General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 91-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
08/08/2025 03:30 PM UTC
OFFICIAL NOTICE 78-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; Street Lighting Upgrades for: ST3202318100 – Street Lighting Improvement for Carbon Reduction Program @ Various Locations
08/15/2025 03:30 PM UTC
OFFICIAL NOTICE 90-1-2025
CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, PAVERS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS, GRAVEL FILLING, CRUSHED GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER ALTERATIONS, STREET LIGHTING, UNDERGROUND CONDUIT, LANDSCAPING, TOPSOILING, ETC.
08/19/2025 03:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 74-1-2020
CONSTRUCTION VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, 8” CONCRETE PAVEMENT, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, BASE PREPARATION FOR ASPHALT SURFACES, PAVEMENT GRINDING, SEWER WORK, WATER WORK, ETC.; Located at: ST211150146 – South 20th Place - West Van Beck Avenue to West Howard Avenue ST211150147 – South 22nd Street - West Van Beck Avenue to West Howard Avenue ST211150148 – South 24th Street - West Van Beck Avenue to West Howard Avenue ST211150145 – West Van Beck Avenue - South 20th Place to South 24th Street ST211120117 – West Warnimont Avenue - West Eden Place to South Massachusetts Avenue
10/16/2020 03:30 PM UTC
OFFICIAL NOTICE 90-1-2020
ASBESTOS & HAZARDOUS MATERIALS ABATEMENT – INTERIOR DEMOLITION AT FORMER MCKINLEY SCHOOL
10/15/2020 03:30 PM UTC
OFFICIAL NOTICE 97-1-2020
ELECTRICAL SERVICES, VARIOUS LOCATIONS
10/14/2020 03:30 PM UTC
OFFICIAL NOTICE 58-1-2020
BIOSWALES in: W. Hampton Av. – N. Swan Rd. to N. 107th St.
09/15/2020 03:30 PM UTC
OFFICIAL NOTICE 76-1-2020
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, 7” CONCRETE DRIVEWAY, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE AND/OR CONCRETE DRIVEWAYS, 5” CONCRETE WALK, VARIABLE THICKNESS CRUSHED STONE DRIVEWAYS, SEALING PAVEMENT JOINTS AND CRACKS, PERMEABLE PAVERS, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following alleys bounded by: ST212140134 – Alley: West Arthur Avenue, West Harrison Avenue, South 65th Street to South 60th Street ST212010135 – Alley: West Historic Mitchell Street, West Lapham Boulevard, South 8th Street to South 9th Street ST212020121 – Alley: West Euclid Avenue, West Ohio Avenue, South 24th Street to South 25th Street
09/14/2020 03:30 PM UTC
OFFICIAL NOTICE 18-1-2020
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, 7” CONCRETE PAVEMENT VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, SEWER WORK, CUC WORK, ETC.; Located at: ST216200108 – ADA RAMPS FOR 2016 HIGH IMPACT PAVING @ VARIOUS LOCATIONS
09/14/2020 03:30 PM UTC
OFFICIAL NOTICE 81-1-2020
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, 7” CONCRETE DRIVEWAY, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE AND/OR CONCRETE DRIVEWAYS, PERMEABLE PAVERS, VARIABLE THICKNESS CRUSHED STONE DRIVEWAYS, CRACKING AND SEATING CONCRETE PAVEMENT, CONCRETE AND OTHER REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at the following alleys bounded by: ST212080107 – Alley: North Breman Street, East Center Street, North Fratney Street, and East Hadley Street ST21200123 – Alley: East Concordia Avenue, North Palmer Street, North Richards Street, and East Townsend Street ST212170104 – Alley: West Garfield Avenue, West Lloyd Street, North 51st Street, and North 52nd Street
09/11/2020 03:30 PM UTC
OFFICIAL NOTICE 94-1-2020
DINEEN PARK LAGOON DREDGING AND STREAMBANK STABILIZATION Located at: Dineen Park - in the area bounded by W. Melvina St., W. Keefe Ave., N. 62nd St., and W. Appleton Ave.
09/08/2020 03:30 PM UTC
OFFICIAL NOTICE 82-1-2020
SAFETY ACADEMY ROOF REPLACEMENT 6680 N. TEUTONIA AVENUE MILWAUKEE, WI 53209
09/04/2020 03:30 PM UTC
OFFICIAL NOTICE 69-1-2020
Crackfill asphalt and concrete street pavements with a hot-applied asphalt based product used to seal and fill cracks and joints. Additional work involving the filling of small holes, joint failures, exposure of wire mesh and other minor surface defects using hot-applied asphalt based product and pea gravel will be required on all pavements. ETC.; Located at: ST211180169 - Various Street Locations within the City of Milwaukee
09/03/2020 03:30 PM UTC
531 - 540 of 1491 Solicitations
1 2 50 51 52 54 56 57 58 149 150