General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 27-1-2025
PROJECT 1: SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & SANITARY SEWER MAIN REPAIR S. 6th St. - W. Ohio Ave. to 480’ S. of W. Ohio Ave. S. Austin St. – E. Van Norman Ave. to E. Armour Ave. N. Bartlett Ave. – E. Kane Pl. to 200’+/- NE. of E. Kane Pl. E. Howard Ave. – S. Kansas Ave. to 210’+/- E. of S. Kansas Ave. E. Howard Ave. – S. Nevada St. to S. Brust Ave. S. Kansas Ave. – E. Howard Ave. to E. Norwich Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 27-2-2025
PROJECT NO. 2: COMBINED SEWER MAIN RELAY Located at: N. 15th St. – W. Concordia Ave. to W. Keefe Ave. N. 16th St. – W. Ring St. to W. Keefe Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 45-1-2021
CONSTRUCTION OF 5” CONCRETE WALK, 7” CONCRETE DRIVEWAY, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, 7” HIGH EARLY STRENGHT CONCRETE DRIVEWAY, VARIABLE THICKNESS CONCRETE BASE, GRAVEL FILING, DETECTABLE WARNING FIELDS, MANHOLE/INLET ADJUSTMENTS, AND SODDING & TOPSOIL , CONCRETE AND OTHER REMOVALS, ETC.; Located at: ST230210163 – Area Wide Walk Replacement - Area Bounded By: South 20th Street, West Ohio Street, South 27th Street, to West Morgan Avenue
05/18/2021 03:30 PM UTC
OFFICIAL NOTICE 48-1-2021
PROJECT DESCRIPTIONWATER MAIN RELAYS, at the following locations: N. 80th St. (WT410210600), W. Marion St. to W. Congress St. (16 working days); W. Lynmar Tr. (WT410210601), W. Marion St. to N. 80th St. (12 working days); N. 80th St. (WT410210602), W. Hope Ave. to W. Lynmar Tr. (13 working days); W. Hope Ave. (WT4102021605), N. 78th St. to N. 81st St. (28 working days); W. Carmen Ave. (WT410210657), N. 55th Pl. to N. 60th St. (37 working days); W. Thurston Ave. (WT410210658), 75' E/O N 55th Pl. to N. 58th St. (37 working days); N. 55th Pl. (WT410210659), W. Thurston Ave. to W. Carmen Ave. (19 working days); N. 56th St. (WT410210660), W. Thurston Ave. to W. Carmen Ave. (20 working days); . (Note: Contractor to furnish and install approximately 6148 lin. ft. of 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
05/12/2021 03:30 PM UTC
OFFICIAL NOTICE 22-1-2021
CONSTRUCTION VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT GRINDING/MILLING, TRAFFIC SIGNALS AND LIGHTING INSTALLATION, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC, ETC.; Located at: TD0948001 – West Becher Street. – South 1St Street to The Kinnickinnic River. East Becher Street - South Kinnickinnic Avenue to South 1st Street
04/30/2021 03:30 PM UTC
OFFICIAL NOTICE 39-1-2021
WP‐329: WATER QUALITY MONITORING UPGRADES at the following locations: Florist Pumping Station, 8525 W. Florist Ave., Milwaukee, WI 53225, Lincoln Pumping Station, 3641 W. Lincoln Ave. Milwaukee, WI 53215, Hawley Road Tank, 1235 N. 57th St. Milwaukee, WI 53208 and Greenfield Tank, 8787 W. Waterford Ave, Greenfield, WI 53228.
04/29/2021 03:30 PM UTC
OFFICIAL NOTICE 42-1-2021
WATER MAIN RELAYS, at the following locations: W. Nash St. (WT410210652), N. 82nd St. to N. 87th St. (38 working days); N. 83rd St. (WT410210653), 250’ S/O W. Keefe Av. to W. Keefe Av. (38 working days); N. 85th St. (WT410210654), W. Keefe Av. to W. Vienna Av. (35 working days); N. 87th St. (WT410210655), W. Lisbon Av. to W. Melvina St. (52 working days); N. 88th St. (WT410210656), W. Vienna Av. to W. Capitol Dr. (39 working days) (Note: Contractor to furnish and install approximately 8313 lin. ft. of 16”, 12”, 8”, and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/29/2021 03:30 PM UTC
OFFICIAL NOTICE 15-1-2021
SANITARY SEWER MAIN RELAY & SANITARY SEWER LINING & MANHOLE REPAIR AND LINING IN: S. 1st St. – W. Armour Ave. to 150’+/- South of W. Armour Ave. S. 5th St. – 120’+/- North of W. Van Norman Ave. to Wilson Park Creek W. Armour Ave. – S. 1st St. to S. 5th Pl. Area Bounded By S. Howell Ave. to S. 6th St. and W. Bolivar Ave. to W. Layton Ave.
04/28/2021 03:30 PM UTC
OFFICIAL NOTICE 15-2-2021
COMBINED AND STORM SEWER MAIN RELAY in: S. 36th St. – W. Grant St. to W. Lincoln Ave. W. Clybourn St. – N. 32nd St. to N. 35th St.
04/28/2021 03:30 PM UTC
OFFICIAL NOTICE 15-3-2021
COMBINED AND SANITARY SEWER MAIN RELAY in: N. 25th St. - W. Monroe St. to W. Center St. N. 28th St. - W. Concordia Av. to W. Townsend St. N. 35th St. - W. Nash St. to W. Vienna Av. W. Concordia Av. - N. 29th St. to N. 30th St. .
04/28/2021 03:30 PM UTC
OFFICIAL NOTICE 34-1-2021
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, 8” CONCRETE PAVEMENT VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, SEWER WORK, CUC WORK, ETC.; Located at: ST216210109 – ADA RAMPS FOR 2021 HIGH IMPACT PAVING @ VARIOUS LOCATIONS
04/27/2021 03:30 PM UTC
OFFICIAL NOTICE 47-1-2021
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATIONS: Project 1: CITY-OWNED LOT AREA 1A, BOUNDED BY: Capitol Drive to north City limits and Sherman Boulevard to west City limits
04/19/2021 03:30 PM UTC
461 - 470 of 1476 Solicitations
1 2 43 44 45 47 49 50 51 147 148