General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 9-1-2017
2017 Sanitary Bypass Pump & Sanitary Lift Station Inspection and Bypass Pump Testing
01/25/2017 04:30 PM UTC
OFFICIAL NOTICE 4-1-2017
SANITARY, COMBINED AND STORM SEWER MAINS RELAY in: N. 5th St. – W. Juneau Av. to W. McKinley Av.; N. 14th St. – W. Locust St. to W. Groeling Av.; N. 16th St. – W. State St. to W. Highland Av.; W. Albany Pl. – N. 13th St. to N. Teutonia Av.; N. Teutonia Av. – 295’ S. of W. Center St. to W. Center St.; W. Groeling Av.– N. 14th St. to N. Teutonia Av.
01/10/2017 04:30 PM UTC
OFFICIAL NOTICE 111-1-2016
COMBINED SEWER MAINS RELAY & COMBINED AND STORM SEWER LINING AND MANHOLE REPAIR & LINING in: N. 35th St. – W. State St. to W. Highland Blvd.; N. 37th St. – W. Wisconsin Ave. to 175’+/- N. of W. Wisconsin Ave.; N. Cass St. – E. Wells St. to E. State St.; W. State St. – N. 34th St. to N. 35th St.; W. Wisconsin Ave. – N. 37th St. to 125’ +/- W. of N. 39th St.
11/29/2016 04:30 PM UTC
OFFICIAL NOTICE 111-2-2016
STORM SEWER MAIN RELAY AND NEW STORM SEWER CONSTRUCTION in: N. 61st St. – W. St. Paul Ave. to 250’ +/- N. of W. St. Paul Ave.; N. 76th St. – 110’ +/- N. of W. Leon Ter. to 140’ +/- N. of W. Sheridan Ave.; N. 76th St. – 280’ +/- S. of W. Grantosa Dr. to W. Medford Ave.; S. Lenox St. – E. Wilbur Ave. to 350’ +/- S. of E. Wilbur Ave.
11/29/2016 04:30 PM UTC
OFFICIAL NOTICE 111-3-2016
COMBINED SEWER LINING AND MANHOLE REPAIR & LINING in: N. 20th St. – W. North Ave. to W. Wright St. **Attendance at a Pre-Bid meeting on Monday, November 21, 2016 at 10:00 AM in Room 820, 841 N. Broadway, Milwaukee, WI 53202 is mandatory to bid on this project. Prequalification documentation is required to be submitted to the Environmental Engineering Section, Room 821, 841 N. Broadway, Milwaukee, WI 53202 prior to the close of business on November 21, 2016.
11/29/2016 04:30 PM UTC
OFFICIAL NOTICE 120-1-2016
Work performed under this contract shall consist of dead and hazard tree abatement throughout the City of Milwaukee. The CONTRACTOR shall furnish all labor, supervision, administration, materials, equipment, disposal, utility coordination, insurance, licenses, and permits as required for removal/hazard pruning of dead and hazard trees or branches from privately owned properties in violation of City Ordinance 116-53.
11/28/2016 04:30 PM UTC
OFFICIAL NOTICE 119-1-2016
HP-184: COAGULATION BASIN #4 FLOCCULATOR UPGRADES LOCATED AT HOWARD WATER TREATMENT PLANT, 3929 SOUTH 6TH STREET, MILWAUKEE, WI 53221
11/17/2016 04:30 PM UTC
OFFICIAL NOTICE 109-1-2016
Mechanical Unit Maintenance, located at the Century City Business Park, 3533 North 27th St., Milwaukee, WI
11/16/2016 04:30 PM UTC
OFFICIAL NOTICE 118-1-2016
WATER MAIN RELAYS, located at the following locations: Water Main Relays – W. Marion St. (WT410160905), N. 85th St. to N. 86th St. (10 working days); W. Marion St. (WT410160906), N. 87th St. to N. 90th St. (24 working days); N. 59th St. (WT410160907), W. Calumet Rd. to W. Port Ave. (17 working days); N. Delta Pl. (WT410160908), W. Calumet Rd. to W. Port Ave. (41 working days); W. Luebbe La. (WT410160909), N. 51st Blvd. to N. Edgeworth Dr. (43 working days)
11/11/2016 04:30 PM UTC
OFFICIAL NOTICE 117-1-2016
MILWAUKEE POLICE DEPARTMENT POLICE ADMINISTRATION BUILDING 3RD FLOOR DEMOLITION AND ASBESTOS ABATEMENT 749 W STATE ST MILWAUKEE WI 53223
10/27/2016 03:30 PM UTC
1111 - 1120 of 1601 Solicitations