General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 21-1-2026
WATER MAIN RELAYS located at: W. Norwich St. (WT410230630), 200’ E/O S. 80th St. to S. 80th St. (4 working days); S. 80th St. (WT410230631), W. Van Beck Av. To W. Norwich St. (5 working days); W. Van Beck St. (WT410230632), 180’ E/O S. 80th St. to S. 80th St. (5 working days); W. Eden Ct. (WT410230649), S. Massachusetts Av. To 145’ W/O S. Massachusetts Av. (5 working days); S. Massachusetts Av. (WT410230650), W. Morgan Av. To W. Warnimont Av. (12 working days); W. Eden Pl. (WT410230651), W. Warnimont Av. To S. Massachusetts Av. (10 working days); S. 71st St. (WT410230652), S. Sunset Dr. to S. Massachusetts Av. (21 working days);, W. Wilbur Ct. (WT410230653), S. 71st St. to 140’ W/O S. 71st St. (6 working days); W. Howard Av. (WT410230678), S. 68th St. to 125’ W/O S. 69th St. (8 working days); S. 69th St. (WT410230679), W. Howard Av. to 255’ S/O W. Howard Av. (7 working days); S. Herman St. (WT410220628), E. Saveland Av. to E. Howard Av. (19 working days); W. Howard Av. (WT410250777), 235’ E/O S. Miner St. to 125’ E/O S. Miner St. (20 working days). (Note: Contractor to furnish and install approximately 5,419 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
02/05/2026 04:30 PM UTC
OFFICIAL NOTICE 28-1-2026
PROJECT NO. 1: 2026 SANITARY BYPASS PUMP REHABILITATION Located at: VARIOUS LOCATIONS
02/11/2026 04:30 PM UTC
OFFICIAL NOTICE 27-1-2026
STORM SEWER MAIN RELAY IN: SE-2785 (N. of W. Lolita Ave.) – N. 99th St. to 125’ of N. 99th St.
02/12/2026 04:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 5-1-2015
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST216150104) Asphalt Overlays: N. Van Buren St. - E. Kilbourn Ave. to E. Brady St.; E/W Pleasant St. - N. Palmer St. to N. Dr. Martin Luther King Jr. Dr.; E. Newberry Blvd. - N. Lake Dr. to N. Downer Ave.; E. Newberry Blvd. - N. Downer Ave. to N. Oakland Ave. Under this contractor has the option of submitting two (2) proposals for the Asphalt Overlay on the four locations listed. The first option, herein after referred to as Project No. 1, shall be ALL Plastic Pavement Marking. The second option, herein after referred to as Project No. 2, shall be ALL Epoxy Paint Pavement Markings. All work on both options shall be completed by August 14, 2015. Bids for one (1) or both proposals shall be submitted as separate proposals. Upon opening and reviewing of bids received, the City of Milwaukee will determine the project method reflecting the best interest of the City; a contractor will be awarded to the lowest, responsible bidder under that method. However, the contractors are hereby advised that the absolute low bidder, when considering all bids submitted, may not necessarily be awarded the contract.
02/09/2015 04:30 PM UTC
OFFICIAL NOTICE 4-1-2015
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST216150103) Asphalt Overlays: W. Locust St. - N. Fond du Lac Ave. to N. 35th St.; W. Center St. - N. 12th St. to N. 20th St.; W. Center St. - N. 35th St. to N. Sherman Blvd.; N. 27th St. - W. Townsend St. to W. Capitol Dr. Under this contractor has the option of submitting two (2) proposals for the Asphalt Overlay on the four locations listed. The first option, herein after referred to as Project No. 1, shall be ALL Plastic Pavement Marking. The second option, herein after referred to as Project No. 2, shall be ALL Epoxy Paint Pavement Markings. All work on both options shall be completed by August 14, 2015. Bids for one (1) or both proposals shall be submitted as separate proposals. Upon opening and reviewing of bids received, the City of Milwaukee will determine the project method reflecting the best interest of the City; a contractor will be awarded to the lowest, responsible bidder under that method. However, the contractors are hereby advised that the absolute low bidder, when considering all bids submitted, may not necessarily be awarded the contract.
02/06/2015 04:30 PM UTC
OFFICIAL NOTICE 2-1-2015
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST216150101) Asphalt Overlays: W. Villard Ave. – N. 51st St. to N. 60th St.; W. Villard Ave. - N. 60th St. to N. 68th St.; W. Florist Ave. – N. Teutonia to N. Sherman Blvd. Under this contractor has the option of submitting two (2) proposals for the Asphalt Overlay on the four locations listed. The first option, herein after referred to as Project No. 1, shall be ALL Plastic Pavement Marking. The second option, herein after referred to as Project No. 2, shall be ALL Epoxy Paint Pavement Markings. All work on both options shall be completed by August 14, 2015. Bids for one (1) or both proposals shall be submitted as separate proposals. Upon opening and reviewing of bids received, the City of Milwaukee will determine the project method reflecting the best interest of the City; a contractor will be awarded to the lowest, responsible bidder under that method. However, the contractors are hereby advised that the absolute low bidder, when considering all bids submitted, may not necessarily be awarded the contract.
02/05/2015 04:30 PM UTC
OFFICIAL NOTICE 3-1-2015
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST216150102) Asphalt Overlays: W. Green Tree Rd. – N. 43rd St. to N. 60th St.; N. 55th St. – W. Lisbon Ave. to W. Burleigh St.; N. 84th St. – W. Mill Road to N. Burbank Ave.; W. Keefe Ave. – N. 94th St. to N. 100th St. Under this contractor has the option of submitting two (2) proposals for the Asphalt Overlay on the four locations listed. The first option, herein after referred to as Project No. 1, shall be ALL Plastic Pavement Marking. The second option, herein after referred to as Project No. 2, shall be ALL Epoxy Paint Pavement Markings. All work on both options shall be completed by August 5, 2015. Bids for one (1) or both proposals shall be submitted as separate proposals. Upon opening and reviewing of bids received, the City of Milwaukee will determine the project method reflecting the best interest of the City; a contractor will be awarded to the lowest, responsible bidder under that method. However, the contractors are hereby advised that the absolute low bidder, when considering all bids submitted, may not necessarily be awarded the contract.
02/05/2015 04:30 PM UTC
OFFICIAL NOTICE NUMBER 11-1-2015
COMBINED SEWER MAINS RELAY, LINING, AND MANHOLE REPAIR & LINING
01/29/2015 04:30 PM UTC
OFFICIAL NOTICE NUMBER 19-1-2015
2015 Sanitary Bypass Pump & Sanitary Lift Station Inspection and Bypass Pump Testing at various locations.
01/16/2015 04:30 PM UTC
OFFICIAL NOTICE 139-1-2014
2015 SANITARY MANHOLE INSPECTION, SEWER STRUCTURES INSPECTION AND CITY UNDERGROUND CONDUIT MANHOLE INSPECTION PROJECT
01/12/2015 04:30 PM UTC
Official Notice 10-1-2015
SANITARY SEWER MAINS LINING, STORM SEWER MAINS LINING AND RELAY, AND MANHOLE REPAIR & LINING in: N. Teutonia Avenue. – W. Capitol Drive. to W. Ruby Avenue. W. Congress Street. -- 180' +/- East of N.Teutonia Avenue. to N.Teutonia Avenue.
01/09/2015 04:30 PM UTC
Official Notice 10-2-2015
COMBINED SEWER MAINS LINING, AND MANHOLE REPAIR & LINING as follows in: S. 20th Street. – W. Pierce Street. to W. National Avenue. W. National Avenue. – S. 20th Street. to S. 23rd Street. W. Orchard Street. – S. 21st Street. to S. 23rd Street. W. Pierce Street. – W. Reynolds Place. to S. 20th Street.
01/09/2015 04:30 PM UTC
OFFICIAL NOTICE 134-1-2014
2015 North 27th Street Bioretention Project in: N. 27th St. between W. Capitol Dr. and W. Roosevelt Dr.
12/30/2014 04:30 PM UTC
1281 - 1290 of 1525 Solicitations
1 2 125 126 127 129 131 132 133 152 153