General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-46-1
Structure Demolition & Slab Removal----The Parish is seeking a Contractor for the demolition and debris removal of ten (10) single-family residential homes, along with associated improvements, located in Slidell, Louisiana 70461. St. Tammany Parish Government has acquired certain properties located throughout the Parish as part of the Louisiana Watershed Initiative – St. Tammany Parish Buyout Grant Program. In accordance with federal grant requirements, properties purchased with federal funds through this program must be permanently restricted to open space, recreational, or wetlands management uses. To comply with these requirements and facilitate the return of these properties to a natural state, the Parish is soliciting quotes for demolition and debris removal services.
08/07/2025 07:00 PM UTC
25-47-1
Canal St. Drainage Repair----The Parish requests a Contractor to improve and restore drainage by removing and replacing failed driveway culverts and installing catch basins along Canal St. (R08H015) in Slidell, Louisiana 70461.
08/07/2025 07:00 PM UTC
25-24-2
DPW Asphalt Maintenance-------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing and/or milling and overlaying road surfaces as specified at the following locations: - Idlewild Pines Rd (R09C036) Slidell, LA; - Old Bayou Liberty Rd (R09H035) Slidell, LA; - Preachers Oak Ln (R09G064) Slidell, LA; - Robert Ln (R09G024) Slidell, LA; - Terrell Dr (R09H005) Slidell, LA; - Dorman King Rd (R05D020) Bush, LA; - Lake St (R10F034) Abita Springs, LA; - Branch Crossing Dr (R03H018) Covington, LA; - Camellia Dr (R03K084) Covington, LA; - Adolphus Rd South (R02Q011) Covington, LA; - Green Leaf Ln (R02P033) Covington, LA; - 8th St (R09I014) Slidell, LA; - Emile St (R09D030) Slidell, LA; - Joan Dr (R08A018) Pearl River, LA; - Salmen Ave (R09I015) Slidell, LA; - Slidell Ave (R09I011) Slidell, LA; - Lohman Rd (R07C018) Lacombe, LA; - St James St (R07G045) Lacombe, LA; - N Woodlake Way (R08H036) Pearl River, LA; - S Woodlake Way (R08H037) Pearl River, LA; and - Tammany Trace (R11A001) Abita Springs, LA.
08/12/2025 07:00 PM UTC
25-23-2
Justice Center Cooling Tower---------------------Contractor shall provide the necessary labor, supervision, equipment, tools, and materials as required for the removal and replacement of the existing cooling tower located at the St.Tammany Justice Center, located at 701 N. Columbia St., Covington, LA 70433.
08/19/2025 07:00 PM UTC
25-25-2
Hoover Drive & Lawes St. Improvements---------------The work specified in this project will require the contractor to provide labor, equipment, and materials necessary to improve the roadway surface by milling and overlaying approximately 3,900 linear feet of asphaltic concrete along Hoover Dr and approximately 1,970 linear feet of asphaltic concrete along Lawes St. The project will also include the installation of surbsurface drainage improvements, as well as radius improvements at the intersection of Hoover Dr and Lawes St, in addition to new striping and replacment of signage. This work, as specified in these documents and construction plans, is located along Hoover Dr (R08M007) Section 12-13, Township 9S, Range 14E, and Lawes St (R08M005) Section 12, Township 9S, Range 14E, Slidell, LA 70461.
08/20/2025 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
23-35-2
Pearl River Diversion Canal Restoration------------------------------------------------The work for this project comprises the dredging of the Pearl River Diversion Canal beginning at the intersection with the W. Pearl River and heading upstream within the canal approximately 1,500 feet.
10/11/2023 07:00 PM UTC
23-37-1
Rue Piper Drainage - The Parish requires a Contractor to install catch basins, pipe and rip rap to fix erosion issues at Rue Piper (R08M041; S7-T9-R15) in Slidell, Louisiana.
10/05/2023 07:00 PM UTC
23-39-1
Paradise Court Drainage Repair-----------------------------------------------------------The Parish requires a Contractor to remove/replace culverts that are failing, rotten and causing sinkholes, as well as concrete driveways, to improve drainage located at 216 Paradise Court (R04D154; S27-T7-R11) in Mandeville, Louisiana.
10/04/2023 07:00 PM UTC
23-40-1
Houmas Ct. Drainage---------------------------------------------------------------------The Parish requires a Contractor to remove/replace side drain pipe and remove/replace concrete driveway to improve drainage at 108 Houmas Court (R08E020; S19-T8-R15) in Pearl River, Louisiana 70452
10/04/2023 07:00 PM UTC
23-30-2
Safe Haven Entrance Improvements----------The work of this contract comprises the removal of the existing concrete pavement entrance and replacement with pervious pavement and underdrain system, replacement of driveway culvert, installation of new monument signs/lighting, installation of new landscaping/irrigation and bioswale and restoration of existing brick wall fencing.
10/03/2023 07:00 PM UTC
23-34-2
53 Bleu Lake Drive, Birch Drive, and Pine Drive Drainage----The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve remove, and replace existing cross drain pipes, headwalls, and roadway asphalt along 53 Bleu Lake Drive located in Covington, LA (R02V006) Section 10 Township 5S Range 11E; Birch Drive located in Folsom, LA (R02K026) Section 21 Township 5S Range 10E; and Pine Drive located in Folsom, LA (R02K018) Section 22 Township 5S Range 10E. The Parish reserves the right to add, remove, or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time period for completion of the project is ninety (90) calendar days from the issuance of the Notice to Proceed (NTP) by the Parish
10/03/2023 07:00 PM UTC
23-34-1
16th Section Road Drainage-------Contractor must provide all labor, materials, tools, and equipment to remove and replace existing storm drain pipes, catch basins and driveways to improve drainage at 16th Section Road (R06H017; S9-T7-R14) located in Pearl River, Louisiana as specified. Contractor shall provide all signage and barricades. The time period to complete the work shall be thirty (30) calendar days from issuance of the Notice to Proceed by the Parish. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded.
09/28/2023 07:00 PM UTC
23-36-1
Goldenwood Drainage Repairs - Contractor must provide all labor, materials, tools, and equipment to remove/replace and/or Repair concrete panels, concrete driveway and CB-06 (R08M061; S38-T9-R15) in Slidell, Louisiana. Contractor shall provide all signage and barricades.
09/26/2023 07:00 PM UTC
23-32-1
Turnwood Dr & Kelly Dr Pipe Liner---------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by repairing sinkholes and repairing the eroded pipe located at 503 Turnwood Drive (R03L155) Section 10 Township 7S Range 11E in Covington, Louisiana; 113 Kelly Drive (R08I005) Section 25 Township 8S Range 14E in Slidell, Louisiana. The time period for completion of the project is sixty (60) calendar days from issuance of the NTP by the Parish. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a wellknown technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded.
09/21/2023 07:00 PM UTC
23-33-1
Acadian Cir & Charles Dr. Drainage Repair-------------------------------------------The Parish requires a Contractor to remove and replace existing storm drain pipes, catch basins, and driveways, to improve drainage at Acadian Cir. (R09E051; S39-T9-R13), and Charles Dr. (R09G041; S38- T9-R14) in Slidell, Louisiana.
09/21/2023 07:00 PM UTC
231 - 240 of 895 Solicitations
1 2 20 21 22 24 26 27 28 89 90