General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8809PlanHolders02122026.pdf (91.3 KB)
Contract 8809 - South Charter Street Alley
9726PlanHolders02122026.pdf (92.9 KB)
Contract 9726 - Country Grove Singletrack Trail
9737PlanHolders02122026.pdf (84.4 KB)
Contract 9737 - 2026 Semi-Permanent Epoxy
9745PlanHolders02122026.pdf (87.7 KB)
Contract 9745 - MMB Flagpole Replacement
5 Documents

Upcoming Solicitations

Number Deadline
8809 - South Charter Street Alley Assessment District - 2026
The work under this contract shall include, but not be limited to, installation of storm sewer main and structures, excavation, base preparation, curb and gutter, driveway aprons, spot replacement of sidewalk, and asphalt pavement.
02/12/2026 08:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
02/26/2026 08:00 PM UTC
9745 - Madison Municipal Building Flagpole Replacement
This contract is for the removal of the existing flagpole in front of the Madison Municipal Building and the installation of two new flagpoles flanking the front entrance, located at 215 Martin Luther King Jr Blvd, Madison, WI.
02/26/2026 08:00 PM UTC
9737 - 2026 Semi-Permanent Epoxy Pavement Markings
This is an annual maintenance Epoxy Marking program to retrace/remark faded and worn out epoxy markings as needed for the entire City.
02/26/2026 08:00 PM UTC
9718 - Hoyt Park Lot Reconstruction
This project consists of the reconstruction of the asphalt parking lot at Hoyt Park. Work includes removing the existing curb and gutter and asphalt and rebuilding the lot per the contract's plans. Resurfacing and reconstruction of some of the asphalt park paths are included in the contract. This project also adds some concrete sidewalk and a bio retention basin to the site.
02/26/2026 08:00 PM UTC
9613 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,863 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
03/12/2026 07:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
7844 - South High Point Road Turn Lane at Velvet Leaf Drive
South High Point Road Turn Lane at Velvet Leaf Drive
03/24/2017 06:00 PM UTC
7813 - Sunset Courts Assessment District - 2017
Sunset Courts Assessment District - 2017
03/24/2017 06:00 PM UTC
7934 - Madison Municipal Building - Window Asbestos Removal
7934 - Madison Municipal Building - Window Asbestos Removal
03/15/2017 06:00 PM UTC
7906 - Annual Horizontal Sawcutting of Concrete Sidewalk and Incidental Work (District 17) - 2017
Annual Horizontal Sawcutting of Concrete Sidewalk and Incidental Work (District 17) - 2017
03/15/2017 06:00 PM UTC
7903 - Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb & Gutter Work Ordered (District 17) by the Common Council
Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb & Gutter Work Ordered (District 17) by the Common Council
03/15/2017 06:00 PM UTC
7907 - 2017 Parks Division Sun Shelters Installation
2017 Parks Division Sun Shelters Installation
03/10/2017 07:00 PM UTC
7889-Overture Center Garage Elevator Modernization
Overture Center Garage Elevator Modernization
02/24/2017 07:00 PM UTC
7500 - Unit Well 31 Water Treatment Plant
Unit Well 31 Water Treatment Plant
02/24/2017 07:00 PM UTC
7913 - Electrical Power and Lighting for Pole Shed
Electrical Power and Lighting for Pole Shed
02/24/2017 07:00 PM UTC
7911 - Storm Sewer and Trench Patching at West Transfer Station
Storm Sewer and Trench Patching at West Transfer Station
02/24/2017 07:00 PM UTC
661 - 670 of 1072 Solicitations
1 2 63 64 65 67 69 70 71 107 108