General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 91-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
08/08/2025 03:30 PM UTC
OFFICIAL NOTICE 78-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; Street Lighting Upgrades for: ST3202318100 – Street Lighting Improvement for Carbon Reduction Program @ Various Locations
08/15/2025 03:30 PM UTC
OFFICIAL NOTICE 90-1-2025
CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, PAVERS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS, GRAVEL FILLING, CRUSHED GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER ALTERATIONS, STREET LIGHTING, UNDERGROUND CONDUIT, LANDSCAPING, TOPSOILING, ETC.
08/19/2025 03:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 33-1-2021
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATIONS: Project 1: CITY-OWNED LOT AREA 1A, BOUNDED BY: Capitol Drive to north City limits and Sherman Boulevard to west City limits
03/24/2021 03:30 PM UTC
OFFICIAL NOTICE 18-1-2021
The Rehabilitation of The West Cameron Avenue Bridge Over Lincoln Creek
03/23/2021 03:30 PM UTC
OFFICIAL NOTICE 24-1-2021
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, 7” CONCRETE DRIVEWAY, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE AND/OR CONCRETE DRIVEWAYS, 5” CONCRETE WALK, VARIABLE THICKNESS CRUSHED STONE BASE, SEALING PAVEMENT JOINTS AND CRACKS, PERMEABLE PAVERS, STONE BEDDING, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following alleys bounded by (BB): ST212140134 – Alley BB: West Arthur Avenue, West Harrison Avenue, South 65th Street, to South 66th Street ST212010135 – Alley BB: West Historic Mitchell Street, West Lapham Boulevard, South 8th Street, to South 9th Street ST212020121 – Alley BB: West Euclid Avenue, West Ohio Avenue, South 24th Street, to South 25th Street
03/19/2021 03:30 PM UTC
OFFICIAL NOTICE 25-1-2021
COMBINED SEWER MAIN RELAY located at: N. 26th St. - W. Brown St. to W. Meinecke Ave.
03/11/2021 04:30 PM UTC
OFFICIAL NOTICE 26-1-2021
WATER MAIN RELAYS, LEAD SERVICE RELAYS, AND HYDRANT ALTERATIONS, at the following locations: W. Layton Av. (WT410210003), S. 27th St. to S. 43rd St. (13 working days); S. 9th St. (WT410160635), W. Montana St. to W. Dakota St. (50 working days); S. 11th St.(&WE684) (WT410160636), W. Cleveland Av. to 435’ S/O W. Cleveland Av. (15 working days); E. Center St. (WT410160706), N. 1st St. to N. Hubbard St. (25 working days); N. 48th St. (WT410200675), W. Villard Av. to W. Rohr Av. (25 working days); IH41/ US45 (WT410210002), W. Burleigh St. to W. Good Hope Av. (2 working days). (Note: Contractor to furnish and install approximately 2507 lin. ft. of 16”, 12”, 8”, and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
03/08/2021 04:30 PM UTC
OFFICIAL NOTICE 27-1-2021
LEAD SERVICE LINE REPLACEMENTS
03/08/2021 04:30 PM UTC
OFFICIAL NOTICE 20-1-2021
PROJECT NO. 1: BIOSWALES IN VARIOUS TRAFFIC ISLANDS Located at: IN AREA BOUNDED BY N. CONGRESS ST., W. HARTUNG PL., N. 47TH ST. AND N. 68TH ST.
03/05/2021 04:30 PM UTC
OFFICIAL NOTICE 7-1-2021
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC.; Located at: ST216210106 – High Impact Project Locations North Hopkins Street - West Hampton Avenue to West Villard Avenue North Sherman Boulevard - West Center Street to West Burleigh Street North Swan Road - West Brown Deer Road to West County Line Road
03/04/2021 04:30 PM UTC
OFFICIAL NOTICE 13-1-2021
COMBINED SEWER MAIN RELAY Located at: N. 15th St. – W. Burleigh St. to 200’+/- S. of W. Ring St. N. 16th St. – W. Burleigh St. to W. Ring St. N. 23rd St. – W. Keefe Ave. to 100’ +/- S. of W. Nash St. W. Burleigh St. – N. 14th St. to N. Teutonia Ave. W. Finn Pl. – N. 22nd St. to N. 24th Pl.
03/03/2021 04:30 PM UTC
OFFICIAL NOTICE 13-2-2021
SANITARY AND STORM SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & MANHOLE REPAIR AND LINING in: N. 58th St. – 335’+/- S. of W. Valley Forge Dr. to W. Valley Forge Dr. N. 59th St. – W. Kilbourn Ave. to W. Valley Forge Dr. W. Valley Forge Dr. – N. Hawley Rd. to 75’+/- W. of N. 59th St.
03/03/2021 04:30 PM UTC
501 - 510 of 1491 Solicitations
1 2 47 48 49 51 53 54 55 149 150