St. Tammany Parish Government
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
25-18-2
Northshore Circle and Lakeview Dr. Improvements---------------The Contractor shall provide labor, equipment, and materials necessary to complete the work in accordance with the construction drawings and project specifications for the Northshore Circle and Lakview Dr. Improvements project, located along Northshore Circle, Section 31-32, Township 9S, Range 14E and Lakeview Dr., Section 31-32-33, Township 9S, Range 14E, Slidell, LA.
| 06/24/2025 07:00 PM UTC |
25-39-1
Wilkinson St Drainage-------------------------The Parish requests a Contractor to restore area drainage by installing/replacing drain pipe, catch basins, and sod at several locations alone Wilkinson St., (R04D041);
Mandeville, Louisiana, 70448.
| 06/25/2025 07:00 PM UTC |
25-19-2
St. John Church Rd Bridge----------------------------The Contractor must provide all labor, equipment, tools, testing, and materials necessary to complete the work as required in the construction drawings and specifications, located on St. John Church Rd (B02G002), Section 7, Township 5S, Range 10E, Folsom, LA.
| 07/01/2025 07:00 PM UTC |
25-41-1
Terra Bella Curb Repair----The Parish requests a Contractor to perform roadway improvements by removing and replacing sections of concrete barrier curbs as specified along Inglewood Terrace (R01C059), Covington, LA; Bocage Ct (R01C039), Covington, LA; Melrose Ave (R01C042), Covington, LA.
| 07/02/2025 07:00 PM UTC |
25-40-1
Sludge Removal from Cross Gates #1----St. Tammany Parish, Department of Utilities (DU) requests a contractor for the removal of sludge, sand, and waste material from the Cross Gates #1 treatment plant, located at 350 N. Military Rd, Slidell, LA.
| 07/02/2025 07:00 PM UTC |
25-16-2
Camp Salmen Historic Lodge restoration----------------Historic restoration of the Camp Salmen Lodge building will include hazardous material abatement, masonry and plaster repair and restoration, door and window restoration and replacement, interior material restoration and replacement, wood roof framing code retrofit, and new roofing system.
| 07/08/2025 07:00 PM UTC |
25-22-2
Brewster Area Road Maintenance----The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to perform roadway improvements. Work shall include milling, overlaying, and patching of road surfaces as specified along:
− Bocage Ct (R01C039) Covington;
− Fayedaye St (R01I048) Madisonville;
− Melrose Ave (R01C042) Covington; and
− Spring Haven Ln (R01J098) Madisonville.
| 07/09/2025 07:00 PM UTC |
25-20-2
St Tammany Parish Fishing Pier---------------------------Removal of damaged timber fishing pier, and the construction of new “hardened”
fishing pier, including steel framing, steel decking, and steel piles. Work also includes lighting, a dry pipe sprinkler system, and other amenities.
| 07/23/2025 07:00 PM UTC |
Number | Deadline |
---|---|
23-40-1
Houmas Ct. Drainage---------------------------------------------------------------------The Parish requires a Contractor to remove/replace side drain pipe and remove/replace concrete driveway to improve drainage at 108 Houmas Court (R08E020; S19-T8-R15) in Pearl River, Louisiana 70452
| 10/04/2023 07:00 PM UTC |
23-30-2
Safe Haven Entrance Improvements----------The work of this contract comprises the removal of the existing concrete pavement entrance and replacement with pervious pavement and underdrain system, replacement of driveway culvert, installation of new monument signs/lighting, installation of new landscaping/irrigation and bioswale and restoration of existing brick wall fencing.
| 10/03/2023 07:00 PM UTC |
23-34-2
53 Bleu Lake Drive, Birch Drive, and Pine Drive Drainage----The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve remove, and replace existing cross drain pipes, headwalls, and roadway asphalt along 53 Bleu Lake Drive located in Covington, LA (R02V006) Section 10 Township 5S Range 11E; Birch Drive located in Folsom, LA (R02K026) Section 21 Township 5S Range 10E; and Pine Drive located in Folsom, LA (R02K018) Section 22 Township 5S Range 10E.
The Parish reserves the right to add, remove, or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
The time period for completion of the project is ninety (90) calendar days from the issuance of the Notice to Proceed (NTP) by the Parish
| 10/03/2023 07:00 PM UTC |
23-34-1
16th Section Road Drainage-------Contractor must provide all labor, materials, tools, and equipment to remove and replace existing storm drain pipes, catch basins and driveways to improve drainage at 16th Section Road (R06H017; S9-T7-R14) located in Pearl River, Louisiana as specified.
Contractor shall provide all signage and barricades.
The time period to complete the work shall be thirty (30) calendar days from issuance of the Notice to Proceed by the Parish.
Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded.
| 09/28/2023 07:00 PM UTC |
23-36-1
Goldenwood Drainage Repairs - Contractor must provide all labor, materials, tools, and equipment to remove/replace and/or Repair concrete panels, concrete driveway and CB-06 (R08M061; S38-T9-R15) in Slidell, Louisiana.
Contractor shall provide all signage and barricades.
| 09/26/2023 07:00 PM UTC |
23-32-1
Turnwood Dr & Kelly Dr Pipe Liner---------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by repairing sinkholes and repairing the eroded pipe located at 503 Turnwood Drive (R03L155) Section 10 Township 7S Range 11E in Covington, Louisiana; 113 Kelly Drive (R08I005) Section 25 Township 8S Range 14E in Slidell, Louisiana.
The time period for completion of the project is sixty (60) calendar days from issuance of the NTP by the Parish.
Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a wellknown technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded.
| 09/21/2023 07:00 PM UTC |
23-33-1
Acadian Cir & Charles Dr. Drainage Repair-------------------------------------------The Parish requires a Contractor to remove and replace existing storm drain pipes, catch basins, and driveways, to improve drainage at Acadian Cir. (R09E051; S39-T9-R13), and Charles Dr. (R09G041; S38- T9-R14) in Slidell, Louisiana.
| 09/21/2023 07:00 PM UTC |
23-35-1
Dupard Street Drainage------------------------------------------------------------------The Parish requires a Contractor to remove and replace existing storm drain pipes, catch basins, and driveways, to improve drainage at Dupard Street (R04D168; S39-T8-R11) in Mandeville, Louisiana, 70448.
| 09/21/2023 07:00 PM UTC |
23-26-2
Covington Library Exterior Renovations -----Contractor must provide all labor, materials, tools, equipment, and permits for the exterior renovations for the St. Tammany Parish Library, Covington Branch.The scope includes new landscaping around the building, demolition and addition of sidewalks, subsurface drainage, removing old fence posts, and repairs to the concrete parking lot.
| 09/14/2023 07:00 PM UTC |
23-30-1
602 Lake Superior Drive Drainage Repair------Contractor must provide all labor, materials, tools, equipment and supervision necessary to reseal interior joints of the existing 60” subsurface pipe, backfill, remove and reinstall 6’ wooden fence, and slab sodding located at 602 Lake Superior Drive (R08L047; S31-T8S-R15E) in Slidell, Louisiana.
The time period for completion of the project is thirty (30) calendar days.
Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a wellknown technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded.
If the contractor has not done business with the Parish, the contractor should submit a W-9 with their response.
| 08/31/2023 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.