We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 106-2-2025
WP-346 Cameron Window Improvement Project
12/17/2025 04:30 PM UTC
OFFICIAL NOTICE 106-1-2025
WP-346 Linnwood Window Improvement Project
12/17/2025 04:30 PM UTC
OFFICIAL NOTICE 108-1-2025
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, CONCRETE CURB AND GUTTER, PAVEMENT GRINDING, VARIOUS PLASTIC PAVEMENT MARKINGS, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, PINNED-ON CONCRETE TRAFFIC ISLANDS, BIOSWALES, ETC.;
12/18/2025 04:30 PM UTC
OFFICIAL NOTICE 105-1-2025
WATER MAIN RELAYS/ ALTERATIONS & LEAD SERVICE LINE REPLACEMENTS, at the following locations: N. 19th St. (WT410230614), W. Fairmount Av. To W. Eggert Pl. (22 working days); W. Eggert Pl. (WT410230615), N. 19th St. to N. 19th Pl. (9 working days); N. 19th Pl. (WT410230616), W. Fairmount Av. to W. Eggert Pl. (23 working days); N. 19th St. (WT410230617), W. Eggert Pl. to W. Villard Av. (8 working days); W. Cornell St. (WT410230640) N. 20th St. to N. Teutonia Av. (42 working days); W. Linwal La. (WT410230656) N. 22nd St. to N. 24th St. (11 working days); N. 22nd St. (WT410230657) W. Hampton Av. to W. Linwal La. (9 working days); W. Stark St. (WT410230658) N> 20th St. to N. 24th St. (12 working days); W. Custer Av. (WT410230669) N. 20th St. to 100’ W/O N. Long Island Dr. (6 working days); N. 20th St. (WT410230670) W. Custer Av. to W. Neil Pl. (9 working days); W. Neil Pl. (WT410230671) N. 20th St. to 215’ NW/O N. Long Island Dr. (21 working days); W. Pierce St. (WT410250608) S. 6th St. to S. 9th St. (43 working days); N. 51st St. (WT410250754) W. Center St. to W. Burleigh St. (4 working days); N. 60th St. (WT410250756) at W. Burleigh St. (3 working days). (Note: Contractor to furnish and install approximately 9,950 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
12/19/2025 04:30 PM UTC
OFFICIAL NOTICE 105-2-2025
WATER MAIN RELAYS/ ALTERATIONS & LEAD SERVICE LINE REPLACEMENTS, at the following locations: N. 68th St. (WT410230642), W. Grantosa Dr. to 425’ S/O W. Grantosa Dr. (9 working days); W. Herbert Av. (WT410230643), W. Tallmadge Pl. to N. 74th St. (12 working days); W. Tallmadge Pl. (WT410230644), W. Grantosa Dr. to W. Custer Av. (8 working days); W. Locust St. (WT410230645), N. 50th St. to N. 57th St. (48 working days); N. 94th St. (WT410230666), W. Center St. to 400’ NE/O W. Center St. (8 working days); W. Hadley St. (WT410230667), 320’ W/O N. 92nd St. to N. Colonial Dr. (19 working days); N. 95th St./W. Lorraine Pl./N. 97th St. (WT410230668), W. Center St. to W. Center St. (25 working days); S. Griffin Av. (WT410230696), E. Plainfield Av. to 350’ S/O E. Plainfield Av. (8 working days); S. Adams Av. (WT410230697), E. Plainfield Av. to 300’ S/O E. Plainfield Av. (9 working days); W. Appleton Av. (WT410240735), W. Hampton Av. (2 working days); N. 76th St. (WT410250601), W. Bobolink Av. to 120’ N/O W. Florist Av. (13 working days); W. Florist Av. (WT410250602), N. 76th St. to N. 77th St. (9 working days); N. 76th St. (WT410250751) W. Northridge Lakes Blvd. (3 working days); W. Becher St. (WT410250755) S. 4th St. (NEC) (2 working days) (Note: Contractor to furnish and install approximately 8,824 lin. ft. of 12”, 8”, 6”, and 4” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
12/19/2025 04:30 PM UTC
OFFICIAL NOTICE 75-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 9 CONCRETE PAVEMENT, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SPEED HUMPS, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located At: ST211220262 – In N. 39th St./N. Sercombe Rd. – W. Hope Ave. to W. Marion St.
12/30/2025 04:30 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 92-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, CRACKING AND SEATING PAVEMENT, 5’ CONCRETE WALK, ETC. located at (ST211140142) E. Newport Ct. – A Point east of N. Lake Dr. to N. Lake Dr.; (ST211140120) N. 97th St. – W. Concordia Ave. to W. Keefe Ave.; (ST211140122) N. 67th St. – W. Vienna Ave. to W. Capitol Dr.; (ST211140137) W. Beckett Ave. – W. Courtland Ave. to W. Hampton Ave.
08/14/2014 03:30 PM UTC
OFFICIAL NOTICE 93-1-2014
SIDEWALK REPLACEMENT WORK, located in the Area Between: W. Vliet St., N. Hawley Rd., N. Hi-Mount Blvd., W. Mitchell St., S. 16th St., W. Becher St., W. Forest Home Ave., S. Muskego Ave., & Various Schools. (ST230140147)
08/12/2014 03:30 PM UTC
OFFICIAL NOTICE 90-1-2014
CONSTRUCTION OF 7”CONCRETE ALLEY PAVEMENT, PAVEMENT REMOVAL, CRUSHED STONE BASE, ETC. located at (ST212140128) Alley betw W. Hampton Av, N. Hopkins St, W. Stark St. and N. 39th St.; (ST212140106) Alley betw W. Acacia St, W. Casper St, W. Green Tree, N. 77th St, N. 78th St, and N. 80th St.; (ST212060110) Alley betw W. Lisbon Av, W. Metcalf Pl, N. 97th St. and N. 98th St.
08/11/2014 03:30 PM UTC
OFFICIAL NOTICE 94-1-2014
CONSTRUCTION OF 7”CONCRETE PAVEMENT, PAVEMENT REMOVAL, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, ETC. located at (ST211140124) N. 53rd St. – W. Keefe Ave. to W. Vienna Ave.; (ST211140139) S. 61st St. – W. Dixon St. to a Point 140’+/- North of W. Dixon St.
08/08/2014 03:30 PM UTC
OFFICIAL NOTICE 81-1-2014
SEALCOATING WORK, located at various locations in the City of Milwaukee.
08/06/2014 03:30 PM UTC
OFFICIAL NOTICE 82-1-2014
CRACKFILLING WORK, located at various locations in the City of Milwaukee.
08/06/2014 03:30 PM UTC
OFFICIAL NOTICE 111-1-2014
DUMPING AND DEBRIS REMOVAL FROM CITY OWNED PROPERTIES: Project 1: City-Owned Lot Areas 1, 2, and 3: Area bounded by Capitol Drive, North 20th Street, North Avenue, west City limit and north City limit.
08/05/2014 03:30 PM UTC
OFFICIAL NOTICE 111-2-2014
DUMPING AND DEBRIS REMOVAL FROM CITY OWNED PROPERTIES: Project 2: City-Owned Lot Areas 7, 8, and 10: Area bounded by North Avenue, North 20th Street, Interstate 94, Lake Michigan, south City limit, and west city limit.
08/05/2014 03:30 PM UTC
OFFICIAL NOTICE 85-2014
CONSTRUCTION OF 7”CONCRETE ALLEY PAVEMENT, PAVEMENT REMOVAL, CRUSHED STONE BASE, TREE CLEARING AND GRUBBING, ETC. located at (ST212060125) Alley betw W. Grant St, W. Lincoln Av, S. 20th St, and S. 21st St (permeable alley); (ST212140102) – Alley betw W. Cleveland Av, W. Fremont Pl, S. 63rd St, and S. 67th St (permeable alley); (ST212140129) Alley betw E. Fernwood Av, S. Illinois Av, S. Indiana Av, E. Oklahoma Av (permeable alley); (ST212140122) – Alley betw W. Center St, W. Clarke St, N. 55th St and N. 56th St (permeable alley)
08/04/2014 03:30 PM UTC
OFFICIAL NOTICE 98-1-2014
WATER MAIN RELAYS - W. FIEBRANTZ AVE. (WT410110613), N. 79TH ST. TO N. 80TH ST.; N. 80TH ST. (WT410110614), W. FIEBRANTZ AVE. TO W. HOPE AVE.; W. ROCHELLE AVE. (WT410110640), N. 37TH TO N. 38TH ST.; N. 37TH ST. (WT410110641), W. KILEY AVE. TO W. ROCHELLE AVE.; W. GRANTOSA DR. (WT410110663), N. 100TH ST. TO W. FIEBRANTZ AVE.
08/01/2014 03:30 PM UTC