General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 78-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; Street Lighting Upgrades for: ST3202318100 – Street Lighting Improvement for Carbon Reduction Program @ Various Locations
08/15/2025 03:30 PM UTC
OFFICIAL NOTICE 90-1-2025
CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, PAVERS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS, GRAVEL FILLING, CRUSHED GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER ALTERATIONS, STREET LIGHTING, UNDERGROUND CONDUIT, LANDSCAPING, TOPSOILING, ETC.
08/19/2025 03:30 PM UTC
OFFICIAL NOTICE 76-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” AND 8” CONCRETE BASE, 8” CONCRETE PAVEMENT, 8” HIGH EARLY STRENGTH COLORED CONCRETE, 7” AND 8” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, SEALING PAVEMENT JOINTS AND CRACKS, VARIOURS TRAFFIC SIGNAGE ASSEMBLY AND INSTALLATION, GRAVEL FILLING, CONCRETE REMOVALS, VARIOUS PAVEMENT MARKINGS, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, ETC.; Located at: ST211220233 – In West Adler Street - South Hawley Road to South 68th Street
08/26/2025 03:30 PM UTC
OFFICIAL NOTICE 66-1-2025
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded By (ABB): ST212240108 - West Congress Street, West Marion Street, North 75th Street, & North 76th Street ST212180109 - East Brady Street, North Cass Street, East Kewaunee Street, & North Marshall Street ST212250101 - West Auer Avenue, West Burleigh Street, North 88th Street, & North 89th Street ST21200101 - West Atkinson Avenue, West Finn Place, North 10th Street, & North 11th Street ST212230107 - South Honey Creek Drive, South Lorene Drive, South Melinda Street, & West Wanda Avenue ST212220119 - West Cypress Street, West Fond Du Lac Avenue, West Monroe Street, West Wright Street, & North 24th Street
08/27/2025 03:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 39-1-2016
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CRACKING, CONCRETE PAVEMENT AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: (ST211160106) - N. Maryland Ave. - E. Newberry Blvd. to E. Kenwood Blvd.
04/22/2016 03:30 PM UTC
OFFICIAL NOTICE 48-1-2016
WATER MAIN RELAYS, located at the following locations: W. Woolworth Ave. (WT410160001), N. 46th St. to 690’ W/O N. 46th St. (17 Working Days); W. Maxwell Pl. (WT410160605), N. 52nd St. to W. Fond du Lac Ave. (14 Working Days); N. 68th St. (WT410160672), W. Fond du Lac Ave. to W. Stark St. (13 Working Days); N. 67th St. (WT410160673), W. Stark St. to W. Villard Ave. (43 Working Days); W. Fairmount Ave. (WT410160675), N. 62nd St. to N. 63rd St. (10 Working Days); W. Stark St. (WT410160676), N. 67th St. to N. 68th St. (14 Working Days).
04/21/2016 03:30 PM UTC
OFFICIAL NOTICE 50-1-2016
WATER MAIN RELAYS, located at the following locations: W. Congress St. (WT410160630), N. 99th St. to N. 100th St. (10 Working Days); N. 98th St. (WT410160650), W. Capitol Dr. to 85’ N/O W. Sarasota Pl. (11 Working Days); N. 95th St. (WT410160651), W. Sarasota Pl. to W. Fiebrantz Ave. (13 Working Days); N. 99th St. (WT410160667), W. Vienna Ave. to W. Metcalf Pl. (16 Working Days); N. 95th St. (WT410160694) 170’ N/O W. Concordia Ave. to W. Townsend St. (14 Working Days)
04/21/2016 03:30 PM UTC
OFFICIAL NOTICE 22-1-2016
CONSTRUCTION OF 7” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7”CONCRETE DRIVEWAY, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, AND SEWER WORK, ETC.; Located at: (ST211140129) - N. 32nd St. - W. Lisbon Ave. to W. North Ave.
04/19/2016 03:30 PM UTC
OFFICIAL NOTICE 24-1-2016
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.;Located at: (ST211150173) - N. Holton St. - E. Capitol Dr. to E. Hope Ave. (ST211150174) - E. Hope Ave. - N. Richards St. to N. Holton St.
04/18/2016 03:30 PM UTC
OFFICIAL NOTICE 28-1-2016
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CRACKING AND SEATING CONCRETE PAVEMENT, 5”, 7” AND 8” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: (ST211040107) - W. Woolworth Ave. - N. Sherman Blvd. to N. 51st St.
04/15/2016 03:30 PM UTC
OFFICIAL NOTICE 25-1-2016
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: (ST211150102) - N. 70th St. - 1000' +/- s/o W. Glenbrook Rd. to W. Glenbrook Rd. (ST211150159) - W. Fairmount Ave. - N. 107th St. to N. 108th St. (ST211150134) - N. 91st St. - W. Center St. to W. Locust St.
04/14/2016 03:30 PM UTC
OFFICIAL NOTICE 43-1-2016
WATER MAIN RELAYS, located at the following locations: Water Main Relays – W. Whitaker Ave. (WT410160604), S. 20th St. to S. Louisiana Ave. (22 Working Days); S. 25th St. (WT410160614), W. Holt Ave. to W. Warnimont Ave. (32 Working Days); S. 26th St. (WT410160615), W. Ohio Ave. to W. Holt Ave. (16 Working Days); W. Euclid Ave. (WT410160616), S. 22nd St. to S. 23rd St. (9 Working Days); W. Warnimont Ct. (WT410160622), S. 68th St. to 160ft West of S. 68th St. (10 Working Days); W. Dodge Pl. (WT410160623), 70ft Southeast of W. Wilbur Ave. to 570ft Southeast of W. Wilbur Ave. (19 Working Days); W. Tripoli Ave. (WT410160668), S. 67th St. to S. 68th St. (17 Working Days).
04/08/2016 03:30 PM UTC
OFFICIAL NOTICE 49-1-2016
CONCRETE REPLACEMENT SERVICES VARIOUS SITES MILWAUKEE, WI
04/05/2016 03:30 PM UTC
OFFICIAL NOTICE 40-1-2016
WATER MAIN RELAYS, located at the following locations: Water Main Relays – W. Thurston Ave. (WT410160638), N. 71st St. to N. 72nd St. (16 Working Days); N. 71st St. (WT410160639), W. Thurston Ave. to W. Bobolink Ave. (26 Working Days); N. 63rd St. (WT410160640), W. Bobolink Ave. to W. Florist Ave. (16 Working Days); N. 67th St. (WT410160641), W. Bobolink Ave. to W. Florist Ave. (17 Working Days); N. 65th St. (WT410160642) W. Carmen Ave. to W. Florist Ave. (32 Working Days); N. 62nd St. (410160643), W. Carmen Ave. to W. Bobolink Ave. (17 Working Days); W. Bobolink Ave. (WT410160644), N. 64th St. to N. 65th St. (11 Working Days)
04/01/2016 03:30 PM UTC
1071 - 1080 of 1492 Solicitations
1 2 104 105 106 108 110 111 112 149 150