General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8829PlanHolders05222026.pdf (84 KB)
Contract 8829 - Sidewalk Curb & Gutter 2026
8830PlanHolders05222026.pdf (88.2 KB)
Contract 8830 - Bridge Repairs - 2026
9787PlanHolders05222026.pdf (85.9 KB)
Contract 9787 - Newville Park Redevelopment
4 Documents

Upcoming Solicitations

Number Deadline
8830 - Bridge Repairs - 2026
The work under this contract shall include, but is not limited to concrete deck repairs, expansion joint replacement, expansion plate replacement, polymer overlay, guardrail installation, storm sewer pipe and structure installation, excavation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk, shared-use path installation, soil restoration, and pavement markings.
06/04/2026 07:00 PM UTC
8829 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2026
The Contractor shall perform work at various locations throughout the City, as ordered by the Common Council, or as directed by the Engineer. This work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the Contractor), Metro Transit bus pads, and other associated work. A list of approved locations and detail drawings are included with these Special Provisions. The list, however, is not a final list. Additional locations may be added.
06/04/2026 07:00 PM UTC
9787 - Newville (Kenneth) Park Redevelopment
This project consists of installation of new game equipment, benches, concrete paths, grading and preparation of landscape beds at Newville (Kenneth) Park.
06/11/2026 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
7230 - High Street Reconstruction Assessment District - 2014
High Street Reconstruction Assessment District - 2014; Engineer's Estimate: $240,000
06/27/2014 06:00 PM UTC
7320 Structural Rehabilitation of Water Main-2014 East
Structural Rehabilitation of Water Main-2014 East ENGINEERS ESTIMATE: $479,500.00
06/27/2014 06:00 PM UTC
7341 - CIPP Rehab of Sanitary and Storm Sewers 2014
7341 - CIPP Rehab of Sanitary and Storm Sewers 2014 ENGINEERS ESTIMATE: $545,000
06/20/2014 06:00 PM UTC
7228 - Block 11 Bowens Addition Alley Assessment District-2014
Block 11 Bowens Addition Alley Assessment District-2014 Engineers Estimate: $131,000.
06/20/2014 06:00 PM UTC
7238 - Cannonball Path Phase 5
Cannonball Path Phase 5 Engineers Estimate: 1,018,000.
06/20/2014 06:00 PM UTC
7334 - Fire Station #5 Roof Door and Hose Tower Repairs
Fire Station #5 Roof Door and Hose Tower Repairs Engineers Estimate: $40,000.00
06/20/2014 06:00 PM UTC
7304 - Bittersweet Place Assessment District - 2014
Bittersweet Place Assessment District - 2014; Engineer's Estimate: $750,000
06/20/2014 06:00 PM UTC
7317 - Morrison Court Reconstruction Assessment District 2014
Morrison Court Reconstruction Assessment District 2014; Engineer's Estimate: $111,958.00
06/20/2014 06:00 PM UTC
7318 - 2014 Playground Improvements - Group 2
2014 Playground Improvements - Group 2; Engineer's Estimate: $155,000.
06/20/2014 06:00 PM UTC
7319 - Highland Manor Storm Shelter (Site Grading Component)
Highland Manor Storm Shelter (Site Grading Component)
06/06/2014 06:00 PM UTC
961 - 970 of 1107 Solicitations
1 2 93 94 95 97 99 100 101 110 111