General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 55-1-2026
Kneeland Properties Infrastructure Improvement Project - 825, 907, and 1025 West Mt. Vernon Avenue, Milwaukee, WI
06/30/2026 03:30 PM UTC
OFFICIAL NOTICE 6-2-2026
PROJECT NO. 2: COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING N. 15th St. – W. Meinecke Ave. to W. Wright St. N. 15th St. – W. North Ave. to W. Meinecke Ave.
07/01/2026 03:30 PM UTC
OFFICIAL NOTICE 6-1-2026
PROJECT NO. 1: SANITARY AND STORM SEWER MAIN RELAY & SANITARY SEWER MAIN LINING. Located at: N. 42nd St. – 50’ S. of W. Courtland Ave. to 50' N. of W. Courtland Ave. N. 55th St.– W. Townsend St. to W. Keefe Ave. W. Keefe Ave.– N. 53rd St. to N. 60th St.
07/01/2026 03:30 PM UTC
OFFICIAL NOTICE 64-1-2026
MAINTENANCE SEALCOATING INCLUDING REMOVAL AND REPLACEMENT OF CONCRETE BASE, VARIABLE THICKESS ASPHALTIC CONCRETE PAVEMENT, CRACKFILL ASPHALT AND CONCRETE STREET PAVEMENTS, SEALCOAT ASPHALTIC BITUMINOUS PAVEMENTS USING A SLURRY SEAL, ETC.;
07/07/2026 03:30 PM UTC
OFFICIAL NOTICE 49-1-2026
The general work requested is: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, PAVEMENT GRINDING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, BIOSWALES, ETC.; Located at: ST211240144 – N. 89th St. – W. Silver Spring Dr. to W. Carmen Ave. ST211220178 – N. 37th St. – N. Hopkins St. to W. Hampton Ave.
07/08/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 13-1-2014
Rehabilitation of South 1st Street Bridge over the Kinnickinnic River (P-40-829), including but not limited to replacing the concrete deck; sandblasting and painting steel members; replacing expansion bearings at the abutments; concrete repairs to the abutments; encasing existing steel piles; and approach roadway work.
02/27/2014 04:30 PM UTC
OFFICIAL NOTICE 23-1-2014
COMBINED SEWERS MAIN RELAYS AND COMBINED SEWERS LINING AND MANHOLE REPAIR &LINING IN: E. Hartford Ave. from N. Cramer St. to 300’ +/- West of N. Maryland Ave. E. Kenwood Blvd. from N. Maryland Ave. to N. Downer Ave. N. Maryland Ave. from E. Kenwood Blvd. to E. Hartford Ave. N. Stowell Ave. from E. Linwood Ave. to E. Kenwood Blvd.
02/26/2014 04:30 PM UTC
OFFICIAL NOTICE 16-1-2014
CONSTRUCTION OF 8” CONCRETE PAVEMENT, PAVEMENT REMOVAL, TRACK ZONE REMOVAL, CONCRETE CURB AND GUTTER, CONCRETE WALK, STORM SEWERS, SODDING, ETC, located at (ST211130121) – N. 35th St. – W. Cameron Ave. to W. Villard Ave.
02/21/2014 04:30 PM UTC
OFFICIAL NOTICE 22-1-2014
COMBINED, SANITARY AND STORM SEWERS MAIN RELAYS IN: N. 38th St. from W. Burleigh St. to W. Fond Du Lac Ave. N. 45th St. from W. Lloyd St. to W. Lisbon Ave. N. 47th St. from W. Clarke St. to W. Center St. N. 48th St. from W. Washington Blvd to W. Garfield Ave. N. 56th St. from 225’ +/- South of W. Wright St. to W. Lisbon Ave. N. 57th St. from W. North Ave. to W. Clarke St. N. 58th St. from 280’+/- South of W. Wright St. to W. Lisbon Ave.
02/19/2014 04:30 PM UTC
OFFICIAL NOTICE 7-1-2014
CONSTRUCTION OF ASPHALTIC CONCRETE PAVEMENT, PULVERIZING PAVEMENT, CONCRETE CURB AND GUTTER, CONCRETE WALK, SODDING, ETC, located at (ST211130110) – N. 70th St. – W. Brown Deer Rd. to a point 1800’ +/- south of W. Glenbrook Rd
02/17/2014 04:30 PM UTC
OFFICIAL NOTICE 2-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, ROADWAY CUTTING, CONCRETE CURB AND GUTTER, CONCRETE WALK, SODDING, ETC, located at (ST211120121) – N. 19th St. – W. Capitol Dr. to W. Olive St., (ST21110116) N. 3rd St. – W. Auer Ave. to W. Keefe Ave. (Including replacement of speed humps (4))
02/14/2014 04:30 PM UTC
OFFICIAL NOTICE 3-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, ROADWAY CUTTING, CONCRETE CURB AND GUTTER, CONCRETE WALK, SODDING, ETC, located at (ST211120119) – S. Winona Ln. – W. Forest Home Ave. to W. Burnham St., (ST211130138) S. 14th St. – W. Harrison Ave. to W. Lincoln Ave., (ST211130111) E. Bennett Ave. – S. Kinnickinnic Ave. to S. Ellen St.
02/12/2014 04:30 PM UTC
OFFICIAL NOTICE 156-1-2013
WP-308: LINNWOOD BACKUP POWER GENERATION PROJECT LOCATED AT LINNWOOD PURIFICATION PLANT, 3000 NORTH LINCOLN MEMORIAL DRIVE, MILWAUKEE, WI 53211
02/11/2014 04:30 PM UTC
OFFICIAL NOTICE 18-1-2014
GARAGE FLOORING RESTORATION MPD-6TH DISTRICT POLICE STATION 3006 SOUTH 27TH STREET MILWAUKEE, WI
02/10/2014 04:30 PM UTC
OFFICIAL NOTICE 12-1-2014
CONSTRUCTION OF ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST216130102) – High Impact Streets – Asphalt Resurface by Contract – City Wide
02/07/2014 04:30 PM UTC
1481 - 1490 of 1588 Solicitations
1 2 145 146 147 149 151 152 153 158 159