General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9593PlanHolders04012026.pdf (90 KB)
Contract 9593 - Pressure Zone 4 Crossing
9694PlanHolders04012026.pdf (90.3 KB)
Contract 9694 - Warner & Worthington Park Courts
9726PlanHolders04012026.pdf (97.4 KB)
Contract 9726 - Country Grove Singletrack Trail
9740PlanHolders04012026.pdf (96.7 KB)
Contract 9740 - Unit Well 12 Upgrade
9751PlanHolders04012026.pdf (86.4 KB)
Contract 9751 - 2026 Parking Garage Maintenance
9757PlanHolders04012026.pdf (88.3 KB)
Contract 9757 - Imagination Center Fiber
9766PlanHolders04012026.pdf (88.9 KB)
Contract 9766 - Metro Transit Kennedy Bus Charger
8 Documents

Upcoming Solicitations

Number Deadline
9740 - Unit Well 12 Upgrade
The project includes reconstruction of the existing Unit Well 12 Wellhouse and Reservoir.
04/02/2026 07:00 PM UTC
9593 - Pressure Zone 4 Interstate Crossing
Work under this contract generally consists of installing 6-inch, and 12-inch ductile iron water main, fittings, valves and hydrants by open-cut and/or horizontal directional drilling methods and installing 16-inch water main and fittings by horizontal directional drilling methods. The total water main installation comprises approximately 3600-LF of new pipe.
04/02/2026 07:00 PM UTC
9694 - Warner Park Pickleball Courts and Worthington Park Futsal Court
This project involves improvements to both Warner Park and Worthington Park. The improvements at Warner Park consist of removing existing sports light poles, removing pavement, installing asphalt pavement, installing fencing, gates, net posts and nets, sport court finishing and striping, installing a stormwater basin, and site restoration to construct an eight (8) court complex. The improvements at Worthington Park consist of removing pavement, pulverizing/shaping existing asphalt, installing new asphalt pavement, installing a Mini-Pitch system, sport court finishing and striping, replacing a storm sewer and lateral, installing a pavement storm sewer, and site restoration to construct one (1) futsal court.
04/02/2026 07:00 PM UTC
9757 - Imagination Center Fiber Connection
A new fiber connection between an existing splice point on corner of E Washington Ave and Thierer Rd, and the newly constructed Imagination Center at Reindahl Park facility at 1818 Portage Road. The new duct will be a single 3” duct with a single 48-strand fiber optic cable.
04/02/2026 07:00 PM UTC
9751 - 2026 Parking Garage Maintenance
This work covers repairs at the Capitol Square North (CSN), State Street Capitol (SSCo), South Livingston Street (SLS), and Wilson Street Garage (WSG) parking ramps in Madison, Wisconsin. Work includes concrete repair of slabs, columns, beams, sealant replacement at slab cracks and joints, membrane repair and replacement, grit-blasting and painting of reinforcing and architectural steel and/or concrete, repair of architectural components (brick, façade connections, masonry, etc.), installation of new or replacement concrete connections/anchors, welding of steel and demoing/installation of new or replacement concrete.
04/02/2026 07:00 PM UTC
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
04/23/2026 07:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
05/21/2026 07:00 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
8017 - Sheboygan Ave Water Main Replacement
8017 - Sheboygan Ave Water Main Replacement
07/07/2017 06:00 PM UTC
8016-MINERAL POINT ROAD - YELLOWSTONE DRIVE TRAFFIC SIGNAL ASSESSMENT DISTRICT
MINERAL POINT ROAD - YELLOWSTONE DRIVE TRAFFIC SIGNAL ASSESSMENT DISTRICT
07/07/2017 06:00 PM UTC
7973 - Colony Drive and South Gammon Road Traffic Signal Assessment District
7973 - Colony Drive and South Gammon Road Traffic Signal Assessment District
07/07/2017 06:00 PM UTC
7848 - West Wilson Street and South Henry Street Assessment District - 2017 and South Hamilton Street Resurfacing Asssessment District - 2017
West Wilson Street and South Henry Street Assessment District - 2017 and South Hamilton Street Resurfacing Assessment District - 2017
07/07/2017 06:00 PM UTC
7946 - Madison Municipal Building - Exterior Historic Window Painting
Madison Municipal Building - Exterior Historic Window Painting
06/16/2017 06:00 PM UTC
7726 - Police Department Midtown District
Police Department Midtown District
06/16/2017 06:00 PM UTC
7964 - Sheboygan Ave Water Main Replacement
7964 - Sheboygan Ave Water Main Replacement
06/16/2017 06:00 PM UTC
7959 - Park Paving 2017
7959 - Park Paving 2017
06/16/2017 06:00 PM UTC
7965 - CIPP Rehabilitation of Water Mains – 2017
7965 - CIPP Rehabilitation of Water Mains – 2017
06/16/2017 06:00 PM UTC
8008-Mineral Point Road - Yellowstone Drive Traffic Signal Assessment District
Mineral Point Road - Yellowstone Drive Traffic Signal Assessment District
06/16/2017 06:00 PM UTC
621 - 630 of 1082 Solicitations
1 2 59 60 61 63 65 66 67 108 109