General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-34-2
Ben Thomas Rd Signal----------------------------Installation of span wire traffic signals, including new electrical service, concrete foundations, steel poles, and necessary equipment.
07/15/2026 07:00 PM UTC
26-20-1
Lafitte St Drainage---------------------------------------The Parish requests a Contractor to improve drainage by removing and replacing the existing structure(s), subsurface drainage pipe, catch basin, sod, concrete driveways, and driveway aprons as specified along Lafitte St (R04D050) located in Mandeville, LA.
07/16/2026 07:00 PM UTC
26-19-1
Traffic Calming Program - Red Gap & Northern Homes------------------------------The work specified in this project will require the contractor to provide labor, equipment, and materials necessary to implement traffic calming solutions by way of asphaltic concrete speed tables, in addition to striping and respective speed table striping in on several residential streets in Red Gap & Northern Homes Subdivisions, Mandeville, La. This work, as specified in these documents and construction plans, is located along Soell Dr (R03L011), Hunt Dr (R03L012), Parker Dr (R03L014), Mire Dr (R03L016), 11th Ave (R03L013), Helenbirg Rd (R03L001), 6th Ave (R03L005), Lincoln St (R03L025), and North St (R03L026) Sections 11-14, Township 7S Range 11E.
07/16/2026 07:00 PM UTC
26-21-1
Lacombe Turning Radii Improvements___ The Parish requests a contractor to improve turning radii by installing drain pipes, catch basins, patching and shoulder materials as specified along Charlotte St (R07E044) Lacombe ; N. 25th St (R07E030) Lacombe ; Cloverland Dr (R07E040) Lacombe ; N. 8th St (R07E002) Lacombe, Louisiana.
07/16/2026 07:00 PM UTC
26-35-2
LA-22 Beautification Project -----------------------Work to consist of the removal of dead plantings, underbrush, trees, stumps, etc as indicated on the Drawings. The clearing of underbrush and planting of the new landscape materials shall also be performed as indicated on the Drawings. The project shall be broken out into a Base Bid, Alternate No. 1 and Alternate No. 2 as indicated on the Drawings
07/28/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
24-37-1
Arrow Wood Pond Drainage ---- The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to install pond valves, backfill and fencing at the Arrow Wood Pond lateral (D03LW01154) Section 1 Township 7S Range 11E located in Abita Springs, LA, as per the specifications. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time period for completion of the project is twenty-one (21) calendar days from the issuance of the Notice to Proceed (NTP) issued by the Parish. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a wellknown technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded. If the contractor has not done business with the Parish, the contractor should submit a W-9 with their response.
08/14/2024 07:00 PM UTC
24-29-2
Davis Canal Restoration----------------------------------------------------Dredging and sheet pile installation at the Davis Landing Canal at the intersection of the West Pearl River in Pearl River, Louisiana.
08/13/2024 07:00 PM UTC
24-30-1
Snead Dr Panels------------------------------------------------------------The Parish requests a contractor to remove, replace and/or repair concrete panels and concrete rollover/barrier curbs, along Snead Dr (R06O017) Section 25 Township 6S Range 12E; Abita Springs, Louisiana.
08/13/2024 07:00 PM UTC
24-26-1
Steele Rd Drainage------ The Parish requires a Contractor to install new subsurface pipe to improve drainage, on Steele Rd (D08NW01012; S38-T9S-R15E) located in Slidell, Louisiana.
08/13/2024 07:00 PM UTC
24-31-1
Toulouse St. - The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to repair sinkholes and eroded pipe, along Toulouse St (R08H016) Section 36 Township 8S Range 14E Slidell, Louisiana.
08/07/2024 07:00 PM UTC
24-33-1
River Rd Drainage ------ The Parish requests a contractor to improve drainage by installing a catch basin and sub-surface drainage located at River Rd (R03H001) Section 17 Township 6S Range 11E; Covington, Louisiana.
08/07/2024 07:00 PM UTC
24-25-2
24-26-2 - Moonraker Dr Drainage --------- All labor and materials necessary to line existing 18” and 24”culverts with Cured in Place Pipe (CIPP). Work shall occur at the locations noted on the attached drawings. All work shall be done in accordance with the manufacturer’s installation procedures and recommendations. All debris shall be removed at no direct pay The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time period for completion of work is one hundred twenty (120) calendar days from the issuance of Notice to Proceed (NTP) by the Parish.
08/06/2024 07:00 PM UTC
24-24-1
Library People Counter Devices - Provide and install Library people counter devices in 12 locations to eliminate the need for manual counts.
08/06/2024 07:00 PM UTC
24-27-1
Holiday Sq Blvd / Falconer Dr Panel Replacements ---- The Parish requests a contractor to improve the roadway by removing/replacing/repairing concrete panels and curbs located at Holiday Square Blvd (R03A032) Section 15 Township 7S Range 11E; and Falconer Dr (R03L161) Section 15 Township 7S Range 11E, located in Covington, Louisiana.
08/06/2024 07:00 PM UTC
24-27-2
Post Oak Sewer Consolidation & Faubourg Lift Station Improvements------------------The contractor shall provide all labor, equipment, tools, testing, and material necessary to complete the work in accordance with the construction drawings and project specifications for the Post Oak Sewer Consolidation & Faubourg Lift Station Improvements, Madisonville, Louisiana
08/01/2024 07:00 PM UTC
221 - 230 of 981 Solicitations
1 2 19 20 21 23 25 26 27 98 99