We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 4-1-2022
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, CONSTRUCTION STAKING OF RAMPS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, 7” CONCRETE PAVEMENT VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIOUS CONCRETE REMOVALS, SEWER WORK, APPURTENANCE UNDERGROUND WORK, ETC.; Located at: ST216210111 – ADA RAMPS FOR 2022 HIGH IMPACT PAVING @ VARIOUS LOCATIONS (NORTH SIDE PROJECTS) The scope of this contract is to remove and replace all of the pedestrian ramps within the limits of each of the City of Milwaukee “High Impact” asphalt paving projects. The “High Impact” asphalt paving projects are as follows: O.N. # 6-1-2022 North 56th Street - West Hampton Avenue to West Villard Avenue North 66th Street - West Port Avenue to West Bradley Road North 70th Street - West Congress Street to West Hampton Avenue North 80th Street - West Center Street to West Burleigh Street North 82nd Street - West Center Street to West Burleigh Street North 95th Street - West Silver Spring Drive to West Carmen Avenue North 104th Street - West Grantosa Drive to West Congress Street West Appleton Lane - West Florist Avenue to North 115th Street West Port Avenue - North 60th Street to North 66th Street O.N. # 7-1-2022 North 7th Street - North Doctor Martin Luther King Junior Drive to West Capitol Drive North 13th Street - A point south of West Vine Street to West Brown Street North 32nd Street - West Atkinson Avenue to West Cameron Avenue North 47th Street - West Vliet Street to West Lloyd Street North 51st Street - West Lisbon Avenue to West Center Street North Hopkins Street - West Villard Avenue to North Sherman Boulevard West Locust Street - West Appleton Avenue to West Lisbon Avenue West Melvina Street - North 46th Street to West Leon Trail
02/23/2022 04:30 PM UTC
OFFICIAL NOTICE 31-1-2022
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATION: CITY-OWNED LOT AREA 2: AREA BOUNDED BY NORTH AVENUE, WEST CITY LIMIT, CAPITOL DRIVE, AND NORTH 27TH STREET.
02/18/2022 04:30 PM UTC
OFFICIAL NOTICE 32-1-2022
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATION: CITY-OWNED LOT AREA 4 - AREA BOUNDED BY NORTH AVENUE, NORTH 20TH ST, CAPITOL DRIVE, AND NORTH 13TH ST.
02/18/2022 04:30 PM UTC
OFFICIAL NOTICE 33-1-2022
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATION: CITY-OWNED LOT AREA 5 - AREA BOUNDED BY NORTH AVENUE, NORTH 13TH ST, CAPITOL DRIVE, AND INTERSTATE 43
02/18/2022 04:30 PM UTC
OFFICIAL NOTICE 34-1-2022
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATION: CITY-OWNED LOT AREA 10 - AREA BOUNDED BY INTERSTATE 94 AND SOUTH CITY LIMIT
02/18/2022 04:30 PM UTC
Official Notice 30-1-2022
100 Lead Service Line Replacements
02/16/2022 04:30 PM UTC
OFFICIAL NOTICE 28-1-2022
WORK ON THIS PROJECT SHALL INCLUDE, BUT NOT LIMITED TO: INSTALLATION OF VARIOUS STREET LIGTHING APPURTENANCE WORK, INSTALLATION OF TEMPORARY STREET LIGHTING WOODEN POLES INSTALLATION OF TEMPORARY LIGHTING UNITS BOTH SINGLE AND DOUBLE, INSTALLATION OF CONDUIT AND CABLE, INSTALLATION OF 9” HIGH EARLY STRENGTH CONCRETE, ELECTRICAL APPURTENANCE REMOVALS, CONCRETE BASE REMOVALS, ETC.; Located at: RE5239118511 – West Good Hope Road – North Range Lind Road to 490’+/- east of North Teutonia Avenue (Rail Road Tracks) (Temporary Street Lighting)
02/14/2022 04:30 PM UTC
OFFICIAL NOTICE 27-1-2022
NEW SANITARY SEWER & SANITARY SEWER RELAY
02/10/2022 04:30 PM UTC
OFFICIAL NOTICE 11-1-2022
2022 Sanitary Bypass Pump & Sanitary Lift Station Inspection and Bypass Pump Wet Testing
02/01/2022 04:30 PM UTC
OFFICIAL NOTICE 10-1-2022
PROJECT NO. 1: SANITARY & COMBINED SEWER LINING & MANHOLE REPAIR AND LINING Alley 125 Feet E. of N. 6th St. - W. McKinley Av. to 110 Feet N. of W. McKinley Av. W. Madison St. – S. 3rd St. to S. 4th St. W. Medford Av. – W. Custer Av. to W. Sheridan Av. W. Wells St. – N. 11th St. to N. 14th St.
01/28/2022 04:30 PM UTC
521 - 530 of 1601 Solicitations