General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8763PlanHolders06182025.pdf (89.9 KB)
Contract 8763 - Badger Rusk Path
8784PlanHolders06182025.pdf (91.4 KB)
Contract 8784 - E Main S Hancock
9612PlanHolders06182025.pdf (108 KB)
Contract 9612 - CIPP UVLining - Phase 1 2025
9626PlanHolders06182025.pdf (110 KB)
Contract 9626 - Mid Town Hydraulic Improvements
9654PlanHolders06182025.pdf (106 KB)
Contract 9654 - CIPP Thermal Lining - Phase 1
6 Documents

Upcoming Solicitations

Number Deadline
9654 - CIPP Thermal Lining Rehabilitation of Sewers Phase 1 - 2025 & Storm CIPP 2025
The work includes the trenchless rehabilitation of approximately 3,487 linear feet of sanitary sewer pipelines ranging in size from 6” to 8” diameter AND approximately 1,739 linear feet for storm sewer pipelines ranging in size from 12” to 36”.
06/20/2025 07:00 PM UTC
9612 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2025
The work includes the trenchless rehabilitation of approximately 10,046 linear feet of sanitary sewer pipelines ranging in size from 8” to 24” diameter AND approximately 120 linear feet for storm sewer pipelines ranging in size from 10” to 12”.
06/20/2025 07:00 PM UTC
9626 - Mid Town Hydraulic Improvements
This project consists of water main improvements on Mid Town Road, generally between Marty Road to South Gammon Road. The work includes furnishing and installing new 6-in and 12-inch ductile iron water main and fittings as shown on the plans. Adjusting new valve boxes and hydrants to appropriate grades.
06/20/2025 07:00 PM UTC
8784 - E MAIN STREET AND SOUTH HANCOCK STREET ASSESSMENT DISTRICT -2025
This project generally consists of replacement and installation of sanitary sewer pipes and structures, water main, storm sewer pipes and structures, and replacement of street infrastructure including curb and gutter, pavement, sidewalk, driveway aprons, and installation of tree support systems, rain gardens, pavement marking, and signing.
06/25/2025 07:00 PM UTC
8763 - Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District - 2025
Badger Rusk Shared-Use Path & N. Rusk Avenue Assessment District – 2025 is in the City of Madison. State Project Number 5992-02-29 (City Project Number 14143). This project includes the construction of an off-street shared-use path on the northerly side of W. Badger Rd and westerly side of N. Rusk Ave between the existing pedestrian overpass bridge on W. Badger Rd to Nygard St. It also includes partial reconstruction of W. Badger Rd and reconstruction of N. Rusk Ave within the same limits.
07/03/2025 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
#7202 - Meadowridge Branch Library/Meadowood Neighborhood Center Remodeling
Meadowridge Branch Library/Meadowood Neighborhood Center Remodeling
01/10/2014 07:00 PM UTC
6988 - John Nolen Drive Bridge Bike Path Railing Replacement and Bike Path Bridge Approach Reconstruction, 3rd Bridge Outbound
John Nolen Drive Bridge Bike Path Railing Replacement and Bike Path Bridge Approach Reconstruction, 3rd Bridge Outbound
01/10/2014 07:00 PM UTC
#7203 - CIPP Rehab of Sanitary & Storm Sewers 2013 - East Side
CIPP Rehab of Sanitary & Storm Sewers 2013 - East Side
12/06/2013 07:00 PM UTC
Contract Number 7107, Unit Well 26 Generator Addition
Unit Well 26 Generator Addition
11/08/2013 07:00 PM UTC
Contract 7167 - Boulevard Landscaping-2013
Boulevard Landscaping-2013
11/08/2013 07:00 PM UTC
7191
Monona Terrace Carpet Replacement
10/04/2013 06:00 PM UTC
7185
Well 24 Roof Repair
10/04/2013 06:00 PM UTC
7194
Owen Park Drainage Channel Stabilization - 2013
10/04/2013 06:00 PM UTC
7172
Traffic Engineering Electrical Upgrades-2013
09/20/2013 06:00 PM UTC
7003
University Avenue Landscaping
09/20/2013 06:00 PM UTC
971 - 980 of 1047 Solicitations
1 2 94 95 96 98 100 101 102 103 104 105