City and Borough of Sitka
100 Lincoln St, Sitka, AK 99835-7540
(907) 747-1800
100 Lincoln St, Sitka, AK 99835-7540
(907) 747-1800
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
RFP Professional Service Roster - 2025
The City and Borough of Sitka (CBS) is soliciting qualifications-based proposals from consultants to populate its Professional Services Roster.
The duration for this Roster is from June 12, 2024, through the remainder of calendar year 2025.
CBS will utilize the Roster to select professional services throughout the duration of the Roster period. This solicitation will be posted on Bid Express and open to submission for the duration.
| 11/01/2025 01:00 AM UTC |
RFQ Electric Utility Professional Service Roster
The CBS Electric Utility Department expects to rely primarily on its Professional Services Roster to award professional service contracts. CBS expects to maintain this Professional Services Roster through 2025 as described in this solicitation, until a new roster is established in 2026.
| 11/01/2025 01:00 AM UTC |
Number | Deadline |
---|---|
Nelson Logging Road Construction Project
This project consists of providing all labor, equipment and material necessary for the Nelson Logging Road Project. The project includes construction of all rock excavation, tree removal, gravel road reconstruction ditching, pedestrian trail, fish passage storm drain culverts 100’ road bridge, electrical lines and poles, telephone line, archeological monitoring and other ancillary items required to complete the work.
| 03/22/2018 10:00 PM UTC |
East Degroff Street Utility and Street Improvements
This project consists of providing all labor, equipment and material necessary for the East DeGroff Street Utility and Street Improvements Project. The project includes construction of all water, sewer, storm drain, curb & gutter, sidewalk, AC pavement and other ancillary items required to complete the work.
| 03/06/2018 11:00 PM UTC |
RFP E911 System Replacement
The Request for Proposal (RFP) solicits proposals from vendors who can provide the required equipment and/or services for a complete overhaul and/or replacement of the CBS 911 System.
| 03/01/2018 11:00 PM UTC |
Jarvis Fuel Sytem Improvement Project
The project consists of providing all labor, equipment and material necessary for the Jarvis Fuel System Improvement Project. The project includes various improvements to existing above-ground fuel distribution piping and other ancillary items required to complete the work. Nominal pipe diameters are 4" and smaller.
| 02/28/2018 11:00 PM UTC |
Sitka Wayfinding Signage
This work consists of providing all labor, equipment, and material necessary to furnish and install the Sitka Wayfinding Signage, including but not limited to providing, engineering, production of shop drawings, fabrication, shipping/delivery and installation.
| 02/20/2018 11:00 PM UTC |
Blue Lake Dam Access Project
The project consists of providing all labor, equipment and material necessary for the Blue Lake Dam Access Project. The project includes designing, furnishing and installing steel platforms, fall protection hardware, gates and other ancillary items required to complete the work.
| 01/18/2018 11:00 PM UTC |
Furnish Sand and Gravel
This project consists of furnishing sand and gravel to the Public Service Center, 113 Jarvis Street, and/or the Kimsham Ballfield Complex beyond Kashevaroff Street, Sitka, Alaska.
| 12/28/2017 11:00 PM UTC |
GPIP Shoreline Stabilization 2017
This project consists of providing all labor, equipment and material necessary for the Gary Paxton Industrial Park Shoreline Stabilization Project 2017. The project includes excavation and backfill of existing embankment, installation of construction fabric envelopment, placement of CBS provided oversize riprap and furnish and installation of oversize riprap and other ancillary items that are also required to complete the work.
| 09/14/2017 10:00 PM UTC |
On-Call Electrical Work
The City and Borough of Sitka (CBS) is soliciting on-call contractors to support the CBS with routine electrical work. Contractor(s) must have a collective bargaining agreement or letter of assent with the Union (IBEW 1547).
| 08/03/2017 10:00 PM UTC |
CBS Comprehensive Electrical Load Analysis and Load Development Plan
The project will include, but not necessarily be limited to: a comprehensive electrical load analysis of the CBS system, load development planning with the CBS, and a report of findings.
| 06/13/2017 10:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.