General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8763PlanHolders06182025.pdf (89.9 KB)
Contract 8763 - Badger Rusk Path
8784PlanHolders06182025.pdf (91.4 KB)
Contract 8784 - E Main S Hancock
9612PlanHolders06182025.pdf (108 KB)
Contract 9612 - CIPP UVLining - Phase 1 2025
9626PlanHolders06182025.pdf (110 KB)
Contract 9626 - Mid Town Hydraulic Improvements
9654PlanHolders06182025.pdf (106 KB)
Contract 9654 - CIPP Thermal Lining - Phase 1
6 Documents

Upcoming Solicitations

Number Deadline
9654 - CIPP Thermal Lining Rehabilitation of Sewers Phase 1 - 2025 & Storm CIPP 2025
The work includes the trenchless rehabilitation of approximately 3,487 linear feet of sanitary sewer pipelines ranging in size from 6” to 8” diameter AND approximately 1,739 linear feet for storm sewer pipelines ranging in size from 12” to 36”.
06/20/2025 07:00 PM UTC
9612 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2025
The work includes the trenchless rehabilitation of approximately 10,046 linear feet of sanitary sewer pipelines ranging in size from 8” to 24” diameter AND approximately 120 linear feet for storm sewer pipelines ranging in size from 10” to 12”.
06/20/2025 07:00 PM UTC
9626 - Mid Town Hydraulic Improvements
This project consists of water main improvements on Mid Town Road, generally between Marty Road to South Gammon Road. The work includes furnishing and installing new 6-in and 12-inch ductile iron water main and fittings as shown on the plans. Adjusting new valve boxes and hydrants to appropriate grades.
06/20/2025 07:00 PM UTC
8784 - E MAIN STREET AND SOUTH HANCOCK STREET ASSESSMENT DISTRICT -2025
This project generally consists of replacement and installation of sanitary sewer pipes and structures, water main, storm sewer pipes and structures, and replacement of street infrastructure including curb and gutter, pavement, sidewalk, driveway aprons, and installation of tree support systems, rain gardens, pavement marking, and signing.
06/25/2025 07:00 PM UTC
8763 - Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District - 2025
Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District – 2025 is in the City of Madison. State Project Number 5992-02-29 (City Project Number 14143). This project includes the construction of an off-street shared-use path on the northerly side of W. Badger Rd and westerly side of N. Rusk Ave between the existing pedestrian overpass bridge on W. Badger Rd to Nygard St. It also includes partial reconstruction of W. Badger Rd and reconstruction of N. Rusk Ave within the same limits.
07/03/2025 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
7243 - North Henry Street and West Mifflin Street Assessment District-2014
North Henry Street and West Mifflin Street Assessment District-2014
03/07/2014 07:00 PM UTC
6999 - Oakridge Avenue, Ohio Avenue & Miller Avenue Resurfacing Assessment District-2013
Oakridge Avenue, Ohio Avenue & Miller Avenue Resurfacing Assessment District-2013
03/07/2014 07:00 PM UTC
7175 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2014
7175 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2014
03/07/2014 07:00 PM UTC
7264 - 2014 Park Division, Parking and Water Utility Landscaping
2014 Park Division, Parking and Water Utility Landscaping
02/21/2014 07:00 PM UTC
7259 - Elver and Reindahl Park Splash Pads
Elver and Reindahl Park Splash Pads
02/21/2014 07:00 PM UTC
7272 - Boulevard/ROW Landscaping 2013 - Phase 1
Boulevard/ROW Landscaping 2013 - Phase 1
02/21/2014 07:00 PM UTC
7280- Boulevard/ROW Landscaping 2013 - Phase 2
Boulevard/ROW Landscaping 2013 - Phase 2
02/21/2014 07:00 PM UTC
7255 - Annual Horizontal Sawcutting Concrete Sidewalk and Incidental Work (District 19) - 2014
Annual Horizontal Sawcutting Concrete Sidewalk and Incidental Work (District 19) - 2014
02/21/2014 07:00 PM UTC
7174 - Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb and Gutter Work Ordered (District 19) by the Common Council
Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb and Gutter Work Ordered (District 19) by the Common Council
02/21/2014 07:00 PM UTC
7239 - Chip Sealing 2014 - East
Chip Sealing 2014 - East
02/21/2014 07:00 PM UTC
951 - 960 of 1047 Solicitations
1 2 92 93 94 96 98 99 100 104 105