General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 57-1-2025
WATER MAIN RELAYS, at the following locations: S. 20TH ST (WT410220709), W COLLEGE AV TO W WOOD AVE, (53 working days); W. CARRINGTON AV. (WT410220710), S. 19TH ST. TO S. 20TH ST. , (7 working days); S. 86TH ST. (WT410240629), 250' N/O W. BURDICK AV. TO W. OHIO AV., (11 working days); S. 85TH ST. (WT410240630), 560' N/O W. OHIO AV. TO W. OHIO AV., (12 working days); W. OHIO AV. (WT410240631), S. 84TH ST. TO S. 86TH ST., (10 working days); N. JACKSON ST. (WT410240632), E. MICHIGAN ST. TO E. WISCONSIN AV., (9 working days); W. KIEHNAU AV. (WT410240659), N. 40TH ST. TO N 43RD ST., (17 working days); N. 42ND ST. (WT410240660), W. KIEHNAU AV. TO 910' N/O W. KIEHNAU AV., (17 working days); W. HEMLOCK RD. (WT410240661), N. 51ST BL. TO W. GREENWOOD TR., (26 working days); N. 52ND ST. (WT410240662), W. HEMLOCK RD. TO W. CALUMET RD., (21 working days); W. PORTAGE AV. (WT410240663), N. 53RD ST. TO N. 55TH ST., (12 working days); (Note: Contractor to furnish and install approximately 10,430.00 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/20/2025 03:30 PM UTC
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 27-1-2025
PROJECT 1: SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & SANITARY SEWER MAIN REPAIR S. 6th St. - W. Ohio Ave. to 480’ S. of W. Ohio Ave. S. Austin St. – E. Van Norman Ave. to E. Armour Ave. N. Bartlett Ave. – E. Kane Pl. to 200’+/- NE. of E. Kane Pl. E. Howard Ave. – S. Kansas Ave. to 210’+/- E. of S. Kansas Ave. E. Howard Ave. – S. Nevada St. to S. Brust Ave. S. Kansas Ave. – E. Howard Ave. to E. Norwich Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 27-2-2025
PROJECT NO. 2: COMBINED SEWER MAIN RELAY Located at: N. 15th St. – W. Concordia Ave. to W. Keefe Ave. N. 16th St. – W. Ring St. to W. Keefe Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
8 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 88-1-2014
WATER MAIN RELAYS - W. Carmen Ave.(WT410110618), N. 62nd St. to N. 63rd St.; W. Bobolink Ave.(WT410110620), N. 60th St. to N. 61st St.; W. Oriole Dr.(WT410110623), N. 33rd St. to N. 35th St.; E. Hartford Ave.(WT410110642), N. Shepard Ave. to N. Marietta Ave.; N. Shepard Ave.(WT410110643), E. Hartford Ave. to E. Newport Ave.; W. Custer Ave.(WT410101013), N. 44th St to N. 45th St.
07/01/2014 03:30 PM UTC
OFFICIAL NOTICE 77-1-2014
SANITARY SEWER MAINS RELAY, STORM SEWER MAINS RELAY, AND SANITARY SEWER LINING in: N. 23rd St. – 110’+ North of W. Capitol Dr. to W. Hope Ave., N. 44th St. – W. Center St. to W. Locust St., N. 46th St. – W. Auer Ave. to W. Concordia Ave., N. 55th St. – W. Burleigh St. to W. Auer Ave./W. Louise Pl., N. Holton St. – 5’+ South of E. Nash St. to 30’+ North of E. Nash St., W. Lisbon Ave. – W. Center St. to N. Avondale Blvd., N. 68th St. – W. Center St. to W. Lisbon Ave.
06/27/2014 03:30 PM UTC
OFFICIAL NOTICE 76-1-2014
COMBINED SEWER MAINS RELAY AND LINING & MANHOLE REPAIR AND LINING in: S. 3rd St. – W. Greenfield Ave. to 300' south of W. Orchard St. S. 5th St. – 90' +/- north of W. Florida St. to 150' south of W. Florida St. S. 11th St. – W. Cleveland Ave. to 400' +/- south of W. Cleveland Ave. S. 17th St. – 150' +/- south of W. Becher St. to W. Grant St. S. 21st St. – W. Greenfield Ave. to W. Mitchell St. W. Arrow St. – S. Union St. to S. Comstock Ave. W. Mitchell St. – S. 20th St. to S. 21st St. W. Scott St. – S. 10th St. to S. 15th St.
06/25/2014 03:30 PM UTC
OFFICIAL NOTICE 72-1-2014
Installation of traffic calming speed humps at W. Vilter La., S. 31st St., N. 49th St., and N. 83rd St. in various Aldermanic Districts
06/23/2014 03:30 PM UTC
OFFICIAL NOTICE 75-1-2014
SANITARY, STORM, AND COMBINED SEWER MAINS RELAY, COMBINED SEWER LINING, AND SANITARY SEWER ABAONDONMENT in: S. 28th St. – W. Hayes Ave. to W. Forest Home Ave. S. 35th St. – 270’ N. of W. Mitchell St. to 300’ S. of W. Burnham St. S. 42nd St. (Various Locations) – W. Forest Home Ave. to 100’ +/- S. of W. Euclid Ave. W. Euclid Ave. – S. 42nd St. to S. 43rd St.
06/23/2014 03:30 PM UTC
OFFICIAL NOTICE 55-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALT PAVEMENT, CONCRETE WALK, CONCRETE CURB AND GUTTER, POROUS PAVEMENT, RETAINING WALL, ETC, located at (TD06780002) The Brewery Phase 4 (W. Highland Ave., W. McKinley Ave., W. Winnebago St., N. 8th St., N. 9th St., N. 10th St., N. 11th St.) ALTERNATE 1: W. Winnebago St. - N. 8th St. (ext'd) to N. 10th St. (s. of s. curb), a portion of (W. Highland Av., W. Juneau Av., W. McKinley Av., W. Winnebago St., N 8th St., N. 9th St., N 10th St., N 11th St. ALTERNATE 2: W. Highland Av. - N. 8th St. to N. 10th St. (n. of n. curb), a portion of (W. Highland Av., W. Juneau Av., W. McKinley Av., W Winnebago St., N. 8th St., N 9th St., N 10th St., N. 11th St.)
06/18/2014 03:30 PM UTC
OFFICIAL NOTICE 54-1-2014
CONSTRUCTION OF 9” CONCRETE PAVEMENT, CONCRETE WALK, CONCRETE CURB AND GUTTER, PAVEMENT REMOVAL, CURB REMOVAL, ETC, located at (ST211130136) E. Greenfield Ave. - Kinnickinnic River to S. 1st St.
06/17/2014 03:30 PM UTC
OFFICIAL NOTICE 67-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, CONCRETE WALK, CONCRETE CURB AND GUTTER, PAVEMENT REMOVAL, CURB REMOVAL, ETC, located at (ST211140146) W. Hope Ave. - N. 35th St. to N. 38th St.
06/13/2014 03:30 PM UTC
OFFICIAL NOTICE 53-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, CONCRETE WALK, CONCRETE CURB AND GUTTER, ROADWAY CUTTING, CURB REMOVAL, ETC, located at (ST211050113) N. 37th St. – W. Meinecke Av. to W. Clarke St. (also TID 40); (ST211130139) W. Lloyd St. - N. 35th St. to W. Lisbon Ave. (also TID 40)
06/11/2014 03:30 PM UTC
OFFICIAL NOTICE 29-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT,PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST216140101) High Impact Streets #1 - Asphalt Resurface by Contract; W. Cherry St. – Martin Luther King Dr. to Water St.; W. Wells St – N. 13th St. to N. 17th St.; N. 4th St. – Clybourn St. to Wisconsin Ave.
06/10/2014 03:30 PM UTC
1301 - 1310 of 1475 Solicitations
1 2 127 128 129 131 133 134 135 147 148