General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 72-3-2015
CITY-OWNED LOT LANDSCAPE MAINTENANCE in the following locations: Project 3: City-Owned Lot Area 3: Area bounded by North Avenue, North 27th Street, Capitol Drive, and North 20th Street.
04/22/2015 03:30 PM UTC
OFFICIAL NOTICE 27-1-2015
CONSTRUCTION OF 8” CONCRETE PAVEMENT, PAVEMENT REMOVAL, 5” CONCRETE WALK, CURB & GUTTER, SEWER WORK, ETC, located at (ST211140150) E. Erie St. at E. Menomonee St. (Intersection modification) and E. Menomonee St. – N. Broadway to E. Erie St.; (ST211140156) N. Water St. at E. Pearson St. (Marsupial bridge area access); (ST211140158) W. Clybourn St. – a point east of N. 16th St. to N. 16th St. (median)
04/14/2015 03:30 PM UTC
OFFICIAL NOTICE 60-1-2015
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, PAVEMENT REMOVAL, 4” CRUSHED STONE BASE, SEALING PAVEMENT JOINTS & CRACKS, ETC, located at (ST212070110) Alley betw W. Holt Av, W. Morgan Av, S. 18th St, and S. 19th St.; (ST212020122) Alley betw W. Holt Av, W. Morgan Av, S. 10th St, and S. 11th St.; (ST212150110) Alley betw W. Denis Av, S. Honey Creek Dr, W. Wanda Av, and S. 41st St.
04/09/2015 03:30 PM UTC
OFFICIAL NOTICE 26-1-2015
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, REPAIR PAVEMENT JOINTS AND CRACKS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, SEWER WORK, ETC, located at (ST211060141) S. Burrell St. – Pt. 275’ South of E. Ohio Ave. to E. Ohio Ave.; (ST211140101) S. 53rd St. – W. Montana St. to W. Cleveland Ave.; (ST211140159) S. Kinnickinnic Ave. SE of S. California St. (Ped Crossing); (ST211140160) S. 43rd St. at W. Montana St. (Ped Crossing); (ST211140155) W. Rosedale Ave. – West of S. Chase Ave. (Bike Trail access point)
04/08/2015 03:30 PM UTC
OFFICIAL NOTICE 25-1-2015
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, REPAIR PAVEMENT JOINTS AND CRACKS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, SEWER WORK, ETC, located at (ST211140130) S. 79th St. – W. Morgan Ave. to W. Ohio Ave.; (ST211140138) S. 81st St. – W. Morgan Ave. to W. Holt Ave.
04/08/2015 03:30 PM UTC
OFFICIAL NOTICE 39-1-2015
WP-322: BURIED SOUTH FILTERED WATER RESERVOIR WATERPROOFING REPAIRS LOCATED AT LINNWOOD WATER TREATMENT PLANT, 3000 NORTH LINCOLN MEMORIAL DRIVE, MILWAUKEE, WI 53211
04/01/2015 03:30 PM UTC
OFFICIAL NOTICE 17-1-2015
SANITARY, COMBINED, AND STORM SEWER MAINS RELAY AND COMBINED SEWER MAIN LINING, AND MANHOLE REPAIR & LINING in: N.64th St. – 160’+/- south of W. Moltke Ave. to W. Moltke Ave. W. McKinley Ave. – N. 19th St. to N. 21st St. W. McKinley Ave. – N. 24th St. to N. 24th Pl. W. Moltke Ave. – W. Appleton Ave. to N. 68th St. W. Wells St. – N. 46th St. to N. 51st St.
03/26/2015 03:30 PM UTC
OFFICIAL NOTICE 17-2-2015
SANITARY AND COMBINED SEWER MAINS RELAY, SANITARY AND COMBINED SEWER MAINS LINING AND MANHOLE REPAIR & LINING, STORM SEWER OUTLET REHABILITATION AND NEW STORM SEWER MAIN INSTALLATION in: N. 19th St. – W. Clybourn St. to 697’ +/- north of W. Clybourn St.; N. 20th St. – W. Wells St. to W. Kilbourn Ave.; N. 21st St. – W. Clarke St. to W. Center St.; N. 24th St. – W. Lisbon Ave. to W. Vine St.; N. 26th St. – W. Hadley St. to W. Chambers St.; E. Clarke St. – N. Hubbard St. to N. Richards St.; W. Melvina St. – N. 63rd St. (in Dineen Park); W. Fond Du Lac Ave. – N. 36th St. to N. 38th St.; W. Wright St. – N. Palmer Ave. to N. Buffum St
03/26/2015 03:30 PM UTC
OFFICIAL NOTICE 14-1-2015
CONSTRUCTION OF 7” CONCRETE PAVEMENT, ROADWAY CUTTING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, SODDING, ETC, located at (ST211140133) N. Weil St. – E. Meinecke Ave. to E. Center St.
03/24/2015 03:30 PM UTC
OFFICIAL NOTICE 47-1-2015
WATER MAIN RELAYS, located at the following locations: W. Burdick Ave. (WT410140646), S. 88th St. to S. 89th St. (13 Working Days); S. 90th St. (WT410140647), 720’ N/O W. Burdick Ave. to W. Burdick Ave. (17 Working Days); S. 91st St. (WT410150601), W. Holt Ave. to 135’ S/O W. Verona Ct. (14 Working Days); W. Greenfield Ave. (WT410150604), S. 35th St. to S. 37th St. (14 Working Days).
03/19/2015 03:30 PM UTC
1321 - 1330 of 1601 Solicitations