We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 78-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; Street Lighting Upgrades for: ST3202318100 – Street Lighting Improvement for Carbon Reduction Program @ Various Locations
08/15/2025 03:30 PM UTC
OFFICIAL NOTICE 90-1-2025
CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, PAVERS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS, GRAVEL FILLING, CRUSHED GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER ALTERATIONS, STREET LIGHTING, UNDERGROUND CONDUIT, LANDSCAPING, TOPSOILING, ETC.
08/19/2025 03:30 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 72-1-2014
Installation of traffic calming speed humps at W. Vilter La., S. 31st St., N. 49th St., and N. 83rd St. in various Aldermanic Districts
06/23/2014 03:30 PM UTC
OFFICIAL NOTICE 75-1-2014
SANITARY, STORM, AND COMBINED SEWER MAINS RELAY, COMBINED SEWER LINING, AND SANITARY SEWER ABAONDONMENT in: S. 28th St. – W. Hayes Ave. to W. Forest Home Ave. S. 35th St. – 270’ N. of W. Mitchell St. to 300’ S. of W. Burnham St. S. 42nd St. (Various Locations) – W. Forest Home Ave. to 100’ +/- S. of W. Euclid Ave. W. Euclid Ave. – S. 42nd St. to S. 43rd St.
06/23/2014 03:30 PM UTC
OFFICIAL NOTICE 55-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALT PAVEMENT, CONCRETE WALK, CONCRETE CURB AND GUTTER, POROUS PAVEMENT, RETAINING WALL, ETC, located at (TD06780002) The Brewery Phase 4 (W. Highland Ave., W. McKinley Ave., W. Winnebago St., N. 8th St., N. 9th St., N. 10th St., N. 11th St.) ALTERNATE 1: W. Winnebago St. - N. 8th St. (ext'd) to N. 10th St. (s. of s. curb), a portion of (W. Highland Av., W. Juneau Av., W. McKinley Av., W. Winnebago St., N 8th St., N. 9th St., N 10th St., N 11th St. ALTERNATE 2: W. Highland Av. - N. 8th St. to N. 10th St. (n. of n. curb), a portion of (W. Highland Av., W. Juneau Av., W. McKinley Av., W Winnebago St., N. 8th St., N 9th St., N 10th St., N. 11th St.)
06/18/2014 03:30 PM UTC
OFFICIAL NOTICE 54-1-2014
CONSTRUCTION OF 9” CONCRETE PAVEMENT, CONCRETE WALK, CONCRETE CURB AND GUTTER, PAVEMENT REMOVAL, CURB REMOVAL, ETC, located at (ST211130136) E. Greenfield Ave. - Kinnickinnic River to S. 1st St.
06/17/2014 03:30 PM UTC
OFFICIAL NOTICE 67-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, CONCRETE WALK, CONCRETE CURB AND GUTTER, PAVEMENT REMOVAL, CURB REMOVAL, ETC, located at (ST211140146) W. Hope Ave. - N. 35th St. to N. 38th St.
06/13/2014 03:30 PM UTC
OFFICIAL NOTICE 53-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, CONCRETE WALK, CONCRETE CURB AND GUTTER, ROADWAY CUTTING, CURB REMOVAL, ETC, located at (ST211050113) N. 37th St. – W. Meinecke Av. to W. Clarke St. (also TID 40); (ST211130139) W. Lloyd St. - N. 35th St. to W. Lisbon Ave. (also TID 40)
06/11/2014 03:30 PM UTC
OFFICIAL NOTICE 29-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST216140101) High Impact Streets #1 - Asphalt Resurface by Contract; W. Cherry St. – Martin Luther King Dr. to Water St.; W. Wells St – N. 13th St. to N. 17th St.; N. 4th St. – Clybourn St. to Wisconsin Ave.
06/10/2014 03:30 PM UTC
OFFICIAL NOTICE 70-1-2014
R.A. ANDERSON WATER TOWER AND MUNICIPAL BUILDING REROOFING OF THE 2ND FLOOR ROOF 4001 S. 6TH STREET MILWAUKEE, WI 53221
06/10/2014 03:30 PM UTC
OFFICIAL NOTICE 74-1-2014
2014 Sanitary Manhole Rehabilitation
06/09/2014 03:30 PM UTC
OFFICIAL NOTICE 30-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST216140102) High Impact Streets #2; N. 16th St. – W. Wisconsin Ave. to W. Kilbourn St.; N. Renee St. – W. Kilbourn St. to W. State St.; N. 55th St. – N. Hawley/W. Vliet to N. Lisbon; N. 8th St. – W. North Ave. to W. Center St.; N. Teutonia Ave. – W. Villard Ave. to W. Silver Spring Dr.
06/06/2014 03:30 PM UTC