General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8829PlanHolders05222026.pdf (84 KB)
Contract 8829 - Sidewalk Curb & Gutter 2026
8830PlanHolders05222026.pdf (88.2 KB)
Contract 8830 - Bridge Repairs - 2026
9787PlanHolders05222026.pdf (85.9 KB)
Contract 9787 - Newville Park Redevelopment
4 Documents

Upcoming Solicitations

Number Deadline
8830 - Bridge Repairs - 2026
The work under this contract shall include, but is not limited to concrete deck repairs, expansion joint replacement, expansion plate replacement, polymer overlay, guardrail installation, storm sewer pipe and structure installation, excavation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk, shared-use path installation, soil restoration, and pavement markings.
06/04/2026 07:00 PM UTC
8829 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2026
The Contractor shall perform work at various locations throughout the City, as ordered by the Common Council, or as directed by the Engineer. This work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the Contractor), Metro Transit bus pads, and other associated work. A list of approved locations and detail drawings are included with these Special Provisions. The list, however, is not a final list. Additional locations may be added.
06/04/2026 07:00 PM UTC
9787 - Newville (Kenneth) Park Redevelopment
This project consists of installation of new game equipment, benches, concrete paths, grading and preparation of landscape beds at Newville (Kenneth) Park.
06/11/2026 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
8000 - E. Gilman Street, N. Pinckney Street, and N. Butler Street Resurfacing with Utilities Assessment District - 2017
8000 - E. Gilman Street, N. Pinckney Street, and N. Butler Street Resurfacing with Utilities Assessment District - 2017
09/22/2017 06:00 PM UTC
7950 - Summit Maintenance Facility - Building Improvements
Summit Maintenance Facility - Building Improvements
09/08/2017 06:00 PM UTC
8024 - Park Edge/Park Ridge Employment Center
Park Edge/Park Ridge Employment Center
09/08/2017 06:00 PM UTC
8030 - Monona Terrace Exhibition Hall Flooring Resurfacing
Monona Terrace Exhibition Hall Flooring Resurfacing
08/25/2017 06:00 PM UTC
8033 - Fire Station 10 Storefront Replacement
8033 - Fire Station 10 Storefront Replacement
08/25/2017 06:00 PM UTC
8035 - Park Edge Drive Flood Mitigation
8035 - Park Edge Drive Flood Mitigation
08/18/2017 06:00 PM UTC
8032 - Olin Transfer Station Stormwater Improvement
8032 - Olin Transfer Station Stormwater Improvement
08/18/2017 06:00 PM UTC
7951 - Capitol East District Parking Structure
7951 - Capitol East District Parking Structure
08/11/2017 06:00 PM UTC
7979 - Monona Bay Shoreline Repairs
Monona Bay Shoreline Repairs
08/11/2017 06:00 PM UTC
7896 - Chippewa Drive Sidewalk Assessment District - 2017
Chippewa Drive Sidewalk Assessment District - 2017
08/11/2017 06:00 PM UTC
631 - 640 of 1107 Solicitations
1 2 60 61 62 64 66 67 68 110 111