General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 21-1-2026
WATER MAIN RELAYS located at: W. Norwich St. (WT410230630), 200’ E/O S. 80th St. to S. 80th St. (4 working days); S. 80th St. (WT410230631), W. Van Beck Av. To W. Norwich St. (5 working days); W. Van Beck St. (WT410230632), 180’ E/O S. 80th St. to S. 80th St. (5 working days); W. Eden Ct. (WT410230649), S. Massachusetts Av. To 145’ W/O S. Massachusetts Av. (5 working days); S. Massachusetts Av. (WT410230650), W. Morgan Av. To W. Warnimont Av. (12 working days); W. Eden Pl. (WT410230651), W. Warnimont Av. To S. Massachusetts Av. (10 working days); S. 71st St. (WT410230652), S. Sunset Dr. to S. Massachusetts Av. (21 working days);, W. Wilbur Ct. (WT410230653), S. 71st St. to 140’ W/O S. 71st St. (6 working days); W. Howard Av. (WT410230678), S. 68th St. to 125’ W/O S. 69th St. (8 working days); S. 69th St. (WT410230679), W. Howard Av. to 255’ S/O W. Howard Av. (7 working days); S. Herman St. (WT410220628), E. Saveland Av. to E. Howard Av. (19 working days); W. Howard Av. (WT410250777), 235’ E/O S. Miner St. to 125’ E/O S. Miner St. (20 working days). (Note: Contractor to furnish and install approximately 5,419 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
02/05/2026 04:30 PM UTC
OFFICIAL NOTICE 28-1-2026
PROJECT NO. 1: 2026 SANITARY BYPASS PUMP REHABILITATION Located at: VARIOUS LOCATIONS
02/11/2026 04:30 PM UTC
OFFICIAL NOTICE 27-1-2026
STORM SEWER MAIN RELAY IN: SE-2785 (N. of W. Lolita Ave.) – N. 99th St. to 125’ of N. 99th St.
02/12/2026 04:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 14-1-2021
COMBINED SEWER MAIN RELAY AND LINING Located at: S. 7th St. – W. Orchard St. to W. Lapham Blvd. S. 10th St. – W. Dakota St. to W. Manitoba St. W. Orchard St. – S. 12th St. to S. Cesar Chavez Dr.
03/30/2021 03:30 PM UTC
OFFICIAL NOTICE 14-2-2021
STORM SEWER MAIN RELAY in: N. 58th St. – 140’+/- NW. of W. Roosevelt Dr. to W. Philip Pl. N. 60th St. – 275’+/- S. of W. Philip Pl. to W. Philip Pl. N. Hopkins St. – W. Hampton Ave. to W. Stark St. W. Ruby Ave. – N. 42nd St. to N. Sherman Blvd.
03/30/2021 03:30 PM UTC
OFFICIAL NOTICE 14-3-2021
SANITARY MANHOLE AND SEWER STRUCTURES INSPECTIONS IN: Various Locations
03/30/2021 03:30 PM UTC
OFFICIAL NOTICE 5-1-2021
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, 8” CONCRETE PAVEMENT VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, SEWER WORK, CUC WORK, ETC.; Located at: ST216210104 – ADA RAMPS FOR 2021 HIGH IMPACT PAVING @ VARIOUS LOCATIONS (SOUTHSIDE PROJECTS)
03/25/2021 03:30 PM UTC
OFFICIAL NOTICE 33-1-2021
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATIONS: Project 1: CITY-OWNED LOT AREA 1A, BOUNDED BY: Capitol Drive to north City limits and Sherman Boulevard to west City limits
03/24/2021 03:30 PM UTC
OFFICIAL NOTICE 18-1-2021
The Rehabilitation of The West Cameron Avenue Bridge Over Lincoln Creek
03/23/2021 03:30 PM UTC
OFFICIAL NOTICE 24-1-2021
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, 7” CONCRETE DRIVEWAY, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE AND/OR CONCRETE DRIVEWAYS, 5” CONCRETE WALK, VARIABLE THICKNESS CRUSHED STONE BASE, SEALING PAVEMENT JOINTS AND CRACKS, PERMEABLE PAVERS, STONE BEDDING, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following alleys bounded by (BB): ST212140134 – Alley BB: West Arthur Avenue, West Harrison Avenue, South 65th Street, to South 66th Street ST212010135 – Alley BB: West Historic Mitchell Street, West Lapham Boulevard, South 8th Street, to South 9th Street ST212020121 – Alley BB: West Euclid Avenue, West Ohio Avenue, South 24th Street, to South 25th Street
03/19/2021 03:30 PM UTC
OFFICIAL NOTICE 25-1-2021
COMBINED SEWER MAIN RELAY located at: N. 26th St. - W. Brown St. to W. Meinecke Ave.
03/11/2021 04:30 PM UTC
OFFICIAL NOTICE 26-1-2021
WATER MAIN RELAYS, LEAD SERVICE RELAYS, AND HYDRANT ALTERATIONS, at the following locations: W. Layton Av. (WT410210003), S. 27th St. to S. 43rd St. (13 working days); S. 9th St. (WT410160635), W. Montana St. to W. Dakota St. (50 working days); S. 11th St.(&WE684) (WT410160636), W. Cleveland Av. to 435’ S/O W. Cleveland Av. (15 working days); E. Center St. (WT410160706), N. 1st St. to N. Hubbard St. (25 working days); N. 48th St. (WT410200675), W. Villard Av. to W. Rohr Av. (25 working days); IH41/ US45 (WT410210002), W. Burleigh St. to W. Good Hope Av. (2 working days). (Note: Contractor to furnish and install approximately 2507 lin. ft. of 16”, 12”, 8”, and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
03/08/2021 04:30 PM UTC
OFFICIAL NOTICE 27-1-2021
LEAD SERVICE LINE REPLACEMENTS
03/08/2021 04:30 PM UTC
531 - 540 of 1525 Solicitations
1 2 50 51 52 54 56 57 58 152 153