General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 57-1-2025
WATER MAIN RELAYS, at the following locations: S. 20TH ST (WT410220709), W COLLEGE AV TO W WOOD AVE, (53 working days); W. CARRINGTON AV. (WT410220710), S. 19TH ST. TO S. 20TH ST. , (7 working days); S. 86TH ST. (WT410240629), 250' N/O W. BURDICK AV. TO W. OHIO AV., (11 working days); S. 85TH ST. (WT410240630), 560' N/O W. OHIO AV. TO W. OHIO AV., (12 working days); W. OHIO AV. (WT410240631), S. 84TH ST. TO S. 86TH ST., (10 working days); N. JACKSON ST. (WT410240632), E. MICHIGAN ST. TO E. WISCONSIN AV., (9 working days); W. KIEHNAU AV. (WT410240659), N. 40TH ST. TO N 43RD ST., (17 working days); N. 42ND ST. (WT410240660), W. KIEHNAU AV. TO 910' N/O W. KIEHNAU AV., (17 working days); W. HEMLOCK RD. (WT410240661), N. 51ST BL. TO W. GREENWOOD TR., (26 working days); N. 52ND ST. (WT410240662), W. HEMLOCK RD. TO W. CALUMET RD., (21 working days); W. PORTAGE AV. (WT410240663), N. 53RD ST. TO N. 55TH ST., (12 working days); (Note: Contractor to furnish and install approximately 10,430.00 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/20/2025 03:30 PM UTC
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 27-1-2025
PROJECT 1: SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & SANITARY SEWER MAIN REPAIR S. 6th St. - W. Ohio Ave. to 480’ S. of W. Ohio Ave. S. Austin St. – E. Van Norman Ave. to E. Armour Ave. N. Bartlett Ave. – E. Kane Pl. to 200’+/- NE. of E. Kane Pl. E. Howard Ave. – S. Kansas Ave. to 210’+/- E. of S. Kansas Ave. E. Howard Ave. – S. Nevada St. to S. Brust Ave. S. Kansas Ave. – E. Howard Ave. to E. Norwich Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 27-2-2025
PROJECT NO. 2: COMBINED SEWER MAIN RELAY Located at: N. 15th St. – W. Concordia Ave. to W. Keefe Ave. N. 16th St. – W. Ring St. to W. Keefe Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
8 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 17-1-2021
COMBINED SEWER MAIN RELAY & COMBINED SEWER LINING IN: N. 24th Pl. – 220’ +/- S. of W. Walnut St. to W. Walnut St. N. 29th St. – W. Cherry St. to W. Galena St. N. 37th St. – W. Sarnow St. to W. Lisbon Ave. N. 39th St. – W. Garfield Ave. to W. North Ave. N. 39th St. – W. Roberts St. to W. Sarnow Ave. N. 40th St. – 350’ +/- S. of W. Lisbon Ave. to W. Brown St. N. 41st St. – W. Lisbon Ave. to W. Lloyd St. W. Brown St. – N. 37th St. to N. 41st St. W. Sarnow St. – N. 35th St. to N. 36th St.
06/23/2021 03:30 PM UTC
OFFICIAL NOTICE 32-1-2021
CONSTRUCTION VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE PAVEMENT, 9” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 8” CONCRETE BASE, 5” CONCRETE WALK, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT GRINDING/MILLING, TRAFFIC SIGNALS AND LIGHTING INSTALLATION, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC WORK, ETC.; Located at: ST211140134 – West Vienna Avenue – North 35th Street to North 41st Street RE52311242 – West Silver Spring Drive (S/S) @ N. 60th Street ST211200145 – North 9th Street – West Wells Street to West State Street RE52311244 – ABB: West Michigan Street, West Wisconsin Avenue, North 27th Street, to North 27th Street
06/22/2021 03:30 PM UTC
OFFICIAL NOTICE 51-1-2021
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 1: Central Forestry District: Area approximately bounded by W. Capitol Dr. and W I-94.
06/09/2021 03:30 PM UTC
OFFICIAL NOTICE 35-1-2021
Traffic Safety Improvements
06/03/2021 03:30 PM UTC
OFFICIAL NOTICE 50-1-2021
PERMANENT PAVEMENT RESTORATION & REPLACEMENT AT STORM INLETS, CATCH BASINS, MANHOLES, AND OTHER LOCATIONS IN: Various Locations Within The City Of Milwaukee
06/02/2021 03:30 PM UTC
OFFICIAL NOTICE 44-1-2021
CONSTRUCTION VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, 6” & 7” CONCRETE DRIVEWAYS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT GRINDING/MILLING, TRAFFIC SIGNALS AND LIGHTING INSTALLATION, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC, ETC.; Located at: ST211180192 – In North 37th Street. – West Marion Street to West Congress Street. ST211190131 – In North Parkway Avenue – West Glendale Avenue to North 18th Street
06/01/2021 03:30 PM UTC
OFFICIAL NOTICE 16-1-2021
SANITARY SEWER MAIN RELAY & SANITARY SEWER LINING IN: W. Morgan Ave. – S. 15th Pl. to S. 17th St. W. Morgan Ave. – S. 86th St. to S. 91st St.
05/28/2021 03:30 PM UTC
OFFICIAL NOTICE 16-2-2021
COMBINED SEWER MAIN RELAY & COMBINED SEWER LINING & MANHOLE REPAIR AND LINING in: N. 37th Pl. - W. McKinley Ave. to W. Vliet St. N. 37th St. - W. McKinley Ave. to W. Vliet St. N. 38th St. - W. McKinley Ave. to W. Vliet St. N. 39th St. - W. McKinley Ave. to W. Vliet St. N. 40th St. - W. McKinley Ave. to W. Vliet St. W. McKinley Ave. - N. 36th St. to N. 40th St.
05/28/2021 03:30 PM UTC
OFFICIAL NOTICE 49-1-2021
DOCKWALL REPAIRS
05/19/2021 03:30 PM UTC
OFFICIAL NOTICE 45-1-2021
CONSTRUCTION OF 5” CONCRETE WALK, 7” CONCRETE DRIVEWAY, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, 7” HIGH EARLY STRENGHT CONCRETE DRIVEWAY, VARIABLE THICKNESS CONCRETE BASE, GRAVEL FILING, DETECTABLE WARNING FIELDS, MANHOLE/INLET ADJUSTMENTS, AND SODDING & TOPSOIL , CONCRETE AND OTHER REMOVALS, ETC.; Located at: ST230210163 – Area Wide Walk Replacement - Area Bounded By: South 20th Street, West Ohio Street, South 27th Street, to West Morgan Avenue
05/18/2021 03:30 PM UTC
451 - 460 of 1475 Solicitations
1 2 42 43 44 46 48 49 50 147 148