General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 57-1-2025
WATER MAIN RELAYS, at the following locations: S. 20TH ST (WT410220709), W COLLEGE AV TO W WOOD AVE, (53 working days); W. CARRINGTON AV. (WT410220710), S. 19TH ST. TO S. 20TH ST. , (7 working days); S. 86TH ST. (WT410240629), 250' N/O W. BURDICK AV. TO W. OHIO AV., (11 working days); S. 85TH ST. (WT410240630), 560' N/O W. OHIO AV. TO W. OHIO AV., (12 working days); W. OHIO AV. (WT410240631), S. 84TH ST. TO S. 86TH ST., (10 working days); N. JACKSON ST. (WT410240632), E. MICHIGAN ST. TO E. WISCONSIN AV., (9 working days); W. KIEHNAU AV. (WT410240659), N. 40TH ST. TO N 43RD ST., (17 working days); N. 42ND ST. (WT410240660), W. KIEHNAU AV. TO 910' N/O W. KIEHNAU AV., (17 working days); W. HEMLOCK RD. (WT410240661), N. 51ST BL. TO W. GREENWOOD TR., (26 working days); N. 52ND ST. (WT410240662), W. HEMLOCK RD. TO W. CALUMET RD., (21 working days); W. PORTAGE AV. (WT410240663), N. 53RD ST. TO N. 55TH ST., (12 working days); (Note: Contractor to furnish and install approximately 10,430.00 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/20/2025 03:30 PM UTC
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 27-1-2025
PROJECT 1: SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & SANITARY SEWER MAIN REPAIR S. 6th St. - W. Ohio Ave. to 480’ S. of W. Ohio Ave. S. Austin St. – E. Van Norman Ave. to E. Armour Ave. N. Bartlett Ave. – E. Kane Pl. to 200’+/- NE. of E. Kane Pl. E. Howard Ave. – S. Kansas Ave. to 210’+/- E. of S. Kansas Ave. E. Howard Ave. – S. Nevada St. to S. Brust Ave. S. Kansas Ave. – E. Howard Ave. to E. Norwich Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 27-2-2025
PROJECT NO. 2: COMBINED SEWER MAIN RELAY Located at: N. 15th St. – W. Concordia Ave. to W. Keefe Ave. N. 16th St. – W. Ring St. to W. Keefe Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
8 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 62-3-2014
COMBINED AND SANITARY SEWER MAINS RELAY in: S. New York Ave. – E. Fernwood Ave. to E. Ohio Ave. E. Ohio Ave. – S. Pennsylvania Ave. to S. New York Ave. E. Wilbur Ave. – S. Alabama Ave. to S. Kansas Ave.
06/02/2014 03:30 PM UTC
OFFICIAL NOTICE 62-1-2014
COMBINED, SANITARY AND STORM SEWER MAINS LINING & REPAIR AND MANHOLE REPAIR in: S. 6th St. – W. Manitoba St. to W Euclid Ave. E. Anderson Ave. – S. 1st St. to 400’ +/- East of S.1st St. E. Tripoli Ave. – 350’ +/- East of S. Clement Ave to S. Clement
06/02/2014 03:30 PM UTC
OFFICIAL NOTICE 34-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST211140165) Asphalt Overlay by Contract; N. 54th St. – W. Capitol Dr. to W. Fond Du Lac Ave.; N. 53rd St. – W. Capitol Dr. to W. Fond Du Lac Ave.; N. 52nd St. – W. Capitol Dr. to W. Fond Du Lac Ave.; W. Keefe Ave. – N. 20th St. to N. Hopkins St.; N. 68th St. – W. Capitol Dr. to W. Hampton Ave.
05/27/2014 03:30 PM UTC
OFFICIAL NOTICE 64-1-2014
SAFETY ACADEMY DOMESTIC HOT WATER SYSTEM-SYSTEM UPGRADE 6680 NORTH TEUTONIA AVENUE MILWAUKEE, WI
05/27/2014 03:30 PM UTC
OFFICIAL NOTICE 31-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST216140103) High Impact Asphalt Overlay #3; N. Holton St. – E. Reservoir to E. North; N. Humboldt Blvd. – E. Meinecke to E. Keefe; E. Brady St. – N. Farwell to N. Water
05/22/2014 03:30 PM UTC
OFFICIAL NOTICE 56-1-2014
2014 GREEN STREET MEDIAN PROJECT - BIORETENTION FACILITY
05/22/2014 03:30 PM UTC
OFFICIAL NOTICE 35-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST211140166) Asphalt Overlay: W. Grange Ave. – S. 6th St. to S. 13th St.; S. 10th St. – W. Carpenter Ave. to W. Layton Ave.; W. Carpenter Ave. – S. 6th St. to S. 10th St.
05/21/2014 03:30 PM UTC
OFFICIAL NOTICE 32-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST216140104) S. Kinnickinnic Ave. – I-794 to E. Lincoln Ave.; S. Muskego Ave. – W. Becher St. to W. Forest Home Ave.; S. 2nd St. – W. Mineral St. to W. National Ave.
05/19/2014 03:30 PM UTC
OFFICIAL NOTICE 57-1-2014
WP-318 SOUTH FILTERED WATER RESERVOIR ROOF REPLACEMENT. PROJECT LOCATED AT 3000 NORTH LINCOLN MEMORIAL DRIVE, MILWAUKEE, WI 53211
05/14/2014 03:30 PM UTC
OFFICIAL NOTICE 59-1-2014
2014 Sidewalk - Scattered Sites
05/12/2014 03:30 PM UTC
1321 - 1330 of 1475 Solicitations
1 2 129 130 131 133 135 136 137 147 148