General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-33-2
Grand Ave-----------------------------------------Contractor shall provide all adequate and competent labor, equipment, and materials necessary to improve the roadway surface by milling and overlaying approximately 1,100 feet of asphaltic concrete. Approximately 650 feet of Grand Ave will be raised to an elevation of 2.5 feet, with the installation of 96 feet of subsurface drainage and roadway striping for this section of roadway, located along Grand Ave (R07H029) Section 45, Township 9S, Range 13E.
11/18/2025 08:00 PM UTC
25-59-1
Lamarque St Drainage----The Parish requests a Contractor to improve drainage by removing and replacing culverts and subsurface drainage pipes along Lamarque St., located in Mandeville, LA, as required in the specifications.
11/19/2025 08:00 PM UTC
25-32-2
Oak Park Drainage Improvements - Phase I ------------------------- The work shall consist of drainage improvements within the Oak Park Estates area. The work includes upgrading the existing roadway ditches and driveway culverts along Gale Street, Cheryl Street, Oak Park Road, and Helen Drive to ensure positive stormwater flow. Additionally, the work shall include drainage improvements along Brewster Road from Dominion Subdivision to Lateral 21-IWI-3.
11/20/2025 08:00 PM UTC
25-57-1
Landscaping and Maintenance Service- Justice Center & Tyler Street---------------------------The Provider shall provide all supervision, labor, materials, supplies, and equipment as may be necessary to complete and provide landscape maintenance services for the St. Tammany Parish Justice Center Complex (JC) and the St. Tammany Parish Tyler Street Complex.
11/20/2025 08:00 PM UTC
25-58-1
Forest Dr Drainage------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to remove and replace existing structure(s) to restore area drainage by installing drain pipe, catch basins, and sod as specified along Forest Dr (R04D037); located in Mandeville, Louisiana.
11/20/2025 08:00 PM UTC
25-63-1
Oak Harbor Blvd Drainage -------------------The Parish requests a contractor to improve drainage along Oak Harbor Blvd (R09J090) in Slidell, Louisiana, by removing and replacing concrete panels and rollover barrier curbs, as well as resealing catch basins, as required in the specifications.
11/25/2025 08:00 PM UTC
25-60-1
N Lake Washington Ct.-------------------------------The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by rebuilding catch basins as specified along N Lake Washington Ct (R08L040), located in Slidell, Louisiana.
12/03/2025 08:00 PM UTC
25-61-1
STP Pond & Barn Facility Maintenance - The Parish requests a Contractor to construct (6) metal roof covers/lean-tos, with or without access panels, and two (2) concrete slabs, with and without catch basins for the St. Tammany Parish Brewster Maintenance Barn, Bush Maintenance Barn, Haas Road Pond, and Lenwood Drive Pond as required in the specifications.
12/03/2025 08:00 PM UTC
25-62-1
Koop Drive Armed Security Guard Services--------------------The purpose of this Essential Service Quote is to establish a contract for Licensed Armed Security Guard Services for St. Tammany Parish Government (Parish) for a period beginning January 1, 2026 through December 31, 2026.
12/03/2025 08:00 PM UTC
25-65-1
Traffic Calming Program Military Rd PH. 1-------------------------------- The Parish requests a contractor to implement traffic calming improvements by installing asphaltic concrete speed tables, updating related pavement markings and signage within the Cross Gates Subdivision in Slidell, LA. The work is intended to reduce vehicle speeds, enhance safety, and improve roadway visibility through new striping, arrows, advisory signs, and refreshed stop bars, with an additional alternate location included in the Magnolia Forest Subdivision in Pearl River, LA.
12/04/2025 08:00 PM UTC
25-64-1
STP Jail Lawn Maintenance-----------------------------------St. Tammany Parish Government Department of Facilities Management is seeking a Provider to provide landscape maintenance services at the St. Tammany Parish Jail, located at 1200 Champagne Street, Covington, LA 70433.
12/09/2025 08:00 PM UTC
25-34-2
Rousseau Rd. Over Soap & Tallow Branch---------------------------- The project consists of the removal of the existing bridge and the phased construction of a new bridge structure along Rousseau Road crossing Soap and Tallow Branch.
12/11/2025 08:00 PM UTC
25-35-2
Dr. TJ Smith Sr Expy Improvements----------------------------------The work specified in this project will require the contractor to provide labor, equipment, and materials necessary to improve the roadway surface along Dr TJ Smith Sr Expressway
12/11/2025 08:00 PM UTC
25-37-2
Woodridge Blvd, English Oaks Dr & Black River Estates------------------------------Work to include a 1” mill and 2” overlay with stop bar striping for Woodridge Blvd (R04C004), a 1” mill and 2” overlay with stop bar striping and pavement patching for English Oaks Dr (R01I058), and speed tables in Black River Estates along Black River Dr (R01J042) and Hawthorne Hollow (R01J041). All work being performed is to improve safety and driving conditions for motorists.
12/11/2025 08:00 PM UTC
14 Solicitations

Closed Solicitations

Number Deadline
23-47-1
Leonelle Circle & Bard Circle Drainage Repair----Contractor must provide all labor, materials, tools, and equipment to remove/ replace and/ or repair concrete sidewalk, concrete curbing and CB-06 at Leonelle Circle (R08I065; S25-T8-R14) in Slidell, and reseal pipe joints, remove/ replace concrete road panels and sidewalks at Bard Circle (R08I050; S25- T8-R14) located in Slidell, Louisiana as specified. The time period of completion is forty-five (45) days from the issuance of the Notice to Proceed by the Parish. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a wellknown technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded. If the contractor has not done business with the Parish, the contractor should submit a W-9 with their response.
11/01/2023 07:00 PM UTC
23-46-1
Place St. Charles & Place St. Germain Sinkhole Repairs----------------------------The Parish requires a Contractor to excavate around existing pipe and reseal the exterior of the pipe joint at Place St. Charles (R01E020; S47-T7-R11),and at Place St. Germain (R01E030; S47- T7-R10) in Covington, Louisiana.
11/01/2023 07:00 PM UTC
23-48-1
Kingspoint Blvd------------------------------------------------------------------------------------The Parish requires a Contractor to remove/replace concrete sidewalk panels on Kingspoint Blvd (R08V019; S13-T9-R14) in Slidell, Louisiana.
11/01/2023 07:00 PM UTC
23-39-2
Berry Todd Rd Bridge - The Contractor must provide all labor, equipment, materials, and tools necessary for the removal of concrete approach slabs and guard rail and installation of concrete approach slabs, and guard rail, as required per the construction drawings and specifications. The project location is Berry Todd Rd, Sections 43 and 39, Township 8, Range 13E in Lacombe, LA.
10/25/2023 07:00 PM UTC
23-42-1
Riverside Drive Drainage Repair ------ Contractor must provide all labor, materials, tools, supervision, and equipment to install sub-surface drainage with catch basins in order to prevent erosion in the roadside ditches at 71368 Riverside Drive (R03B002; S42-T7-R11) located in Covington, Louisiana as specified. Contractor shall provide all signage and barricades. The time period to complete the work shall be twenty (20) calendar days from Notice to Proceed issued by the Parish. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well-known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded. If the contractor has not done business with the Parish, the contractor should submit a W-9 with their response.
10/25/2023 07:00 PM UTC
23-37-2
2023 East District Panel Replacements--------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by removing/replacing and/or repairing concrete panels and concrete rollover/barrier curbs as specified along the following roads: -Ellwood Cir (R08I062) Section 25 Township 8S Range 14E Slidell; -Dockside Dr (R08F031) Section 38 Township 8S Range 15E Slidell; -Cedarwood Dr (R08M067) Section 38 Township 9S Range 15E Slidell; -Clipper Dr (R09J018) Section 44 Township 9S Range 14E Slidell; -Meadow Lake Dr East (R08M075) Section 12 Township 9S Range 14E Slidell; -Foxcroft St (R08V019) Section 13 Township 9S Range 14E Slidell.
10/24/2023 07:00 PM UTC
23-41-1
Installation of Fuel Tanks and Removal of the Existing Fuel Tanks at Department of Public Works Facilities--------To supply all equipment, materials, and labor to place two (2) five thousand (5,000) gallon above ground fuel tanks at each location with all required equipment to supply diesel fuel and unleaded gasoline for governmental equipment usage and remove one 500-gallon above ground gasoline and one 1000-gallon diesel storage tanks from each location.
10/24/2023 07:00 PM UTC
23-43-1
Lake Tahoe Panel and Catch Basin Repair--------------------------------------------------The Parish requires a Contractor to remove/replace road panels, clean and seal pipe joints, and catch basins, located at Lake Tahoe (R08L048; S31-T8-R15) in Slidell, Louisiana.
10/19/2023 07:00 PM UTC
23-3-2
Cross Gates Water System - New Elevated Storage Tanks------New elevated steel water storage tanks, controls, piping, site grading and drainage, electrical service, equipment, utility lines and other related items at the Willow Wood and Ozone Pines sites.
10/18/2023 07:00 PM UTC
23-38-2
2023 West District Panel Replacements-------------------------------------------------The Parish requires a Contractor to provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by removing/replacing and/or repairing concrete panels and concrete rollover/barrier curbs along various Parish Roads.
10/17/2023 07:00 PM UTC
241 - 250 of 917 Solicitations
1 2 21 22 23 25 27 28 29 91 92