform professional and technical engineering services for the Washing Area Complete Streets Project (PROJECT). CONSULTANT will design and engineer the Washington area neighborhood roadway into a "complete streets" corridor, The PROJECT will include the construction of new sidewalks and buffered bike lanes, as well as enhanced intersections throughout the project area. Improvements will be constructed along Washington Street, Del Mar Avenue, Horner Avenue, and Walker Lane. Washington Street Improvements (Anteros Avenue to Walker Lane) • New curb, gutter and sidewalk on the north and south sides of the street. • Reconfigured striping to add buffered bike lanes and parking lanes in each direction. • Add ladder-style pedestrian crosswalk markings at Hinkley Ave, Olive Ave, Adelbert Ave, Gertrude Ave, Sinclair Ave, Coolidge Ave, Carroll Ave, Dawes Ave, Wagner Ave, Del Mar Ave, Anthony Ave, and Thelma Ave intersections. • Add pedestrian crosswalk striping at the Anteros Ave, Oro Ave, Adrienne Ave, Walker Ave, May Ave, and Walker Ave intersections. • Add ADA curb ramps at all intersection corners. • Add corner curb extensions (bulb-outs) with ADA curb ramps at each corner of the Oro Ave, Gertrude Ave, Wagner Ave, Adrienne Ave, and Walker Ave intersections. • Add a traffic circle at the Carroll Ave intersection. • Storm drain pipe and inlet installation, as necessary to complete the storm drainage network Del Mar Avenue Improvements (Horner Avenue to Washington Street) • New curb, gutter, and sidewalk along the east and west sides of the street. • Add ADA-compliant curb ramps at intersections, as necessary. • Add pedestrian crosswalk striping at the Marsh St and Hobart Ave intersections. Horner Avenue Improvements (Del Mar Avenue to Walker Lane) • New curb, gutter, and sidewalk along the north side of the street. • Add ADA-compliant curb ramps at intersections, as necessary. • Walker Lane Improvements (Horner Avenue to Washington Street) • New curb, gutter, and sidewalk along the east and west sides of the street. • ADA-compliant curb ramps at intersections, as necessary. • Add pedestrian crosswalk striping at the Marsh St and Hobart Ave intersections. Engineering services estimated duration………………………………………...Twelve (12) months
07/27/2026 11:00 PM UTC
SJCDPW-RFP-26-08
The San Joaquin County Department of Public Works (SJCDPW) requests technical proposals from qualified consulting firms to undertake, perform, and complete the tasks set forth in Request for Proposals – SJCDPW-RFP-26-08. The selected consulting firm (CONSULTANT) will perform professional and technical engineering services for the Design Engineering for the State Route (SR) 26 and Jack Tone Road Roundabout Project (PROJECT). The selected CONSULTANT will be the highest-ranking CONSULTANT that has successfully negotiated the terms for award of a consultant services agreement. The selected CONSULTANT will be requested to enter into a consultant services agreement with San Joaquin County. The CONSULTANT shall prepare project documentation, plans, specifications and estimates consistent with SJCDPW Standards and Caltrans Guidance documents including but not limited to; Project Development Procedures Manual, Plans Preparation Manual, California Manual on Uniform Traffic Control Devices, Construction Contract Development Guide, and Right of Way Manual. SJCDPW’s goal, for scheduling purposes, is to have the Project Study Report – Project Development Support or other agreed upon alternative Project Initiation Document within twelve (12) months or less from issuance of the Notice to Proceed (NTP). Submission of the sixty-five percent (65%) design completed for the PROJECT within twenty-four (24) months or less from issuance of the NTP. Within this time, the necessary survey data will be collected and analyzed, and the roadway geometry/topography will be identified. Submission of the ninety-five percent (95%) design shall be due on or before thirty (30) months from issuance of the NTP. Right-of-Way activities shall be completed within forty-two (42) months from issuance of the NTP. Submission of the Final signed PS&E shall be due on or before forty-eight (48) months from issuance of the NTP. The deadline for submitting technical proposals to SJCDPW will be no later than 4:00 p.m. on Monday, August 10, 2026. A copy of SJCDPW-RFP-26-08 is available to view at the Internet address: https://www.sjgov.org/department/pwk/rfps_and_rfqs and https://www.bidexpress.com . All prospective consultants must register for solicitation No. SJCDPW-RFP-26-08 in order to be added to the Proposers’ List and, if necessary, receive a Notice of Release of Addendum. It is imperative that prospective consultants check the solicitation Web page often for the status and/or modifications. For general questions regarding the solicitation, please contact Mr. Nhan Tran, Management Analyst II at email: ntran@sjgov.org .
08/10/2026 11:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
Horner Avenue Resufacing
** On April 1, 2020, the Board of Supervisors ordered that the Department’s office be closed to the public in response to the 2019 Novel Coronavirus (COVID-19); however, bids will continue to be opened and publicly read via webcast at www.youtube.com/channel/UC6cc1m_5WvN283Ix6DV_GZA, immediately after the specified closing time for the above-mentioned project. The work is located in East Stockton. Base Estimate Range Between: $470,000 and $575,000
05/28/2020 08:30 PM UTC
Job Order Contracts JOC-014, JOC-015, JOC-016
** On April 1, 2020, the Board of Supervisors ordered that the Department’s office be closed to the public in response to the 2019 Novel Coronavirus (COVID-19); however, bids will continue to be opened and publicly read via webcast at www.youtube.com/channel/UC6cc1m_5WvN283Ix6DV_GZA, immediately after the specified closing time for the above-mentioned project. A Job Order Contract is an indefinite quantity contract pursuant to which the Contractor may perform an ongoing series of individual Projects at different locations throughout San Joaquin County.
05/21/2020 08:30 PM UTC
Shippee Lane Resurfacing
**On April 1, 2020, the Board of Supervisors ordered that the Department’s office be closed to the public in response to the 2019 Novel Coronavirus (COVID-19); however, bids will continue to be opened and publicly read via webcast at www.youtube.com/channel/UC6cc1m_5WvN283Ix6DV_GZA, immediately after the specified closing time for the above-mentioned project. The work is located east of Stockton in the town of Morada. The work in general, consists of repairing and resurfacing approximately 0.9 mile of a mile of existing roadway. Engineer's Estimate: $325,000 to $398,000
04/30/2020 08:30 PM UTC
Magnolia Avenue and Mahon Avenue Resurfacing
** On April 1, 2020, the Board of Supervisors ordered that the Department’s office be closed to the public in response to the 2019 Novel Coronavirus (COVID-19); however, bids will continue to be opened and publicly read via webcast at www.youtube.com/channel/UC6cc1m_5WvN283Ix6DV_GZA, immediately after the specified closing time for the above-mentioned project. The work is located north of the City of Escalon. The work, in general, consists of repairing and resurfacing approximately 2 miles of existing rural roadway with asphalt concrete. Base Estimate Range Between: $677,700 and $835,300
04/30/2020 08:30 PM UTC
Ellen Street and Shaw Road Resurfacing
** On April 1, 2020, the Board of Supervisors ordered that the Department’s office be closed to the public in response to the 2019 Novel Coronavirus (COVID-19); however, bids will continue to be opened and publicly read via webcast at www.youtube.com/channel/UC6cc1m_5WvN283Ix6DV_GZA, immediately after the specified closing time for the above-mentioned project. The work is located in East Stockton. The project, in general, consists of repairing and resurfacing approximately 1 mile of existing local roadway with asphalt concrete over pavement reinforcing fabric. Base Estimate Range Between: $426,000 and $520,000
04/30/2020 08:30 PM UTC
Sidewalk Accessibility Improvements 2019-2020
The work is located in Eaglecrest Orchard, Linden, and Industrial Parkway. The work, in general, consists of construction of new curb ramps, rebuilding substandard curb ramps, retrofitting substandard curb ramps with a detectable warning surface, and grinding down raised lip at standard curb ramps where necessary. Base Estimate Range Between: $643,000 to $786,000
04/16/2020 08:30 PM UTC
El Dorado Street Resurfacing, Federal Aid Project No. STPL-5929(295)
Federal Aid Project No. STPL-5929(295) The work is located between the City of Stockton and the City of Lathrop. The work, in general, consists of repairing and resurfacing approximately 1.3 miles of existing urban roadway with asphalt concrete. Base Estimate Range Between: $987,000 and $1,206,000
04/09/2020 08:30 PM UTC
Emerson Road and Eunice Avenue Resurfacing
The work is located approximately four miles north of the City of Lodi. The work, in general, consists of repairing and resurfacing approximately 0.50 mile of existing roadway. Base Estimate Range Between: $220,000 and $270,000
04/02/2020 08:30 PM UTC
Chip Seal 2019-2020
The work is located on various roads throughout San Joaquin County. The work, in general, consists of chip sealing approximately 57 miles of existing urban and rural roadways. Base Estimate Range Between: $2,498,000 to $3,053,000
04/02/2020 08:30 PM UTC
Tully Road Resurfacing
1,180' South of Jahant Road to Collier Road The work is located northeast of the City of Lodi. The work, in general, consists of repairing and resurfacing approximately one mile of rural roadway. Base Estimate Range Between: $368,000 to $454,000
03/19/2020 08:30 PM UTC
261 - 270 of 304 Solicitations
1 2 23 24 25 27 29 30 31