General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8809PlanHolders02122026.pdf (91.3 KB)
Contract 8809 - South Charter Street Alley
9726PlanHolders02122026.pdf (92.9 KB)
Contract 9726 - Country Grove Singletrack Trail
9737PlanHolders02122026.pdf (84.4 KB)
Contract 9737 - 2026 Semi-Permanent Epoxy
9745PlanHolders02122026.pdf (87.7 KB)
Contract 9745 - MMB Flagpole Replacement
5 Documents

Upcoming Solicitations

Number Deadline
8809 - South Charter Street Alley Assessment District - 2026
The work under this contract shall include, but not be limited to, installation of storm sewer main and structures, excavation, base preparation, curb and gutter, driveway aprons, spot replacement of sidewalk, and asphalt pavement.
02/12/2026 08:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
02/26/2026 08:00 PM UTC
9745 - Madison Municipal Building Flagpole Replacement
This contract is for the removal of the existing flagpole in front of the Madison Municipal Building and the installation of two new flagpoles flanking the front entrance, located at 215 Martin Luther King Jr Blvd, Madison, WI.
02/26/2026 08:00 PM UTC
9737 - 2026 Semi-Permanent Epoxy Pavement Markings
This is an annual maintenance Epoxy Marking program to retrace/remark faded and worn out epoxy markings as needed for the entire City.
02/26/2026 08:00 PM UTC
9718 - Hoyt Park Lot Reconstruction
This project consists of the reconstruction of the asphalt parking lot at Hoyt Park. Work includes removing the existing curb and gutter and asphalt and rebuilding the lot per the contract's plans. Resurfacing and reconstruction of some of the asphalt park paths are included in the contract. This project also adds some concrete sidewalk and a bio retention basin to the site.
02/26/2026 08:00 PM UTC
9613 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,863 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
03/12/2026 07:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
7945 - Polymer Overlay of the Monona Terrace Bike Path
Polymer Overlay of the Monona Terrace Bike Path
04/21/2017 06:00 PM UTC
7850 - Yuma Drive Resurfacing Assessment District - 2017
Yuma Drive Resurfacing Assessment District - 2017
04/21/2017 06:00 PM UTC
7836 - Douglas Trail, Lamont Lane, Acacia Lane, Louden Lane, and Kvamme Lane Reconstruction Assessment District - 2017
Douglas Trail, Lamont Lane, Acacia Lane, Louden Lane, and Kvamme Lane Reconstruction Assessment District - 2017
04/21/2017 06:00 PM UTC
7956 - Utility Replacement with Resurfacing Assessment District - 2017
Utility Replacement with Resurfacing Assessment District - 2017
04/21/2017 06:00 PM UTC
7928 - 2017 Parking Garage Maintenance
2017 Parking Garage Maintenance
04/07/2017 06:00 PM UTC
7917 - Penn Park Shelter Renovation and Concession/Restroom Building
Penn Park Shelter Renovation and Concession/Restroom Building
04/07/2017 06:00 PM UTC
7927- 2017 Brittingham Park Accessible Playground
7927- 2017 Brittingham Park Accessible Playground
04/07/2017 06:00 PM UTC
7925- 2017 Park Playground Improvements - Group 1
7925- 2017 Park Playground Improvements - Group 1
04/07/2017 06:00 PM UTC
7902 - Sidewalk, Curb & Gutter and Concrete Pavement Patches, Citywide Installation and Repair - 2017
Sidewalk, Curb & Gutter and Concrete Pavement Patches, Citywide Installation and Repair - 2017
04/07/2017 06:00 PM UTC
7935 - Woods Road Resurfacing-2017
Woods Road Resurfacing-2017
04/07/2017 06:00 PM UTC
641 - 650 of 1072 Solicitations
1 2 61 62 63 65 67 68 69 107 108