St. Tammany Parish Government
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
25-33-2
Grand Ave-----------------------------------------Contractor shall provide all adequate and competent labor, equipment, and materials necessary to improve the roadway surface by milling and overlaying approximately 1,100 feet of asphaltic concrete. Approximately 650 feet of Grand Ave will be raised to an elevation of 2.5 feet, with the installation of 96 feet of
subsurface drainage and roadway striping for this section of roadway, located along Grand Ave (R07H029) Section 45, Township 9S, Range 13E.
| 11/18/2025 08:00 PM UTC |
|
25-59-1
Lamarque St Drainage----The Parish requests a Contractor to improve drainage by removing and replacing culverts and subsurface drainage pipes along Lamarque St., located in Mandeville, LA, as required in the
specifications.
| 11/19/2025 08:00 PM UTC |
|
25-32-2
Oak Park Drainage Improvements - Phase I ------------------------- The work shall consist of drainage improvements within the Oak Park Estates area. The work includes upgrading the existing roadway ditches and driveway culverts along Gale Street, Cheryl Street, Oak Park Road, and Helen Drive to ensure positive stormwater flow. Additionally, the work shall include drainage improvements along Brewster Road from Dominion Subdivision to Lateral 21-IWI-3.
| 11/20/2025 08:00 PM UTC |
|
25-57-1
Landscaping and Maintenance Service- Justice Center & Tyler Street---------------------------The Provider shall provide all supervision, labor, materials, supplies, and equipment as may be necessary to complete and provide landscape maintenance services for the St. Tammany Parish Justice Center Complex (JC) and the St. Tammany Parish Tyler Street Complex.
| 11/20/2025 08:00 PM UTC |
|
25-58-1
Forest Dr Drainage------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to remove and replace existing structure(s) to restore area drainage by installing drain pipe, catch basins, and sod as specified along Forest Dr (R04D037); located in Mandeville, Louisiana.
| 11/20/2025 08:00 PM UTC |
|
25-63-1
Oak Harbor Blvd Drainage -------------------The Parish requests a contractor to improve drainage along Oak Harbor Blvd (R09J090) in Slidell, Louisiana, by removing and replacing concrete panels and rollover barrier curbs, as well as resealing catch basins, as required in the specifications.
| 11/25/2025 08:00 PM UTC |
|
25-60-1
N Lake Washington Ct.-------------------------------The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by rebuilding catch basins as specified along N Lake Washington Ct (R08L040), located in Slidell, Louisiana.
| 12/03/2025 08:00 PM UTC |
|
25-61-1
STP Pond & Barn Facility Maintenance - The Parish requests a Contractor to construct (6) metal roof covers/lean-tos, with or without access panels, and two (2) concrete slabs, with and without catch basins for the St. Tammany Parish Brewster Maintenance Barn, Bush Maintenance Barn, Haas Road Pond, and Lenwood Drive Pond as required in the specifications.
| 12/03/2025 08:00 PM UTC |
|
25-62-1
Koop Drive Armed Security Guard Services--------------------The purpose of this Essential Service Quote is to establish a contract for Licensed Armed Security Guard Services for St. Tammany Parish Government (Parish) for a period beginning January 1, 2026 through December 31, 2026.
| 12/03/2025 08:00 PM UTC |
|
25-65-1
Traffic Calming Program Military Rd PH. 1--------------------------------
The Parish requests a contractor to implement traffic calming improvements by installing asphaltic
concrete speed tables, updating related pavement markings and signage within the Cross Gates
Subdivision in Slidell, LA. The work is intended to reduce vehicle speeds, enhance safety, and
improve roadway visibility through new striping, arrows, advisory signs, and refreshed stop bars,
with an additional alternate location included in the Magnolia Forest Subdivision in Pearl River,
LA.
| 12/04/2025 08:00 PM UTC |
|
25-64-1
STP Jail Lawn Maintenance-----------------------------------St. Tammany Parish Government Department of Facilities Management is seeking a Provider to provide landscape maintenance services at the St. Tammany Parish Jail, located at 1200 Champagne Street, Covington, LA 70433.
| 12/09/2025 08:00 PM UTC |
|
25-34-2
Rousseau Rd. Over Soap & Tallow Branch---------------------------- The project consists of the removal of the existing bridge and the phased construction of a new bridge structure along Rousseau Road crossing Soap and Tallow Branch.
| 12/11/2025 08:00 PM UTC |
|
25-35-2
Dr. TJ Smith Sr Expy Improvements----------------------------------The work specified in this project will require the contractor to provide labor, equipment, and materials necessary to improve the roadway surface along Dr TJ Smith Sr Expressway
| 12/11/2025 08:00 PM UTC |
|
25-37-2
Woodridge Blvd, English Oaks Dr & Black River Estates------------------------------Work to include a 1” mill and 2” overlay with stop bar striping for Woodridge Blvd (R04C004), a 1” mill and 2” overlay with stop bar striping and pavement patching for English Oaks Dr (R01I058), and speed tables in Black River Estates along Black River Dr (R01J042) and Hawthorne Hollow (R01J041). All work being performed is to improve safety and driving conditions for motorists.
| 12/11/2025 08:00 PM UTC |
| Number | Deadline |
|---|---|
|
24-6-1
Lake Sardis Dr. Drainage--------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to remove/replace driveway, clean, and seal pipe joints, along Lake Sardis Dr (R08L049) Section 31 Township 8S Range 15E located in Slidell, Louisiana.
The time period for completion of the project is thirty (30) calendar days.
Any work that may be reasonably inferred from the specifications or drawings as being required
to produce the intended result shall be supplied whether or not it is specifically called for. Work,
materials or equipment described herein which so applied to this project are covered by a well-known technical meaning or specification shall be deemed to be governed by such recognized
standards unless specifically excluded.
If the contractor has not done business with the Parish, the contractor should submit a W-9 with
their response.
| 03/20/2024 07:00 PM UTC |
|
23-40-2
Bedico Faubourg Water Main Fox Branch----The WORK comprises the construction of approximately 4,880 linear feet of water main interconnecting two existing water systems. The new water main will consist of open-cut 12” PVC pipe and directionally drilled 14” HDPE. No water service interruption will be allowed except for tie-ins, as directed by the Department of Utilities (DU). The new water main will be constructed using a combination of open cut and trench less construction.
| 03/20/2024 07:00 PM UTC |
|
24-2-1
Utilities Grass Cutting Services--------------------------------------------------The purpose of this Quote Request is to obtain proposals from qualified Proposers who are interested in providing grass cutting services for the St. Tammany Parish, Department of Utilities(DU).
| 03/05/2024 08:00 PM UTC |
|
24-2-2
Rousseau Rd Bridge Rehabilitation-------------------------------------------------------------The Contractor must provide all labor, equipment, materials, and tools necessary for the installation of a manufactured steel beam/frame.
| 02/29/2024 08:00 PM UTC |
|
24-4-1
Covington Library Exterior Renovations - Contractor must provide all labor, materials, tools, equipment, and permits for the exterior renovations for the St. Tammany Parish Library, Covington Branch located at 312 West 21st Avenue, Covington, Louisiana 70433 in accordance with plans and specifications. The scope includes new landscaping around the building, demolition and addition of sidewalks, subsurface drainage, removing old fence posts, and repairs to the concrete parking lot.
| 02/22/2024 08:00 PM UTC |
|
24-5-1
Trace Maintenance Barn - Contractor will remove old ceiling tile, grid, electrical lighting, ceiling and wooden mezzanine flooring.
Contractor will replace with new structurally sound lumber to correct sagging ceiling and reinstall lighting fixtures, ceiling grid and ceiling tile.
Contractor will remove and dispose of all construction/demo debris.
| 02/22/2024 08:00 PM UTC |
|
24-1-2
Safe Haven Water Utility Improvements------The work to be performed under this contract consists of furnishing and delivering all labor, materials, supervision, construction equipment, mechanical and electrical equipment not furnished by the St. Tammany Parish Department of Utilities, travel utilities, transportation, supplies, tools and services necessary for performing all work as specified in the Contract Documents, plus whatever work may be added as extra work under the provisions stated elsewhere in these documents.
| 02/15/2024 08:00 PM UTC |
|
23-56-2
Bigner Rd Turn Lane------The work specified in this project will require the contractor to provide labor, equipment, and material necessary to improve the roadway surface by milling and overlaying approximately 300 feet of asphaltic concrete and installing roadway striping. The intersection of Bigner Rd and State Highway 22 will undergo widening for the addition of a right-hand turn lane, as well as the movement of drainage on the east side of the widened road, as specified along Bigner Rd (R04C017) Section 54 Township 7 Range 11E.
| 02/08/2024 08:00 PM UTC |
|
24-1-1
Biosolids Transport and Disposal---------------------------------------------------------The Department of Utilities (DU) is solicitating quotes from those who are interested in providing Biosolids Transport and Disposal services including but not limited to; providing roll-off containers, transportation and disposal of non-hazardous biosolids generated from the Parish’s Wastewater Treatment Plant (WWTP) facilities .
| 02/07/2024 08:00 PM UTC |
|
23-54-2
2023 District 12, 13, 14 Supplemental------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and/or overlaying and patching road surfaces as specified along the following Parish roads:
* Garden Dr (R09G051) Section 38 Township 9S Range 14E Slidell;
* Jefferson Ave (R09G015) Section 38 Township 9S Range 14E Slidell;
* Middle Pearl Dr (R08P010) Section 15 Township 9S Range 15E Slidell;
* Possum Hollow Rd (R08U001) Section 11 Township 9S Range 14E Slidell;
* Dr. TJ Smith Senior Mem Pkwy (R09I168) Section 30 Township 8S Range
14E Slidell.
The Parish reserves the right to add, remove or otherwise modify the above, as
determined necessary by the Parish and as allowed by law.
| 01/25/2024 08:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.