General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 27-1-2025
PROJECT 1: SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & SANITARY SEWER MAIN REPAIR S. 6th St. - W. Ohio Ave. to 480’ S. of W. Ohio Ave. S. Austin St. – E. Van Norman Ave. to E. Armour Ave. N. Bartlett Ave. – E. Kane Pl. to 200’+/- NE. of E. Kane Pl. E. Howard Ave. – S. Kansas Ave. to 210’+/- E. of S. Kansas Ave. E. Howard Ave. – S. Nevada St. to S. Brust Ave. S. Kansas Ave. – E. Howard Ave. to E. Norwich Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 27-2-2025
PROJECT NO. 2: COMBINED SEWER MAIN RELAY Located at: N. 15th St. – W. Concordia Ave. to W. Keefe Ave. N. 16th St. – W. Ring St. to W. Keefe Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 19-1-2016
SANITARY AND COMBINED SEWER LINING, REPAIR AND MANHOLE REPAIR & LINING in: N. Broadway – E. St. Paul Ave. to E. Clybourn St. N. Broadway – 120’ +/- S. of E. Wells St. to E. Kilbourn Ave. E. Mason St. – N. Milwaukee St. to N. Jefferson St. E. Michigan St. – N. Milwaukee St. to N. Water St. N. Milwaukee St. – E. Mason St. to E. Wells St. E. State St. – 120’ +/- W. of N. Jackson St. to N. Jackson St.
03/09/2016 04:30 PM UTC
OFFICIAL NOTICE 4-1-2016
PROJECT NO. 1: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC,: (ST216160103) - Asphalt Overlays located at: N. Jefferson St. - E. Erie St. to E. Chicago St. & E. Chicago St. to E. St. Paul Ave., N. Maryland Ave. - E. Hartford Ave. to E. Edgewood Ave., N. Oakland Ave. - E. Park Pl. to E. Edgewood Ave., N. Van Buren St. - E. Kilbourn Ave. to E. Ogden Ave.
03/08/2016 04:30 PM UTC
OFFICIAL NOTICE 4-2-2016
PROJECT NO. 2: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC,: (ST216160103) - Asphalt Overlays located at: N. Jefferson St. - E. Erie St. to E. Chicago St. & E. Chicago St. to E. St. Paul Ave., N. Maryland Ave. - E. Hartford Ave. to E. Edgewood Ave., N. Oakland Ave. - E. Park Pl. to E. Edgewood Ave., N. Van Buren St. - E. Kilbourn Ave. to E. Ogden Ave.
03/08/2016 04:30 PM UTC
OFFICIAL NOTICE 5-1-2016
PROJECT NO. 1: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC,: (ST216160104) - Asphalt Overlays located at: N. 37th St. - W. Fond Du Lac Ave. to W. Townsend St., W. Center St. - N. 20th St. to N. 27th St., W. Lisbon Ave. / W. Walnut St. - N. 20th St. to N. 31st St., W. Wells St. - N. 27th St. to N. 37th St.
03/07/2016 04:30 PM UTC
OFFICIAL NOTICE 5-2-2016
PROJECT NO. 2: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC,: (ST216160104) - Asphalt Overlays located at: N. 37th St. - W. Fond Du Lac Ave. to W. Townsend St., W. Center St. - N. 20th St. to N. 27th St., W. Lisbon Ave. / W. Walnut St. - N. 20th St. to N. 31st St., W. Wells St. - N. 27th St. to N. 37th St.
03/07/2016 04:30 PM UTC
OFFICIAL NOTICE 33-1-2016
WATER MAIN RELAYS at the following locations: N. 80th St. (WT410160620), W. Thurston Ave. to W. Carmen Ave. (18 Working Days); N. 84th St. (WT410160621), W. Carmen Ave. to W. Bobolink Ave. (20 Working Days); W. Custer Ave. (WT410160624), N. 87th St. to N. 91st St. (27 Working Days)
03/04/2016 04:30 PM UTC
OFFICIAL NOTICE 34-1-2016
Boulevard and Greenspace Mowing and Litter Removal. Work on this project shall consist of up to 26 weekly mowing cycles during the growing season on City-owned boulevards and greenspaces City-wide. Boulevard and Greenspace Mowing and Litter Removal shall begin on or about April 1, 2016 and continue to October 15, 2016.
03/03/2016 04:30 PM UTC
OFFICIAL NOTICE 7-1-2016
PROJECT NO. 1: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, (ST216160106) - Asphalt Overlays located at: N. 51st Blvd. - W. Capitol Dr. to W. Hampton Ave., W. Roosevelt Dr. - N. 36th St. to W. Fond Du Lac Ave.
03/02/2016 04:30 PM UTC
OFFICIAL NOTICE 7-2-2016
PROJECT NO. 2: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, (ST216160106) - Asphalt Overlays located at: N. 51st Blvd. - W. Capitol Dr. to W. Hampton Ave., W. Roosevelt Dr. - N. 36th St. to W. Fond Du Lac Ave.
03/02/2016 04:30 PM UTC
OFFICIAL NOTICE 16-1-2016
7TH DISTRICT POLICE STATION RTUs REPLACEMENT 3626 WEST FOND DU LAC AVENUE MILWAUKEE WI
03/01/2016 04:30 PM UTC
1081 - 1090 of 1476 Solicitations
1 2 105 106 107 109 111 112 113 147 148