We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 156-1-2013
WP-308: LINNWOOD BACKUP POWER GENERATION PROJECT LOCATED AT LINNWOOD PURIFICATION PLANT, 3000 NORTH LINCOLN MEMORIAL DRIVE, MILWAUKEE, WI 53211
02/11/2014 04:30 PM UTC
OFFICIAL NOTICE 18-1-2014
GARAGE FLOORING RESTORATION MPD-6TH DISTRICT POLICE STATION 3006 SOUTH 27TH STREET MILWAUKEE, WI
02/10/2014 04:30 PM UTC
OFFICIAL NOTICE 12-1-2014
CONSTRUCTION OF ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST216130102) – High Impact Streets – Asphalt Resurface by Contract – City Wide
02/07/2014 04:30 PM UTC
OFFICIAL NOTICE 5-1-2014
CONSTRUCTION OF ASPHALTIC CONCRETE PAVEMENT, CRACKING AND SEATING PAVEMENT, REPAIR PAVEMENT JOINTS, ETC, located at (ST211130105) – N. Joseph Ave. – W. Tower Ave. to N. Pingree Ave., (ST211130108) W. Tower Ave. – W. Terra Ave. to N. 105th St. (including W. Terra Ave. – N. 102nd St. to W. Tower Ave.), (ST211130167) W. Sylvia St. – W. Villa Ave. to W. Arch Ave., (ST211130109) N. 105th St. – W. Bradley Rd. to W. Sylvia St.
02/06/2014 04:30 PM UTC
OFFICIAL NOTICE 9-1-2014
SANITARY AND STORM SEWER MAIN RELAY & LINING, AND MANHOLE CONSTRUCTION, REPAIR, & LINING IN: N. 19th Pl. – W. Courtland Ave. to W. Hampton Ave. N. 24th Pl. – 180’ +/- south of W. Hampton Ave. to 315’ +/- north of W. Hampton Ave. N. 24th St. – W. Purdue St. to W. Hampton Ave. N. 31st St. – W. Courtland Ave. to W. Hampton Ave. W. Hampton Ave. – N. Green Bay Ave. to N. 20th St. W. Hampton Ave. – N. Teutonia Ave. to 200’ +/- west of N. Teutonia Ave. W. Hampton Ave. (N/S) – N. 23rd St. to N. 24th St.
01/30/2014 04:30 PM UTC
OFFICIAL NOTICE 9-2-2014
SANITARY AND COMBINED SEWER MAIN LINING AND REPAIR, AND MANHOLE LINING AND REPAIR IN: S. 2nd St. – W. Howard Ave. to 430’ +/- south of W. Norwich St. S. 5th St. – W. Bruce St. to 200’ +/- north of W. Virginia St. S. Water St. – E. Bruce St. to E. Pierce St. S. Whitnall Ave. – E. Holt Ave. to E. Ohio Ave.
01/30/2014 04:30 PM UTC
OFFICIAL NOTICE 6-1-2014
CONSTRUCTION OF ASPHALTIC CONCRETE PAVEMENT, SUBGRADE STABILIZATION, CUTTING, ETC, located at (ST211200187) W. County Line Rd. – 100’ +/- E. of N. Swan Rd./N. 91st St. to 200’ =/- E. of N. 107th St. (Portions in the City of Mequon)
01/27/2014 04:30 PM UTC
OFFICIAL NOTICE 14-1-2014
2014 Sanitary Bypass Pump & Sanitary Lift Station Inspection and Bypass Pump Testing
01/27/2014 04:30 PM UTC
OFFICIAL NOTICE 11-1-2014
MPD-POLICE EVIDENCE WAREHOUSE FIRE SUPPRESSION SYSTEM INSTALLATION 2620 W WISCONSIN AVE MILWAUKEE, WI
01/24/2014 04:30 PM UTC
OFFICIAL NOTICE 8-1-2014
SANITARY SEWER MAIN LINING AND REPAIR, MANHOLE LINING AND REPAIR IN AREA BOUNDED BY W CONGRESS ST, W LINCOLN CREEK DR, N 51ST ST, AND N 60TH ST
01/22/2014 04:30 PM UTC