General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 4-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALT CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, CONCRETE WALK, STORM SEWERS, SODDING, ETC, located at (ST211130124) N. 38th St. – W. Florist Ave. to W. Douglas Ave., (ST211130102) W. Brown St. – North-South Freeway to N. 12th St., (ST211130114) E. North Ave. – N. Humboldt Ave/Bl to N. Bremen St.
03/05/2014 04:30 PM UTC
OFFICIAL NOTICE 24-1-2014
WATER HYDRANT ALTERATIONS – S. WATER ST., E. WASHINGTON ST. TO E NATIONAL AV.; S. HOWELL AV., W. GRANGE AV. TO W. COLLEGE AV.; S. 27TH ST. 930FT N/O W. OKLAHOMA AV. TO W. HOWARD AV.; S. 60TH ST., W. ALLERTON AV. TO 1236FT S/O W. LAYTON AV.; N. LOVERS LANE RD. AT W HAMPTON AV.; N. 9TH ST. AT W. STATE ST.
03/04/2014 04:30 PM UTC
OFFICIAL NOTICE 19-1-2014
WATER MAIN RELAYS - W. FERNWOOD CIR., W. HONEY CREEK DR. TO W. HONEY CREEK DR.; S. HONEY CREEK DR., W. RIVER BEND DR. TO W. MORGAN AVE.; W. OHIO AVE., W. RIVER BEND DR. TO S. 76TH ST.; W. LAKEFIELD DR., S. 72ND ST. TO W. OKLAHOMA AVE.; S. 71ST ST., W. LAKEFIELD DR. TO W. BURDICK AVE.; S. 69TH ST., W. EUCLID AVE. TO W. OHIO AVE.
02/28/2014 04:30 PM UTC
OFFICIAL NOTICE 13-1-2014
Rehabilitation of South 1st Street Bridge over the Kinnickinnic River (P-40-829), including but not limited to replacing the concrete deck; sandblasting and painting steel members; replacing expansion bearings at the abutments; concrete repairs to the abutments; encasing existing steel piles; and approach roadway work.
02/27/2014 04:30 PM UTC
OFFICIAL NOTICE 23-1-2014
COMBINED SEWERS MAIN RELAYS AND COMBINED SEWERS LINING AND MANHOLE REPAIR &LINING IN: E. Hartford Ave. from N. Cramer St. to 300’ +/- West of N. Maryland Ave. E. Kenwood Blvd. from N. Maryland Ave. to N. Downer Ave. N. Maryland Ave. from E. Kenwood Blvd. to E. Hartford Ave. N. Stowell Ave. from E. Linwood Ave. to E. Kenwood Blvd.
02/26/2014 04:30 PM UTC
OFFICIAL NOTICE 16-1-2014
CONSTRUCTION OF 8” CONCRETE PAVEMENT, PAVEMENT REMOVAL, TRACK ZONE REMOVAL, CONCRETE CURB AND GUTTER, CONCRETE WALK, STORM SEWERS, SODDING, ETC, located at (ST211130121) – N. 35th St. – W. Cameron Ave. to W. Villard Ave.
02/21/2014 04:30 PM UTC
OFFICIAL NOTICE 22-1-2014
COMBINED, SANITARY AND STORM SEWERS MAIN RELAYS IN: N. 38th St. from W. Burleigh St. to W. Fond Du Lac Ave. N. 45th St. from W. Lloyd St. to W. Lisbon Ave. N. 47th St. from W. Clarke St. to W. Center St. N. 48th St. from W. Washington Blvd to W. Garfield Ave. N. 56th St. from 225’ +/- South of W. Wright St. to W. Lisbon Ave. N. 57th St. from W. North Ave. to W. Clarke St. N. 58th St. from 280’+/- South of W. Wright St. to W. Lisbon Ave.
02/19/2014 04:30 PM UTC
OFFICIAL NOTICE 7-1-2014
CONSTRUCTION OF ASPHALTIC CONCRETE PAVEMENT, PULVERIZING PAVEMENT, CONCRETE CURB AND GUTTER, CONCRETE WALK, SODDING, ETC, located at (ST211130110) – N. 70th St. – W. Brown Deer Rd. to a point 1800’ +/- south of W. Glenbrook Rd
02/17/2014 04:30 PM UTC
OFFICIAL NOTICE 2-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, ROADWAY CUTTING, CONCRETE CURB AND GUTTER, CONCRETE WALK, SODDING, ETC, located at (ST211120121) – N. 19th St. – W. Capitol Dr. to W. Olive St., (ST21110116) N. 3rd St. – W. Auer Ave. to W. Keefe Ave. (Including replacement of speed humps (4))
02/14/2014 04:30 PM UTC
OFFICIAL NOTICE 3-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, ROADWAY CUTTING, CONCRETE CURB AND GUTTER, CONCRETE WALK, SODDING, ETC, located at (ST211120119) – S. Winona Ln. – W. Forest Home Ave. to W. Burnham St., (ST211130138) S. 14th St. – W. Harrison Ave. to W. Lincoln Ave., (ST211130111) E. Bennett Ave. – S. Kinnickinnic Ave. to S. Ellen St.
02/12/2014 04:30 PM UTC
1491 - 1500 of 1601 Solicitations
1 2 146 147 148 150 152 153 154 160 161