General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 24-1-2022
CONSTRUCTION VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, 7” CONCRETE DRIVEWAYS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT GRINDING/MILLING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, DETECTABLE WARNING FIELD, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC, TREES CLEARING AND GRUBBING, ETC.; Located at: ST211150128 – West Concordia Avenue - North 20th Street to North 22nd Street ST211060144 – North 23rd Street - West Keefe Avenue to West Vienna Avenue
05/05/2022 03:30 PM UTC
OFFICIAL NOTICE 17-1-2022
PROJECT NO. 1: COMBINED SEWER MAIN RELAY & NEW STORM SEWER MAIN & COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING in: Located at: W. Wright St. – N. 35th St. to N. 46th St. N. 39th St. – W. Meinecke Ave. to W. Center St. N. 40th St. – W. North Ave. to W. Meinecke Ave. N. 40th St. – W. Meinecke Ave. to W. Wright St. N. 41st St. – W. North Ave. to W. Meinecke Ave. N. Grant Blvd. – W. North Ave. to W. Clarke St. N. 44th St. – W. North Ave. to W. Meinecke Ave. N. 44th St. – W. Meinecke Ave. to W. Clarke St. N. 45th St. – W. North Ave. to W. Meinecke Ave.
05/04/2022 03:30 PM UTC
OFFICIAL NOTICE 17-2-2022
COMBINED SEWER MAIN RELAY & COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING in: N. 1st St. – E./W. Meinecke Ave. to E./W. Wright St. N. 13th St. – W. Fond Du Lac Ave. to W. Brown St. E. Clarke St. – N. 1st St. to N. Palmer St.
05/04/2022 03:30 PM UTC
OFFICIAL NOTICE 57-1-2022
Sanitary Bypass Pump Control Cabinet Replacement
05/03/2022 03:30 PM UTC
OFFICIAL NOTICE 55-1-2022
KP-55: KILBOURN PARK IMPROVEMENTS This project consists of the surface preparation of the existing American Legion Star at the Kilbourn Reservoir Park to be suitable for the resurfacing of the landmark. The resurfacing of the American Legion Star shall consists of new materials, as specified to match the previous colors. Located at: KILBOURN RESERVOIR PARK
04/29/2022 03:30 PM UTC
OFFICIAL NOTICE 54-2022
Transporting wood logs to Kettle Moraine Hardwoods
04/28/2022 03:00 PM UTC
OFFICIAL NOTICE 44-2022
RECYCLING OF RESIDENTIAL ASPHALT SHINGLES FROM THE CITY OF MILWAUKEE DROP OFF CENTERS
04/26/2022 03:30 PM UTC
OFFICIAL NOTICE 22-1-2022
CONSTRUCTION, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 8” CONCRETE BASE, 5” CONCRETE WALK, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT GRINDING/MILLING, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, PERMEABLE PAVER BLOCKS, , GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, ETC.; Located at: ST211120114 – West Ruby Avenue – North 36th Street to North Sherman Boulevard
04/22/2022 03:30 PM UTC
OFFICIAL NOTICE 39-1-2022
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded By (ABB): ST212040121 – ABB: East Linnwood Avenue, East Locust Street, North Prospect Avenue, to North Stowell Avenue ST212100104 – ABB: West Capitol Drive, West Fiebrantz Avenue, North 14th Street, to North 15th Street ST212170101 – ABB: West Center Street, North Grant Boulevard, West Hadley Street, to North 41st Street
04/21/2022 03:30 PM UTC
OFFICIAL NOTICE 60-2022
MILWAUKEE SEWER SCADA UPGRADE
04/20/2022 03:30 PM UTC
481 - 490 of 1601 Solicitations
1 2 45 46 47 49 51 52 53 160 161