General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8562PlanHolders04142026.pdf (92.4 KB)
Contract 8562 - Pontiac Boston Nokomis Rosewood
8813PlanHolders04142026.pdf (90.1 KB)
Contract 8813 - Elmside, Sommers, Center Ave
8825PlanHolders04142026.pdf (86.9 KB)
Contract 8825 - Annual SW Construction D2,6
8827PlanHolders04142026.pdf (88.3 KB)
Contract 8827 - Annual HZ Sawcutting D2,6
9726PlanHolders04142026.pdf (97.8 KB)
Contract 9726 - Country Grove Singletrack Trail
9756PlanHolders04142026.pdf (90 KB)
Contract 9756 - Sherman/Shabazz Improvements
9766PlanHolders04142026.pdf (90.3 KB)
Contract 9766 - Metro Transit Kennedy Bus Charger
9780PlanHolders04142026.pdf (89.6 KB)
Contract 9780 - CIPP UV Lining Ph 1 2026
9 Documents

Upcoming Solicitations

Number Deadline
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
04/23/2026 07:00 PM UTC
9780 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,859 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
04/23/2026 07:00 PM UTC
9756 - Sherman/Shabazz Public Improvements
This project consists of water main improvements on Spohn Ave, from N Sherman Ave to Ruskin St located within an existing utility easement located at 1601 N Sherman Ave. The existing water main infrastructure in this area consists of 6-inch, and 10-inch sand cast iron pipe from the 1940’s.
04/23/2026 07:00 PM UTC
8562 - Pontiac Trial, Boston Court, Nokomis Court, and Rosewood Court - Assessment District 2025
The work under this contract shall include, but is not limited to, tree removal, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, asphalt pavement, pavement marking, replacement of sanitary sewer main and structures, and replacement of storm sewer main and structures.
04/23/2026 07:00 PM UTC
8813 - Elmside Boulevard, Sommers Avenue, and Center Avenue Assessment District - 2026
The work under this contract shall include, but is not limited to, replacement of sanitary sewer main and laterals; replacement of water main and reconnection of water services; replacement of storm sewer main, structures, and laterals; excavation; base preparation; installation of curb and gutter; driveway aprons; sidewalk spot repairs; asphalt pavement; pavement marking; and signing.
04/23/2026 07:00 PM UTC
8827 - Annual Horizontal Sawcutting Concrete Sidewalk and Incidental Work (Districts 2 and 6)
The Contractor shall perform repair work primarily throughout the 2nd and 6th Aldermanic Districts. A list of approved repair locations and an area map of Aldermanic District 2 and 6 has been provided within these Special Provisions for reference. The list, however, is not a final list. Additional locations may be added. Horizontal sawcut/grind locations have been marked in the field with a pink line and a white “C”. The Contractor shall horizontally sawcut/grind sidewalk to eliminate trip hazards at those locations designated by the Common Council, and as directed by the Engineer.
04/23/2026 07:00 PM UTC
8825 - Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb and Gutter Work Ordered (Districts 2 and 6)
The Contractor shall perform repair work primarily throughout Alder Districts 2 and 6. This work includes replacing defective sidewalk, curb and gutter, and sidewalk ramps, including truncated domes (supplied by the contractor), and associated work. A list of repair locations and an area map have been provided within these Special Provisions for reference.
04/23/2026 07:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
05/21/2026 07:00 PM UTC
8 Solicitations

Closed Solicitations

Number Deadline
7312 - Skate Park - Central Park, Madison
Skate Park - Central Park, Madison
06/06/2014 06:00 PM UTC
7251 - South Point Road Assessment District-2014
South Point Road Assessment District-2014
06/06/2014 06:00 PM UTC
7252 - Local Road Traffic Calming & Arterial Pedestrian Enhancements-2014
Local Road Traffic Calming & Arterial Pedestrian Enhancements-2014
06/06/2014 06:00 PM UTC
7277 - Park Paving - 2014
7277 - Park Paving - 2014
05/23/2014 06:00 PM UTC
7274 Breese Stevens Field Synthetic Turf-2014
Breese Stevens Field Synthetic Turf-2014
05/23/2014 06:00 PM UTC
7229 - Alley Reconstruction, Block 2 Wingra Park, Assessment District - 2014
Alley Reconstruction, Block 2 Wingra Park, Assessment District - 2014
05/23/2014 06:00 PM UTC
6831 - Yahara River Shoreline Repair and Olbrich Canoe Launch
Yahara River Shoreline Repair and Olbrich Canoe Launch
05/09/2014 06:00 PM UTC
7235 - Packers Avenue Sidewalk at Lakeland College Assessment District - 2014
Packers Avenue Sidewalk at Lakeland College Assessment District - 2014
05/09/2014 06:00 PM UTC
7002 - Stoughton Road/Voges Road Intersection Improvement Assessment District-2014
Stoughton Road/Voges Road Intersection Improvement Assessment District-2014
05/09/2014 06:00 PM UTC
7221 - Resurfacing 2014 - Pavement Milling & Asphalt Paving
7221 - Resurfacing 2014 - Pavement Milling & Asphalt Paving
05/09/2014 06:00 PM UTC
951 - 960 of 1087 Solicitations
1 2 92 93 94 96 98 99 100 108 109