General Info

Business Logo

San Joaquin County Department of Public Works

1810 E Hazelton Ave, Stockton, CA 95205-6232
(209) 468-3000

The overall mission of the San Joaquin County Department of Public Works is to plan, design, construct, operate and maintain the County infrastructure, which includes public roads, transportation systems, bridges, water, wastewater, channel maintenance and solid waste disposal systems of the County, in order to best serve the interests of the people. These systems are maintained to protect the health and welfare of the public and the County’s financial investments. Public Works also provides vehicle support for the County, including procurement support, heavy and light vehicle maintenance and repair, and daily rental services.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
SJCDPW-RFP-26-07
The San Joaquin County Department of Public Works (SJCDPW) requests technical proposals from qualified consulting firms to undertake, perform, and complete the tasks set forth in Request for Proposals – SJCDPW-RFP-26-07. The selected consulting firm (CONSULTANT) will perform professional and technical engineering services for the Washing Area Complete Streets Project (PROJECT). CONSULTANT will design and engineer the Washington area neighborhood roadway into a "complete streets" corridor, The PROJECT will include the construction of new sidewalks and buffered bike lanes, as well as enhanced intersections throughout the project area. Improvements will be constructed along Washington Street, Del Mar Avenue, Horner Avenue, and Walker Lane. Washington Street Improvements (Anteros Avenue to Walker Lane) • New curb, gutter and sidewalk on the north and south sides of the street. • Reconfigured striping to add buffered bike lanes and parking lanes in each direction. • Add ladder-style pedestrian crosswalk markings at Hinkley Ave, Olive Ave, Adelbert Ave, Gertrude Ave, Sinclair Ave, Coolidge Ave, Carroll Ave, Dawes Ave, Wagner Ave, Del Mar Ave, Anthony Ave, and Thelma Ave intersections. • Add pedestrian crosswalk striping at the Anteros Ave, Oro Ave, Adrienne Ave, Walker Ave, May Ave, and Walker Ave intersections. • Add ADA curb ramps at all intersection corners. • Add corner curb extensions (bulb-outs) with ADA curb ramps at each corner of the Oro Ave, Gertrude Ave, Wagner Ave, Adrienne Ave, and Walker Ave intersections. • Add a traffic circle at the Carroll Ave intersection. • Storm drain pipe and inlet installation, as necessary to complete the storm drainage network Del Mar Avenue Improvements (Horner Avenue to Washington Street) • New curb, gutter, and sidewalk along the east and west sides of the street. • Add ADA-compliant curb ramps at intersections, as necessary. • Add pedestrian crosswalk striping at the Marsh St and Hobart Ave intersections. Horner Avenue Improvements (Del Mar Avenue to Walker Lane) • New curb, gutter, and sidewalk along the north side of the street. • Add ADA-compliant curb ramps at intersections, as necessary. • Walker Lane Improvements (Horner Avenue to Washington Street) • New curb, gutter, and sidewalk along the east and west sides of the street. • ADA-compliant curb ramps at intersections, as necessary. • Add pedestrian crosswalk striping at the Marsh St and Hobart Ave intersections. Engineering services estimated duration………………………………………...Twelve (12) months
07/27/2026 11:00 PM UTC
SJCDPW-RFP-26-08
The San Joaquin County Department of Public Works (SJCDPW) requests technical proposals from qualified consulting firms to undertake, perform, and complete the tasks set forth in Request for Proposals – SJCDPW-RFP-26-08. The selected consulting firm (CONSULTANT) will perform professional and technical engineering services for the Design Engineering for the State Route (SR) 26 and Jack Tone Road Roundabout Project (PROJECT). The selected CONSULTANT will be the highest-ranking CONSULTANT that has successfully negotiated the terms for award of a consultant services agreement. The selected CONSULTANT will be requested to enter into a consultant services agreement with San Joaquin County. The CONSULTANT shall prepare project documentation, plans, specifications and estimates consistent with SJCDPW Standards and Caltrans Guidance documents including but not limited to; Project Development Procedures Manual, Plans Preparation Manual, California Manual on Uniform Traffic Control Devices, Construction Contract Development Guide, and Right of Way Manual. SJCDPW’s goal, for scheduling purposes, is to have the Project Study Report – Project Development Support or other agreed upon alternative Project Initiation Document within twelve (12) months or less from issuance of the Notice to Proceed (NTP). Submission of the sixty-five percent (65%) design completed for the PROJECT within twenty-four (24) months or less from issuance of the NTP. Within this time, the necessary survey data will be collected and analyzed, and the roadway geometry/topography will be identified. Submission of the ninety-five percent (95%) design shall be due on or before thirty (30) months from issuance of the NTP. Right-of-Way activities shall be completed within forty-two (42) months from issuance of the NTP. Submission of the Final signed PS&E shall be due on or before forty-eight (48) months from issuance of the NTP. The deadline for submitting technical proposals to SJCDPW will be no later than 4:00 p.m. on Monday, August 10, 2026. A copy of SJCDPW-RFP-26-08 is available to view at the Internet address: https://www.sjgov.org/department/pwk/rfps_and_rfqs and https://www.bidexpress.com . All prospective consultants must register for solicitation No. SJCDPW-RFP-26-08 in order to be added to the Proposers’ List and, if necessary, receive a Notice of Release of Addendum. It is imperative that prospective consultants check the solicitation Web page often for the status and/or modifications. For general questions regarding the solicitation, please contact Mr. Nhan Tran, Management Analyst II at email: ntran@sjgov.org .
08/10/2026 11:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
Kasson Road Resurfacing
(Stanislaus County Lined to Airport Way) The work is located southeast from the City of Tracy. The work, in general, consists of resurfacing and repairing approximately 1.80 miles of existing rural roadway. Base Estimate Range Between: $681,000 to $833,000
08/01/2019 08:30 PM UTC
Henry Road Resurfacing
Santa Fe Road to Orange Avenue The work is located Southeast of the Town of Escalon. The work, in general, consists of resurfacing the existing roadway and replenishing shoulder backing. Base Estimate Range Between: $524,600 to $644,380
08/01/2019 08:30 PM UTC
Foppiano Lane Resurfacing
100' E/O N 99 Frontage Road (E) to CCT RR The work is located east of Stockton in the town of Morada. The work, in general, consists of resurfacing and repairing approximately 0.9 miles of rural roadway. Base Estimate Range between: $379,000 to $463,000
07/11/2019 08:31 PM UTC
Harlan Road Resurfacing
Lathrop City Limits to Mathews Road The work is located North of the City of Lathrop. The work, in general, consists of repairing and resurfacing approximately 1.7 miles of existing local rural roadway with asphalt concrete over pavement reinforcement fabric and adding gravel shoulder. Base Estimate Range Between: $775,170 to $947,430
07/11/2019 08:31 PM UTC
SJCDPW-RFQ-19-03
The San Joaquin County Department of Public Works (SJCDPW) requests Statements of Qualifications (SOQ) from innovative engineering consulting firms for On-Call Bridge Engineering Services in support of the San Joaquin County (COUNTY) Highway Bridge Program (HBP) and local Bridge Preventive Maintenance Projects (BPMP). This procurement will be comprised of evaluation of SOQs and presentation-interviews with select firms as described in this Request For Qualifications (RFQ). SJCDPW intends to establish a list of up to three (3) consulting firms to provide support services on an as-needed basis for various bridge projects that become available over the next two (2) years. SJCDPW may also elect to extend the period for new project assignments to a third year. Duration, scope, and scheduling of services will vary with specific project assignments. At the time of project assignment, County will enter into a project specific Independent Consultant Agreement (Agreement). The amount of work for each project specific Agreement will be varied but will not exceed $200,000 annually per project. The method of payment for Agreement will be actual cost plus fixed fee. The deadline for submitting qualifications to SJCDPW will be no later than 4:00 p.m. on Friday, June 14, 2019. SJCDPW’s standard business practice strives to ensure that a consultant’s professional qualifications meet the needs and services to be performed, the payment method is appropriate, and the cost is fair and reasonable to the public agency. The specific requirements set forth in SJCDPW-RFQ-19-03 should be closely examined and followed by those consultant firms interested in submitting statements of qualifications. A copy of SJCDPW-RFQ-19-03 is available to view at the Internet address: https://www.sjgov.org/department/pwk/rfps_and_rfqs. All prospective consultants must register for solicitation No. SJCDPW-RFQ-19-03 in order to be added to the Proposers’ List and, if necessary, receive a Notice of Release of Addendum and information about the pre-bid meeting. It is imperative that prospective consultants check the solicitation Web page often for the status and/or modifications. Alternative arrangements may be made to secure a hard copy of SJCDPW-RFQ-19-03 or general questions regarding the Project by calling Ms. Cathy McKinney, Administrative Assistant I, at the telephone number (209) 468-3174, email: cmckinney@sjgov.org
06/14/2019 11:00 PM UTC
Job Order Contracts JOC-011, JOC-012, JOC-013
County, State and Federal Funded Projects
05/23/2019 08:31 PM UTC
SJCDPW-RFP-19-02
The San Joaquin County Department of Public Works (SJCDPW) requests technical proposals from qualified consulting engineers to undertake, perform, and complete tasks set forth in Request for Proposals SJCDPW-RFP-19-02. The selected consultant firm (CONSULTANT) will perform professional and technical engineering services (SERVICES) for the Grant Line Road Realignment Project (PROJECT). The purpose of PROJECT is to provide enhanced traffic safety, improve operation of the roadway network, and meet future traffic demands by reducing congestion in the area in and around the community of Banta. County adopted an Environmental Impact Report in December 2018 that identifies a preferred alternative for the PROJECT. Phased work effort: The requested SERVICES will be conducted in two phases. CONSULTANT will complete Phase One first. Phase Two work will be contingent on the outcome of Phase One. Phase One work includes preparation of a Grade Separation Analysis (GSA) in cooperation with Union Pacific Railroad (UPRR), and coordination with the California Public Utilities Commission (CPUC), for a new at-grade crossing per the preferred alternative alignment. Additionally, Phase One requires coordination with UPRR/CPUC for closure of up to three existing at-grade crossings. If the GSA determines a new at-grade crossing is infeasible, the County may opt to refrain from moving forward with Phase Two work. The deadline for submitting technical proposals to SJCDPW will be no later than 4:00 p.m. on Friday, May 17, 2019. SJCDPW’s standard business practice strives to ensure that a consultant’s professional qualifications meet the needs and services to be performed, the payment method is appropriate, and the cost is fair and reasonable to the public agency. The specific requirements set forth in SJCDPW-RFP-19-02 should be closely examined and followed by those consultant firms interested in submitting statements of qualifications. A copy of SJCDPW-RFP-19-02 is available to view at the Internet address: https://www.sjgov.org/department/pwk/rfps_and_rfqs. All prospective consultants must register for solicitation No. SJCDPW-RFP-19-02 in order to be added to the Proposers’ List and, if necessary, receive a Notice of Release of Addendum and information about the pre-bid meeting. It is imperative that prospective consultants check the solicitation Web page often for the status and/or modifications. Alternative arrangements may be made to secure a hard copy of SJCDPW-RFP-19-02 or general questions regarding the Project by calling Mr. Nhan Tran, Management Analyst II, at the telephone number (209) 953-7452.
05/17/2019 11:00 PM UTC
Middle Road Resurfacing
Reeve Road to Naglee Road The work is located in Tracy, California. The work, in general, consists of resurfacing the existing roadway and replenishing shoulder backing. Base Estimate Range Between: $766,100 to $926,400
05/16/2019 08:31 PM UTC
North County Landfill Entrance Road Widening
Harney Lane to Scale House The work is located east of the City of Lodi. The work, in general, consists of roadway widening and installation of new electrical and telephone conduit. Base Estimate Range Between: $311,500 to $380,500
05/16/2019 08:31 PM UTC
Fernwood Road Resurfacing
Ashley Lane to North End The work is located northeast of the City of Stockton. The work, in general, consists of resurfacing and repairing approximately 0.60 mile of existing rural roadway. Base Estimate Range Between: $272,700 to $332,200
05/16/2019 08:31 PM UTC
281 - 290 of 304 Solicitations
1 2 23 24 25 26 27 29 31