General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 64-1-2026
MAINTENANCE SEALCOATING INCLUDING REMOVAL AND REPLACEMENT OF CONCRETE BASE, VARIABLE THICKESS ASPHALTIC CONCRETE PAVEMENT, CRACKFILL ASPHALT AND CONCRETE STREET PAVEMENTS, SEALCOAT ASPHALTIC BITUMINOUS PAVEMENTS USING A SLURRY SEAL, ETC.;
07/07/2026 03:30 PM UTC
OFFICIAL NOTICE 49-1-2026
The general work requested is: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, PAVEMENT GRINDING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, BIOSWALES, ETC.; Located at: ST211240144 – N. 89th St. – W. Silver Spring Dr. to W. Carmen Ave. ST211220178 – N. 37th St. – N. Hopkins St. to W. Hampton Ave.
07/08/2026 03:30 PM UTC
OFFICIAL NOTICE 65-1-2026
CRACKFILL ASPHALT AND CONCRETE STREET PAVEMENTS WITH A HOT-APPLIED ASPHALT BASED PRODUCT USED TO SEAL AND FILL CRACKS AND JOINTS. ADDITIONAL WORK INVOLVING THE FILLING OF SMALL HOLES, JOINT FAILURES, EXPOSURE OF WIRE MESH AND OTHER MINOR SURFACE DEFECTS USING HOT-APPLIED ASPHALT BASED PRODUCT AND PEA GRAVEL WILL BE REQUIRED ON ALL PAVEMENTS. ETC.;
07/14/2026 03:30 PM UTC
OFFICIAL NOTICE 53-1-2026
Police Administration Building (PAB) Parking Garage Repairs Phase 2
07/27/2026 03:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 124-1-2013
PROJECT NO. 1: CONSTRUCTION OF 7” CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, CONCRETE WALK, SODDING, ETC., located at (ST211130127) S. Pearl Street – W. Mitchell Street to S. Cesar E. Chavez Dr (Incl. W. Bow St. – S. Cesar E. Chavez Dr. to S. Pearl St. and Inters. Mod @ S. 19th St)
11/19/2013 04:30 PM UTC
OFFICIAL NOTICE 122-1-2013
PROJECT NO. 1: CONSTRUCTION OF 7” CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, CONCRETE WALK, SODDING, ETC., located at (ST211130128) S. 18th St. – W. Burnham St. to S. Pearl St.
11/18/2013 04:30 PM UTC
OFFICIAL NOTICE 122-2-2013
PROJECT NO. 2: CONSTRUCTION OF ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, CONCRETE WALK, SODDING, ETC., located at (ST211131128) S. 18th St. – W. Burnham St. to S. Pearl St.
11/18/2013 04:30 PM UTC
OFFICIAL NOTICE 154-1-2013
CHEMICAL ROOT REMOVAL IN SANITARY AND COMBINED SEWERS
11/11/2013 04:30 PM UTC
OFFICIAL NOTICE 148-1-2013
SIDEWALK SNOW/ICE REMOVAL ON CITY-OWNED PROPERTIES
10/28/2013 03:30 PM UTC
OFFICIAL NOTICE 147-1-2013
STORM SEWER INSTALLATION IN N 32ND ST - W AUER AVE TO 590' N OF W AUER AVE AND N 33RD ST - W AUER AVE TO 575' N OF W AUER AVE
10/25/2013 03:30 PM UTC
OFFICIAL NOTICE 119-1-2013
PROJECT NO. 1: CONSTRUCTION OF 7” CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, CONCRETE WALK, SODDING, ETC., located at (ST211130125) S. 26th St. – W. Scott St. to W. Pierce St.
10/21/2013 03:30 PM UTC
OFFICIAL NOTICE 119-2-2013
PROJECT NO. 2: CONSTRUCTION OF ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, CONCRETE WALK, SODDING, ETC., located at (ST211131125) S. 26th St. – W. Scott St. to W. Pierce St.
10/21/2013 03:30 PM UTC
OFFICIAL NOTICE 137-1-2013
WATER MAIN RELAYS - W. HENRY AVE., S. 21ST ST. TO S. 22ND ST.; W ALVINA AVE., S. 20TH ST. TO S. 26TH ST.; W. MANGOLD AVE., S. 20TH ST. TO S. 27TH ST.; S. 26TH ST., W. MANGOLD AVE. TO W. ALVINA AVE.
10/16/2013 03:30 PM UTC
OFFICIAL NOTICE 140-1-2013
PLUMBING SERVICES VARIOUS SITES MILWAUKEE, WI
10/09/2013 03:30 PM UTC
1521 - 1530 of 1591 Solicitations
1 2 149 150 151 153 155 156 157 158 159 160