General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 106-2-2025
WP-346 Cameron Window Improvement Project
12/17/2025 04:30 PM UTC
OFFICIAL NOTICE 106-1-2025
WP-346 Linnwood Window Improvement Project
12/17/2025 04:30 PM UTC
OFFICIAL NOTICE 108-1-2025
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, CONCRETE CURB AND GUTTER, PAVEMENT GRINDING, VARIOUS PLASTIC PAVEMENT MARKINGS, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, PINNED-ON CONCRETE TRAFFIC ISLANDS, BIOSWALES, ETC.;
12/18/2025 04:30 PM UTC
OFFICIAL NOTICE 105-1-2025
WATER MAIN RELAYS/ ALTERATIONS & LEAD SERVICE LINE REPLACEMENTS, at the following locations: N. 19th St. (WT410230614), W. Fairmount Av. To W. Eggert Pl. (22 working days); W. Eggert Pl. (WT410230615), N. 19th St. to N. 19th Pl. (9 working days); N. 19th Pl. (WT410230616), W. Fairmount Av. to W. Eggert Pl. (23 working days); N. 19th St. (WT410230617), W. Eggert Pl. to W. Villard Av. (8 working days); W. Cornell St. (WT410230640) N. 20th St. to N. Teutonia Av. (42 working days); W. Linwal La. (WT410230656) N. 22nd St. to N. 24th St. (11 working days); N. 22nd St. (WT410230657) W. Hampton Av. to W. Linwal La. (9 working days); W. Stark St. (WT410230658) N> 20th St. to N. 24th St. (12 working days); W. Custer Av. (WT410230669) N. 20th St. to 100’ W/O N. Long Island Dr. (6 working days); N. 20th St. (WT410230670) W. Custer Av. to W. Neil Pl. (9 working days); W. Neil Pl. (WT410230671) N. 20th St. to 215’ NW/O N. Long Island Dr. (21 working days); W. Pierce St. (WT410250608) S. 6th St. to S. 9th St. (43 working days); N. 51st St. (WT410250754) W. Center St. to W. Burleigh St. (4 working days); N. 60th St. (WT410250756) at W. Burleigh St. (3 working days). (Note: Contractor to furnish and install approximately 9,950 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
12/19/2025 04:30 PM UTC
OFFICIAL NOTICE 105-2-2025
WATER MAIN RELAYS/ ALTERATIONS & LEAD SERVICE LINE REPLACEMENTS, at the following locations: N. 68th St. (WT410230642), W. Grantosa Dr. to 425’ S/O W. Grantosa Dr. (9 working days); W. Herbert Av. (WT410230643), W. Tallmadge Pl. to N. 74th St. (12 working days); W. Tallmadge Pl. (WT410230644), W. Grantosa Dr. to W. Custer Av. (8 working days); W. Locust St. (WT410230645), N. 50th St. to N. 57th St. (48 working days); N. 94th St. (WT410230666), W. Center St. to 400’ NE/O W. Center St. (8 working days); W. Hadley St. (WT410230667), 320’ W/O N. 92nd St. to N. Colonial Dr. (19 working days); N. 95th St./W. Lorraine Pl./N. 97th St. (WT410230668), W. Center St. to W. Center St. (25 working days); S. Griffin Av. (WT410230696), E. Plainfield Av. to 350’ S/O E. Plainfield Av. (8 working days); S. Adams Av. (WT410230697), E. Plainfield Av. to 300’ S/O E. Plainfield Av. (9 working days); W. Appleton Av. (WT410240735), W. Hampton Av. (2 working days); N. 76th St. (WT410250601), W. Bobolink Av. to 120’ N/O W. Florist Av. (13 working days); W. Florist Av. (WT410250602), N. 76th St. to N. 77th St. (9 working days); N. 76th St. (WT410250751) W. Northridge Lakes Blvd. (3 working days); W. Becher St. (WT410250755) S. 4th St. (NEC) (2 working days) (Note: Contractor to furnish and install approximately 8,824 lin. ft. of 12”, 8”, 6”, and 4” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
12/19/2025 04:30 PM UTC
OFFICIAL NOTICE 75-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 9 CONCRETE PAVEMENT, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SPEED HUMPS, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located At: ST211220262 – In N. 39th St./N. Sercombe Rd. – W. Hope Ave. to W. Marion St.
12/30/2025 04:30 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 130-2-2013
SANITARY SEWER MAIN LINING AND REPAIR AND MANHOLE REPAIR AND LINING IN AREA BOUNDED BY E. MANITOBA AVE. TO E. WILBUR AVE. AND S. CHASE AVE. TO S. CLEMENT AVE.
08/28/2013 03:30 PM UTC
OFFICIAL NOTICE 106-1-2013
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, PAVEMENT REMOVAL, CRUSHED STONE BASE, ETC, located at (ST212050103) Alley: S. Lenox St., E. Lincoln Ave., E. Linus St., S. Woodward St., (ST212130110) Alley: W. Crawford Ave., W. Howard Ave., S. 52nd St., S. 53rd St., (ST212120111) Alley: W. Mineral St., W. National Ave., S. 21st St., S. 22nd St., (ST212130113) Alley: W. Branting Ln., W. Greenfield Ave., S. 35th St., S. 36th St.
08/27/2013 03:30 PM UTC
OFFICIAL NOTICE 102-1-2013
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CRACKING AND SEATING PAVEMENT, PAVEMENT GRINDING, CONCRETE WALK, ETC, located at (ST211060101) S. 82nd St. – W. Wilbur Ave. to W. Morgan Ave., (ST211110110) S. 63rd St. – W. Stack Dr. to W. Cleveland Ave., (ST211020105) S. 30th St. – W. Parnell Ave. to W. Wanda Ave., (ST211060157) S. 38th St. – W. Burnham St. to W. Mitchell St.
08/26/2013 03:30 PM UTC
OFFICIAL NOTICE 71-1-2013
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST211130182) Asphalt Resurface by Contract – Various Locations South Side.
08/23/2013 03:30 PM UTC
OFFICIAL NOTICE 77-1-2013
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CRACKING AND SEATING PAVEMENT, CONCRETE CURB AND GUTTER, SODDING, ETC, located at (ST211070128) S. 58th St. – W. Forest Home Ave. to W. Morgan Ave., (ST211070129) S. 58th St. – W. Morgan Ave. to Pt. N. of W. Ohio Ave.
08/22/2013 03:30 PM UTC
OFFICIAL NOTICE 108-1-2013
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, PAVEMENT REMOVAL, CRUSHED STONE BASE, SODDING, ETC, located at (ST212030130) Alley betw. W. Keefe Av., W. Townsend St., N. 55th St., N. 56th St., (ST212020107) Alley betw. W. Fairmount Av., W. Lancaster Av., N. Teutonia Av., N. 28th St., (ST212060104) Alley betw. W. Center St., W. Lorraine Pl., N. 82nd St., N. 84th St., (ST212060112) Alley betw. W. Nash St., W. Vienna Av., N. 98th St., N. 99th St.
08/22/2013 03:30 PM UTC
OFFICIAL NOTICE 129-1-2013
MILWAUKEE FIRE DEPARTMENT ENGINE HOUSES #10, #22, #32 AND #34 REROOFING MILWAUKEE, WI
08/21/2013 03:30 PM UTC
OFFICIAL NOTICE 111-1-2013
GS-23: GRANGE PUMPING STATION UPGRADES LOCATED AT 5353 SOUTH 43RD ST GREENFIELD, WI 53220
08/20/2013 03:30 PM UTC
OFFICIAL NOTICE 128-1-2013
WATER MAIN RELAYS AND HYDRANT ALTERATIONS - W. APPLETON AVE., W. HOPE AVE. TO W. CONGRESS ST.; W. APPLETON AVE., W. GLENDALE AVE. TO W. DERBY PL.; W. APPLETON AVE., W. CAPITOL DR. TO N. 107TH ST.
08/20/2013 03:30 PM UTC
Official Notice 116-1-2013
Water Main Relay in E. Greenfield Ave., S. 1st St. to 1470' E/O S. Barclay St.
08/19/2013 03:30 PM UTC
1481 - 1490 of 1518 Solicitations