General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8829PlanHolders05222026.pdf (84 KB)
Contract 8829 - Sidewalk Curb & Gutter 2026
8830PlanHolders05222026.pdf (88.2 KB)
Contract 8830 - Bridge Repairs - 2026
9787PlanHolders05222026.pdf (85.9 KB)
Contract 9787 - Newville Park Redevelopment
4 Documents

Upcoming Solicitations

Number Deadline
8830 - Bridge Repairs - 2026
The work under this contract shall include, but is not limited to concrete deck repairs, expansion joint replacement, expansion plate replacement, polymer overlay, guardrail installation, storm sewer pipe and structure installation, excavation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk, shared-use path installation, soil restoration, and pavement markings.
06/04/2026 07:00 PM UTC
8829 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2026
The Contractor shall perform work at various locations throughout the City, as ordered by the Common Council, or as directed by the Engineer. This work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the Contractor), Metro Transit bus pads, and other associated work. A list of approved locations and detail drawings are included with these Special Provisions. The list, however, is not a final list. Additional locations may be added.
06/04/2026 07:00 PM UTC
9787 - Newville (Kenneth) Park Redevelopment
This project consists of installation of new game equipment, benches, concrete paths, grading and preparation of landscape beds at Newville (Kenneth) Park.
06/11/2026 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
7333 - Fire Station #4 Patio Addition
Fire Station #4 Patio Addition Engineers Estimate: $165,000.00
08/22/2014 06:00 PM UTC
7352 (WD-391) - Aldo Leopold Park Shelter Installation
Aldo Leopold Park Shelter Installation FEDERALLY-FUNDED PROJECT WITH SPECIAL REQUIREMENTS Engineers Estimate: $32,000.00
08/22/2014 06:00 PM UTC
7200 - Warner Park Cunette Replacement
Warner Park Cunette Replacement Engineers Estimate: $498,816.00
08/22/2014 06:00 PM UTC
7291 - Lower Badger Mill Creek Sanitary Sewer Interceptor Phase 2
Lower Badger Mill Creek Sanitary Sewer Interceptor Phase 2; Engineers Estimate: 1,540,000.00
08/15/2014 06:00 PM UTC
7362 - 2014 Playground Improvements - Group 2
2014 Playground Improvements - Group 2; Engineer's Cost Estimate: $157,000
08/08/2014 06:00 PM UTC
7348 - East Washington Ave Median Replanting - 2014- South
East Washington Ave Median Replanting - 2014- South; Engineer's Estimate: $32,172
08/08/2014 06:00 PM UTC
7349 - East Washington Avenue Median Replanting - 2014 - North
East Washington Avenue Median Replanting - 2014 - North; Engineer's Estimate: $43,931
08/08/2014 06:00 PM UTC
7335 - Theresa Terrace Neighborhood Center
Theresa Terrace Neighborhood Center Engineers Estimate: 525,600.00
08/08/2014 06:00 PM UTC
7350 - Bowman Lighting System Phase Two
Bowman Lighting System Phase Two; Engineer's Cost Estimate: $424,350
08/08/2014 06:00 PM UTC
7369-Eastmorland Park Greenway
Eastmorland Park Greenway Engineers Estimate: $403375.50
07/25/2014 06:00 PM UTC
941 - 950 of 1107 Solicitations
1 2 91 92 93 95 97 98 99 110 111