General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 33-6-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 6: North Forestry District: Area approximately bounded by W Hampton Av. to North City limits
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-5-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 5: North Forestry District: Area approximately bounded by W Center St. to W Hampton Av.
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-4-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 4: Central Forestry District: Area approximately bounded by W Congress St. to W Center St. & N Sherman Blvd. to Lake Michigan
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-3-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 3: Central Forestry District: Area approximately bounded by W Center St. to W I-94
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-2-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 2: South Forestry District: Area approximately bounded by W I-94 to W Oklahoma Av.
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-1-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 1: South Forestry District: Area approximately bounded by W Oklahoma Av. to South City Limits
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 25-3-2026
Perform trunk injections of city-owned ash trees within the tree border and boulevards to mitigate the impact of Emerald Ash Borer. Work will be conducted in various locations throughout the City of Milwaukee bounded by the following geographical areas. Project 3: Area 3 - West City limits to east city limits, and approximately Villard Ave south to Capitol Dr.
03/06/2026 04:30 PM UTC
OFFICIAL NOTICE 25-2-2026
Perform trunk injections of city-owned ash trees within the tree border and boulevards to mitigate the impact of Emerald Ash Borer. Work will be conducted in various locations throughout the City of Milwaukee bounded by the following geographical areas. Project 2: Area 2 - Approximately west City Limits to the east City limits, and Mill Rd south to Villard Ave.
03/06/2026 04:30 PM UTC
OFFICIAL NOTICE 25-1-2026
Perform trunk injections of city-owned ash trees within the tree border and boulevards to mitigate the impact of Emerald Ash Borer. Work will be conducted in various locations throughout the City of Milwaukee bounded by the following geographical areas. Project 1: Approximately west City Limits to the east City limits, and County Line Rd south to Mill Rd.
03/06/2026 04:30 PM UTC
OFFICIAL NOTICE NO. 10-1-2026
Description: Construction of Handicap Concrete Ramps Per ADA Requirements, Construction Staking of Ramps, Detectable Warning Field, 5” Concrete Walk, Concrete Walk and/or Driveway, Concrete Curb & Gutter, 6” Concrete Pavement Variable Thickness Concrete Base, Variable Thickness Asphaltic Concrete Pavement, Various Concrete Removals, Sewer Work, Installation of Conduit and other Appurtenance Underground Work, ETC.; Located at: ST216250110 – ADA Ramps for 2026 High Impact Paving @ Various Locations (North Side Projects). The scope of this contract is to remove and replace designated pedestrian ramps within the limits of each of the City of Milwaukee “high impact” asphalt paving projects. The “high impact” asphalt paving projects are as follows. O.N. 12-1-26 N. 74th St. - W. Beckett Av. to W. Congress St. N. 79th St. - W. Vienna Av. to W. Melvina St. N. 84th St. - W. Cheyenne St. to W. Helena St. N. 99th St. - W. Appleton Av. to Point north of W. Carmen Av. W. Caldwell Ct. - W. Medford Av. to a Point West of W. Medford Av. W. Fairmount Av. - N. Green Bay Av. to N. Teutonia Av. N. Granville Rd. - W. Bradley Rd. to N. 107th St. W. Helena St. - N. 84th St. to N. 86th St. W. Lancaster Av. - N. 37th St. to N. Hopkins St. W. Leon Tr. - N. 76th St. to W. Silver Spring Dr. W. Medford Av. - W. Villard Av. to W. Sheridan Av. W. Park Pl. - N. 107th St. to N. 110th St. W. Stark St. - N. Sherman Bl. to N. 47th St. O.N. 13-1-26 N. 6th St. - N. Dr. Martin L. King Jr. Dr. to point north of W. Melvina St. N. 33rd St. - W. Center St. to W. Locust St. N. 33rd St. - W. North Av. to W. Meinecke Av. N. 42nd St. - W. Congress St. to W. Courtland Av. E. Albion St. - N. Farwell Av. to N. Warren Av. E. Concordia Av. - N. Humboldt Bl. to N. Pierce St. N. Hackett Av. - E. Kenwood Bl. to E. Hartford Av. N. Jefferson St. - E. Knapp St. to E. Ogden Av. W. Kilbourn Av. - N. 35th St. to point west of N. 38th St. E. Knapp St. - N. Jefferson St. to N. Broadway. W. Mc. Kinley Av. - N. 21st St. to N. 26th St. W. Nash St. - W. Scranton Pl. to N. 51st Bl. E. Park Pl. - N. Lake Dr. to N. Downer Av. W. Richardson Pl. - N. 27th St. to N. 29th St. N. Summit Av. - E. Kane Pl. to E. North Av. W./N. Toronto St. - N. 35th St. to W. Hope Av. W. Wright St. - N. Teutonia Av. to N. 19th St.
03/17/2026 03:30 PM UTC
OFFICIAL NOTICE NO. 11-1-2026
Description: Construction of Handicap Concrete Ramps Per ADA Requirements, Construction Staking of Ramps, Detectable Warning Field, 5” Concrete Walk, Concrete Walk and/or Driveway, Concrete Curb & Gutter, 6” Concrete Pavement Variable Thickness Concrete Base, Variable Thickness Asphaltic Concrete Pavement, Various Concrete Removals, Sewer Work, Installation of Conduit and other Appurtenance Underground Work, ETC.; Located at: ST216250111 – ADA Ramps for 2026 High Impact Paving @ Various Locations (South Side Projects). The scope of this contract is to remove and replace the ADA ramp on Menomonee River Pkwy/Tower View Rd. In addition, all of the pedestrian ramps within the limits of the following “high-impact” asphalt paving projects as follows: O.N. 14-1-2026 S. 52nd Pl. - W. Cleveland Av. to S. 53rd St. N. 68th St. - W. Center St. to W. Lisbon Av. N. 80th St. - W. Burleigh St. to W. Lisbon Av. N. 81st St. - W. Lorraine Pl. to W. Burleigh St. S. 89th St. - W. Howard Av. to W. Warnimont Av. S. 90th St. - W. Crawford Av. to W. Warnimont Av. N. 90th St. - W. Hawthorne Av. to W. Mt. Vernon Av. S. 91st St. - W. Morgan Av. to W. Holt Av. S. 99th St./Ct. - A point south of W. Ohio Av. to W. Oklahoma Av. W. Concordia Av. - N. 84th St. to N. 92nd St. W. Mount Ct. - N. 54th St. to N. 55th St. W. Ohio Av. - S. 97th St. to S. 99th Ct. W. St. Paul Av. - N. Hawley Rd. to N. 62nd St. O.N. 15-1-2026 S. 1st Pl.- W. Bolivar Av. to W. Waterford Av. S. 1st St. - W. Bolivar Av. to W. Waterford Av. S. 2nd St. - W. Bolivar Av. to W. Waterford Av. S. 5th Pl. - W. Armour Av. to W. Bottsford Av. S. 10th St. - W. Washington St. to W. National Av. S. 14th St. - A point south of W. Cleveland Av. to W. Cleveland Av. S. 29th St. - W. Lapham St. to W. Greenfield Av. S. 34th St. - W. Kinnickinnic River Pk. to W. Forest Home Av. S. 34th St. - W. Oklahoma Av. to W. Manitoba St. E. Armour Av. - S. Quincy Av. to S. Howell Av. E. Euclid Av. - S. Brust St. to S. Clement Av. E. Falling Heath Pl. - S. Kinnickinnic Av. to S. Pennsylvania Av. S. Hanson Av. - E. Howard Av. to E. Saveland Av. E. Malvern Pl. - S. Pennsylvania Av. to S. Kinnickinnic Av. W. Manitoba St. - S. 6th St. to S. 11th St. W. Rogers St. - S. 6th St. to Point east of S. 8th St. E. Tripoli Av. - S. Brust Av. to S. Hanson Av.
03/18/2026 03:30 PM UTC
11 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 117-1-2013
WATER MAIN RELAY - S. WHITNALL AVE., 130 FT. N/O E. HOLT AVE. TO E. HOLT AVE.; HYDRANT ALTERATION - N. MILWAUKEE ST., E. ST. PAUL AVE. TO E. CLYBOURN ST.
08/19/2013 03:30 PM UTC
OFFICIAL NOTICE 94-1-2013
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CRACKING AND SEATING PAVEMENT, PAVEMENT GRINDING, CONCRETE WALK, ETC, located at (ST211130114) E North Ave - N Humboldt Ave/Blvd to N Bremen St, (ST211130102) W Brown St - North-South Freeway to N 12th St.
08/16/2013 03:30 PM UTC
OFFICIAL NOTICE 103-1-2013
Furnish labor services & materials to provide snow and ice removal services to the Milwaukee Water Works
08/15/2013 03:30 PM UTC
OFFICIAL NOTICE 50-1-2013
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PULVERIZING PAVEMENT, PAVEMENT GRINDING, CONCRETE WALK, ETC, located at (ST21100118) S 66th St - W Euclid Ave. to W Oklahoma Ave., (ST211100101) S 1st St - Pt 170' +/- S of W Armour Ave to Pt 160' +/- N of W Allerton Ave., (ST21110124) S Logan Ave - E Norwich St to E Howard Ave (Incl S Logan Ct), (ST211090110) E Norwich St - S Herman St to S Lenox St.
08/14/2013 03:30 PM UTC
OFFICIAL NOTICE 101-1-2013
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, PAVEMENT REMOVAL, CRUSHED STONE BASE, ETC, located at (ST212130101) Alley: W. National Ave., W. Scott St., S. 31st St., S. 32nd St., (ST212130111) Alley: S. Honey Creek Dr., W. Morgan Ave., W. Verona Ct., S. 73rd St.
08/08/2013 03:30 PM UTC
OFFICIAL NOTICE 95-1-2103
CONSTRUCTION OF V.T. ASPHALT PAVEMENT, CONCRETE CURB AND GUTTER, CRACKING AND SEATING, GRADING, ETC, located at (ST211130118) N 96th St - W Carmen Ave to W Flagg Ave, (ST211130101) N 97th St - W Keefe Ave to W Lisbon Ave, (ST211120143) W Townsend St - N 54th St to N 57th St
08/06/2013 03:30 PM UTC
OFFICIAL NOTICE 104-1-2013
Water Main Relays - S. 27th St., W. Edgerton Av. to W. Clayton Crest Av.; S. 23rd St., W. Edgerton Av. to 300' S/O W. Abbott Av.; S. 23rd St., W. Clayton Crest Av. to W. Grange Av.; W. Abbott Av., S 21st St. to S. 23rd St.; W. Mallory Av., S. 22nd Pl. to S. 23rd St.; S. 22nd St., W. Abbott Av. to W. Mallory Av.; S. 22nd Pl., W. Abbott Av. to 325' S/O W. Abbott Av.; S. 21st St., W. Abbott Av. to 300' S/O W. Abbott Av.
08/01/2013 03:30 PM UTC
OFFICIAL NOTICE 93-1-2013
CONSTRUCTION OF CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER CRUSHED STONE SHOULDER, GRADING, ETC, located at (ST211130120) N 124th St - Pt N of W Brown Deer Rd to Pt S of W County Line Rd (portions in Meno Falls)
07/31/2013 03:30 PM UTC
OFFICIAL NOTICE 113-1-2013a
COMBINED AND SANITARY SEWER MAIN RELAY AND LINING AND MANHOLE REPAIR AND LINING IN VARIOUS LOCATIONS
07/29/2013 03:30 PM UTC
OFFICIAL NOTICE 113-1-2013
COMBINED AND SANITARY SEWER MAIN RELAY AND LINING AND MANHOLE REPAIR AND LINING IN VARIOUS LOCATIONS
07/29/2013 02:30 PM UTC
1511 - 1520 of 1538 Solicitations
1 2 146 147 148 149 150 152 154