General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 7-3-2017
COMBINED SEWER MAIN RELAY & COMBINED SEWER LINING, AND MANHOLE REPAIR & LINING in: Located at: N. 2nd St. – 295’ S. of W. Wright St. to 295’ N of W. Clarke St. W. Meinecke Ave. – N. 1st St. to N. Dr. Martin Luther King Jr. Dr. W. Wright St. – N. 1st St. to N. 2nd St. **Attendance at a Pre-Bid meeting on Friday, February 17, 2017 at 10:00 AM in Room 820, 841 N. Broadway, Milwaukee, WI 53202 is mandatory to bid on this project.
02/27/2017 04:30 PM UTC
OFFICIAL NOTICE 7-4-2017
COMBINED SEWER MAIN RELAY & COMBINED SEWER LINING, AND MANHOLE REPAIR & LINING in: Alley East of N. Water St. - E. Chicago St. to 220' +/- North of E. Chicago St., E. Michigan St. - N. Jackson St. to N. Van Buren St., N. Van Buren St. - E. Wisconsin Ave. to Pt. South of E. Michigan St.
02/27/2017 04:30 PM UTC
OFFICIAL NOTICE 6-1-2017
SANITARY BUILDING SEWER (LATERAL) LINING AND REPAIR IN: AREA BOUNDED BY WEST LAYTON AVENUE TO WEST EDGERTON AVENUE FROM SOUTH 20TH STREET TO SOUTH 27TH STREET **Attendance at a Pre-Bid meeting on Monday, February 20, 2017 at 10:00 AM in Room 820, 841 N. Broadway, Milwaukee, WI 53202 is mandatory to bid on this project. The Contractor must submit all required pre-qualification product, manufacturer, and installer documents to the City of Milwaukee at the following address: 841 North Broadway, Milwaukee WI 53202, ATTN: Mr. Zafar Yousuf, by no later than Monday February 20, 2017.
02/24/2017 04:30 PM UTC
OFFICIAL NOTICE 1-1-2017
Install skid-resistant, solid surface plating on the North Emmber Lane and North Plankinton Avenue open grate lift bridges over the Menomonee River.
02/23/2017 04:30 PM UTC
OFFICIAL NOTICE 21-1-2017
WATER MAIN RELAYS in the following location: Water Main Relays – S. Melinda St. (WT410170655), W. Birchwood Ave. to W. Parnell Ave. (10 working days); S. 53rd St. (WT410170662), W. Wilbur Ave. to W. Howard Ave. (36 working days); S. 25th Ct. (WT410170674), W. Henry Ave. to 210’ South of W. Henry Ave. (10 working days); S. 82nd St. (WT410170676), W. Warnimont Ave. to W. Wilbur Ave. (26 working days); S. 3rd St. (WT410160685), 205’ North of W. Walker St. to W. Walker St. (17 working days); W. Walker St. (WT410160686), S. 2nd St. to S. 3rd St. (23 working days)
02/22/2017 04:30 PM UTC
OFFICIAL NOTICE 2-1-2017
This project involves the Rehabilitation of the South 1st Street Bascule Bridge over the Kinnickinnic River, P-40-830, including but not limited to; demolition of specified bridge and related components, structural steel, poured-in-place concrete, concrete repairs, reinforcing steel, painting, mechanical and electrical equipment upgrades, bridge house repairs, and incidental work.
02/21/2017 04:30 PM UTC
OFFICIAL NOTICE 30-1-2017
WATER MAIN RELAYS, located at the following locations: W. Thurston Av. (WT410160900), N. Teutonia Av. to N. 34th St. (26 working days); N. 34th St. (WT410160901), W. Thurston Av. to 200’ S/O W. Oriole Dr. (16 working days); N. 62nd St. (WT410160902), W. Fiebrantz Av. to W. Congress St. (55 working days); N. 66th St. (WT410160903), W. Fiebrantz Av. to W. Congress St. (40 working days); N. 64th St. (WT410160904), W. Capitol Dr. to W. Hope Av. (40 working days) (Note: Contractor to furnish and install approximately 7,252 lin. ft. of 12”, 8”, 6” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
02/20/2017 04:30 PM UTC
OFFICIAL NOTICE 22-1-2017
Water Main Relays - Located at: N. 64th St. (WT410140001), W. Nash St. to 420’ N/O W. Nash St. (15 working days); W. Rohr Ave. (WT410170002), N. 48th St. to N. 49th St. (12 working days); N. 76th St. (WT410140009), W. Grantosa Dr. to W. Florist Ave. (10 working days); N. 91st St. (WT410170616), W. Keefe Ave. to W. Metcalf Pl. (12 working days); W. Concordia Ave. (WT410170659), N. 98th St. to N. 99th St. (14 working days); N. 98th St. (WT410170660), W. Concordia Ave. to W. Townsend St. (21 working days); W. Park Hill Ave. (WT410170663), W. Mt. Vernon Ave. to N. 93rd St. (14 working days); (Note: Contractor to furnish and install approx. 2951 lin. ft. of 12”, 8” and 6” DI pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
02/16/2017 04:30 PM UTC
OFFICIAL NOTICE 10-1-2017
2017 SANITARY MANHOLE INSPECTION, SEWER STRUCTURES INSPECTION AND CITY UNDERGROUND CONDUIT MANHOLE INSPECTION PROJECT
02/10/2017 04:30 PM UTC
OFFICIAL NOTICE 5-1-2017
COMBINED SEWER MAIN RELAY & COMBINED SEWER LINING, AND MANHOLE REPAIR & LINING in: Located at: S. 18th St. – W. Scott St. to W. Greenfield Ave. S. 25th St. - W. Greenfield Ave. to W. Orchard St. S. 29th St. - W. Greenfield Ave. to W. Orchard St. S. 30th St. - W. Greenfield Ave. to W. Orchard St. S. 31st St. – W. Madison St. to W. Greenfield Ave. S. 32nd St. - W. Greenfield Ave. to W. Orchard St. W. Greenfield Ave. – S. 17th St. to S. 26th St. W. Greenfield Ave. – S. 33rd St. to S. 34th St. W. Greenfield Ave. – S. Layton Blvd. to S. 28th St.
01/26/2017 04:30 PM UTC
1101 - 1110 of 1601 Solicitations
1 2 107 108 109 111 113 114 115 160 161