25-46-1
Structure Demolition & Slab Removal----The Parish is seeking a Contractor for the demolition and debris removal of ten (10) single-family residential homes, along with associated improvements, located in Slidell, Louisiana 70461.
St. Tammany Parish Government has acquired certain properties located throughout the Parish as part of the Louisiana Watershed Initiative – St. Tammany Parish Buyout Grant Program. In accordance with federal grant requirements, properties purchased with federal funds through this program must be permanently restricted to open space, recreational, or wetlands management uses. To comply with these requirements and facilitate the return of these properties to a natural state, the Parish is soliciting quotes for demolition and debris removal services.
| 08/07/2025 07:00 PM UTC |
25-47-1
Canal St. Drainage Repair----The Parish requests a Contractor to improve and restore drainage by removing and replacing failed driveway culverts and installing catch basins along Canal St. (R08H015) in Slidell, Louisiana 70461.
| 08/07/2025 07:00 PM UTC |
25-24-2
DPW Asphalt Maintenance-------------------------The Contractor must provide all adequate and competent labor, equipment, tools,
testing, and materials necessary to improve roadways by reconstructing and/or milling and overlaying road surfaces as specified at the following locations:
- Idlewild Pines Rd (R09C036) Slidell, LA;
- Old Bayou Liberty Rd (R09H035) Slidell, LA;
- Preachers Oak Ln (R09G064) Slidell, LA;
- Robert Ln (R09G024) Slidell, LA;
- Terrell Dr (R09H005) Slidell, LA;
- Dorman King Rd (R05D020) Bush, LA;
- Lake St (R10F034) Abita Springs, LA;
- Branch Crossing Dr (R03H018) Covington, LA;
- Camellia Dr (R03K084) Covington, LA;
- Adolphus Rd South (R02Q011) Covington, LA;
- Green Leaf Ln (R02P033) Covington, LA;
- 8th St (R09I014) Slidell, LA;
- Emile St (R09D030) Slidell, LA;
- Joan Dr (R08A018) Pearl River, LA;
- Salmen Ave (R09I015) Slidell, LA;
- Slidell Ave (R09I011) Slidell, LA;
- Lohman Rd (R07C018) Lacombe, LA;
- St James St (R07G045) Lacombe, LA;
- N Woodlake Way (R08H036) Pearl River, LA;
- S Woodlake Way (R08H037) Pearl River, LA; and
- Tammany Trace (R11A001) Abita Springs, LA.
| 08/12/2025 07:00 PM UTC |
25-23-2
Justice Center Cooling Tower---------------------Contractor shall provide the necessary labor, supervision, equipment, tools, and materials
as required for the removal and replacement of the existing cooling tower located at the St.Tammany Justice Center, located at 701 N. Columbia St., Covington, LA 70433.
| 08/19/2025 07:00 PM UTC |
25-25-2
Hoover Drive & Lawes St. Improvements---------------The work specified in this project will require the contractor to provide labor, equipment, and materials necessary to improve the roadway surface by milling and overlaying approximately 3,900 linear feet of asphaltic concrete along Hoover Dr and approximately 1,970 linear feet of asphaltic concrete along Lawes St. The project will also include the installation of surbsurface drainage improvements, as well as radius improvements at the intersection of Hoover Dr and Lawes St, in addition to new striping and replacment of signage. This work, as specified in these documents and construction plans, is located along Hoover Dr (R08M007) Section 12-13, Township 9S, Range 14E, and Lawes St (R08M005) Section 12, Township 9S, Range 14E, Slidell, LA 70461.
| 08/20/2025 07:00 PM UTC |
25-26-2
One-Time Purchase of Electric Apparatus--------------------------------------St. Tammany Parish Government Department of Utilities is seeking bids for a one (1) time purchase of electrical apparatuses. All products shall be new, unused, and of current manufacture.
| 08/21/2025 07:00 PM UTC |
Number | Deadline |
---|---|
23-54-1
Fish Hatchery Road Drainage Repair----
Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to Remove/Replace existing cross drain pipe and roadway asphalt as specified along Fish Hatchery Road (R07E001) Section 6 Township 8S Range 13E located in Lacombe, Louisiana.
The time period for completion of the project is thirty (30) calendar days.
Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well-known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded.
If the contractor has not done business with the Parish, the contractor should submit a W-9 with their response.
| 11/16/2023 08:00 PM UTC |
23-53-1
Blackwell Drive---------------------------------------------------------------------The Parish requests a contractor for the turning radius to be widened and improved as specified on Blackwell Dr. (R04E021) at Louand Dr. (R04E18) Section 7 Township 8S Range 11E,Lacombe, LA. 70445.
| 11/15/2023 08:00 PM UTC |
23-50-1
Brookside Drive Drainage Improvements--------------------------------------------------------The Parish requires a Contractor to remove concrete walks and drives, remove pipe(storm drain), clean ditches, and concrete as specified on Brookside Drive (R04D035;S42-T8-R11) in Mandeville, Louisiana 70471.
| 11/15/2023 08:00 PM UTC |
23-49-1
Cherry Laurel Drainage/Curb Repair----Contractor must provide all labor, materials, tools, supervision, and equipment to remove/replace concrete driveway, curb and gutter specified on Cherry Laurel (R04A032; S37-T7-R11) located in Covington, Louisiana.
The time period of completion is thirty (30) days from the issuance of the Notice to Proceed by the Parish.
Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well-known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded.
If the contractor has not done business with the Parish, the contractor should submit a W-9 with their response.
| 11/14/2023 08:00 PM UTC |
23-21-2
Safe Haven Water Utility Improvements----The work of this contract comprises the rehabilitation and upgrade to two existing water well facilities (PWS ID 1103039), including, but not limited to, demolition and replacement of the existing chemical buildings, new chemical feed skids, new electrical service and components, new control panels, and a new well pump and piping improvements at Well #1.
| 11/08/2023 08:00 PM UTC |
23-41-1
Installation of Fuel Tanks and Removal of the Existing Fuel Tanks at Department of Public Works Facilities--------To supply all equipment, materials, and labor to place two (2) five thousand (5,000) gallon above ground fuel tanks at each location with all required equipment to supply diesel fuel and unleaded gasoline for governmental equipment usage. Requirements:
•Submit all fire marshal paperwork for the scope of work for the project.
•Form up a properly sized concrete footing for tank saddlers with welded anchoring.
•Install bollards for each tank that is properly sized and meets all regulations.
•Pour tank pad and bollards with four thousand (4,000) PSI ready mix concrete.
•Supply and install two (2) five thousand (5,000) gallon cylinder Fireguard UL2085, or equal, above ground fuel tank with all required fittings and piping from the fuel tank to the fuel delivery system or approved equal per location.
If not biding as specified, specify Make/Model: __________________________________
•Properly ground the fuel tank
•Supply and install split containment and overfill protection.
•Supply and install a Green Leaf Gauge, or equal, level gauge.
If not biding as specified, specify Make/Model: __________________________________
•Install a cap to manually test the fuel level.
•Supply an atmospheric vent cap to meet regulations.
•Connect and modify to existing fuel delivery system for complete/functional installation comparable with Petrovend software that communicates with Phoenix fuel system.
•All waste/debris will be removed from the site and disposed of properly by the completion of the job.
•All work should be Monday thru Friday between 7 am and 3 pm unless prior approval from DPW Director.
•All equipment shall have a minimum one (1) year manufacturer’s warranty. Workmanship shall be covered by a one (1) year warranty for all installation work.
This project time will be for ninety (90) calendar days.
| 11/02/2023 07:00 PM UTC |
23-4-2
Cross Gates Water System Well Improvements------New water well, controls, control building, generator, fencing, electrical service, equipment, utility lines, and various related items at the Ozone Pines site. Well improvements, new controls, control building, generator, equipment, utility lines, and related items at the Willow Wood site.
| 11/01/2023 07:00 PM UTC |
23-45-1
Foxbriar Street Drainage Repair------Contractor must provide all labor, materials, tools, supervision, and equipment to remove/replace existing concrete sidewalk, panels and wrap pipe joints due to base failures as specified on Foxbriar Street (R08V020; S13-T9-R14) located in Slidell, Louisiana.
The time period to complete the work shall be forty-five (45) calendar days from issuance of the Notice to Proceed issued by the Parish.
Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well-known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded.
If the contractor has not done business with the Parish, the contractor should submit a W-9 with their response.
| 11/01/2023 07:00 PM UTC |
23-47-1
Leonelle Circle & Bard Circle Drainage Repair----Contractor must provide all labor, materials, tools, and equipment to remove/ replace and/ or repair concrete sidewalk, concrete curbing and CB-06 at Leonelle Circle (R08I065; S25-T8-R14) in Slidell, and reseal pipe joints, remove/ replace concrete road panels and sidewalks at Bard Circle (R08I050; S25- T8-R14) located in Slidell, Louisiana as specified.
The time period of completion is forty-five (45) days from the issuance of the Notice to Proceed
by the Parish.
Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a wellknown technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded.
If the contractor has not done business with the Parish, the contractor should submit a W-9 with their response.
| 11/01/2023 07:00 PM UTC |
23-46-1
Place St. Charles & Place St. Germain Sinkhole Repairs----------------------------The Parish requires a Contractor to excavate around existing pipe and reseal the exterior of the pipe joint at Place St. Charles (R01E020; S47-T7-R11),and at Place St. Germain (R01E030; S47- T7-R10) in Covington, Louisiana.
| 11/01/2023 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.