General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 45-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKINGS, SEWER WORK, WATER WORK, ETC.; TD08584031 – West Pierce Street - South 6th Street to South 9th Street West Virginia Street - South 6th Street to South 9th Street TD09484011 – South 5th Place - South Chase Avenue to West Burnham Street South 6th Street - West Hayes Avenue to South Chase Avenue West Maple Street - South 2nd Street to South 4th Street
05/06/2025 03:30 PM UTC
OFFICIAL NOTICE 35-1-2025
LS-38: LINCOLN ELECTRICAL UPGRADES PROJECT ELECTRICAL WORK TO REPLACE MEDIUM VOLTAGE SWITCHGEAR LINE-UP, AUTOMATION CONTROLS CABINET, AND RESTROOM RELOCATION AT THE MILWAUKEE WATER WORKS (MWW) LINCOLN STATION
05/13/2025 03:30 PM UTC
OFFICIAL NOTICE 56-1-2025
Election Operations Center & Southwest Shop – Boiler Replacement(s)
05/14/2025 03:30 PM UTC
OFFICIAL NOTICE 32-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8 REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located At: TD11584013 – In East Michigan Street – North Cass Street to North Lincoln Memorial Drive
05/15/2025 03:30 PM UTC
OFFICIAL NOTICE 13-1-2025
South 20th Street Culvert Rehabilitation
05/21/2025 03:30 PM UTC
OFFICIAL NOTICE 4-1-2025
Street Lighting LED upgrades CRP Area C: ST320240910 – South City Limits to East/West Oklahoma Avenue, Lake Michigan to West City of Milwaukee Limits Street Lighting Upgrades (Wisconsin Department of Transportation ID No. 2984-55-74)
05/22/2025 03:30 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 57-1-2020
WATER MAIN RELAYS WITH LEAD SERVICE LINE REPLACEMENTS at the following locations: N. 33rd St. (WT410160680), W. Hadley St. to W. Locust St. (26 working days); W. Atkinson Ave. (WT410160690), 140' NW/O N Teutonia Ave. to W. Roosevelt Dr. (29 working days); W. Olive St. (WT410160691), N. 22nd St. to W. Roosevelt Dr. (33 working days); E. Locust St. (WT410160705), N. Palmer St. to N. 1st St. (13 working days); N. Palmer St. (WT410160707), E. Hadley St. to E. Locust St. (29 working days); N. Newhall St. (WT410190600), E. Locust St. to E. Linnwood Ave. (26 working days); N. 26th St. (WT410200673), W. Ruby Ave. to W. Glendale Ave. (31 working days); N. 22nd St. (WT410200689), W. Ruby Ave. to W. Cornell St. (31 working days). (Note: Contractor to furnish and install approximately 5,927 lin. ft. of 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
08/20/2020 03:30 PM UTC
OFFICIAL NOTICE 85-1-2020
WATER MAIN RELAYS, at the following locations: N. 24th St. (WT410200605), W. Rohr Ave. to W. Custer Ave. (14 working days); W. Rohr Ave. (WT410200606), 300' E/O N. 24th St. to N. 24th St. (9 working days); W. Florist Ave. (S/S) (WT410200633), N. 65th St. to N. 76th St. (101 working days); N. 71st St. (WT410200634), W. Bobolink Ave. to W. Florist Ave. (17 working days); N. 72nd St. (WT410200635), W. Bobolink Ave. to W. Florist Ave. (18 working days); N. 73rd St. (WT410200636), W. Bobolink Ave. to W. Florist Ave. (16 working days); W. Bobolink Ave. (WT410200637), N. 68th St. to N. 70th St. (15 working days); E. Kenwood Blvd. (WT410200643), N. Lake Dr. to 950' E/O N Lake Dr. (23 working days). (Note: Contractor to furnish and install approximately 8,394 lin. ft. of 16", 12", 8", 6", 4" and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
08/20/2020 03:30 PM UTC
OFFICIAL NOTICE 79-1-2020
CONSTRUCTION OF 7” CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS CRUSHED STONE BASE, CONCRETE PAVEMENT, CONCRETE AND OTHER REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211190137 – In North 23rd Street from West Center Street to West Locust Street
08/19/2020 03:30 PM UTC
Official Notice 28-1-2020
Milwaukee Police Department Third District Data Communications Server Room Cooling Modifications 2333 North 49th Street Milwaukee WI 53210
08/18/2020 03:30 PM UTC
OFFICIAL NOTICE 64-1-2020
CONSTRUCTION OF 5” CONCRETE WALK, 7” CONCRETE DRIVEWAY, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, 7” HIGH EARLY STRENGHT CONCRETE DRIVEWAY, VARIABLE THICKNESS CONCRETE BASE, GRAVEL FILING, DETECTABLE WARNING FIELDS, MANHOLE/INLET ADJUSTMENTS, AND SODDING & TOPSOIL , CONCRETE AND OTHER REMOVALS, ETC.; Located at: ST230200161 – Area Wide Bounded By: West State Street, State Truck Highway – 175, West Vliet Street, and West Highland Boulevard
08/17/2020 03:30 PM UTC
OFFICIAL NOTICE 75-1-2020
CONSTRUCTION OF 5” CONCRETE WALK, 8” CONCRETE DRIVEWAY, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, 8” HIGH EARLY STRENGHT CONCRETE DRIVEWAY, 8” CONCRETE BASE, GRAVEL FILING, DETECTABLE WARNING FIELDS, MANHOLE/INLET ADJUSTMENTS, AND SODDING & TOPSOIL , CONCRETE AND OTHER REMOVALS, ETC.; Located at: ST210020103 – In West Good Hope Road from North 60th Street to North 76th Street (Southside of West Good Hope Road only)
08/13/2020 03:30 PM UTC
OFFICIAL NOTICE 84-1-2020
WATER MAIN RELAYS, at the following locations: N. 94th St. (WT410200604), W. Bluemound Rd. to W. Wisconsin Av.(23 working days); W. Fiebrantz Av.(including Cul De Sac)(WT410200627), N. 100th St. to W. Grandtosa Dr.(20 working days); W. Beckett Av.(WT410200628), W. Ruby Av. to W. Glendale Av.(20 working days); N. Houston Av.(WT410200630), W. Congress St. to W. Courtland Av.(56 working days); W. Glendale Ct.(WT410200631), N. Houston Av. to 270’ west of N. Houston Av.(11 working days); W. Glendale Av.(WT410200632), N. 76th St. to N. 82nd St.(46 working days); N. 19th St.(WT410200655), N. McKinley Av. to W. 19th St.(14 working days). (Note: Contractor to furnish and install approximately 7356 lin. ft. of 16", 12", 8", and 4" ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposed forms.
08/12/2020 03:30 PM UTC
OFFICIAL NOTICE 86-1-2020
100 LEAD SERVICE LINE REPLACEMENTS at various locations within the City of Milwaukee.
08/12/2020 03:30 PM UTC
OFFICIAL NOTICE 78-1-2020
WATER MAIN RELAYS, at the following locations: N. 61st St. (WT410200610), W. Keefe Avenue Parkway to W. Vienna Ave. (33 working days); N. 62nd St. (WT410200611), W. Keefe Avenue Parkway to W. Nash St. (17 working days); W. Melvina St. (WT410200612), N. 60th St. to N. 65th St. (35 working days); W. Villard Ave. (WT410200613), N. 45th St. to N. 47th St. (30 working days); N. 47th St. (WT410200614), W. Villard Ave. to W. Rohr Ave. (15 working days); N. 64th St. (WT410200674), W. Keefe Avenue Parkway to W. Nash St. (15 working days). (Note: Contractor to furnish and install approximately 6,054 lin. ft. of 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
08/07/2020 03:30 PM UTC
OFFICIAL NOTICE 70-1-2020
SEALCOAT BITUMINOUS PAVEMENTS USING A SLURRY SEAL BITUMINOUS/AGGREATE MIX. SEALCOATING WILL INCLUDE SURFACE CLEANING/SWEEPING OF PAVEMENT WITH MECHANICAL SWEEPERS, INSTALL/REMOVE PROTECTIVE COVER OVER, WATER BOXES, INLETS GRATES AND MANHOLE COVERS, ETC.; Located at: ST211200121 – Sealcoating of Various Streets in the City of Milwaukee by Contract - (Slurry Seal)
07/31/2020 03:30 PM UTC
501 - 510 of 1449 Solicitations
1 2 47 48 49 51 53 54 55 144 145