We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 21-1-2026
WATER MAIN RELAYS located at: W. Norwich St. (WT410230630), 200’ E/O S. 80th St. to S. 80th St. (4 working days); S. 80th St. (WT410230631), W. Van Beck Av. To W. Norwich St. (5 working days); W. Van Beck St. (WT410230632), 180’ E/O S. 80th St. to S. 80th St. (5 working days); W. Eden Ct. (WT410230649), S. Massachusetts Av. To 145’ W/O S. Massachusetts Av. (5 working days); S. Massachusetts Av. (WT410230650), W. Morgan Av. To W. Warnimont Av. (12 working days); W. Eden Pl. (WT410230651), W. Warnimont Av. To S. Massachusetts Av. (10 working days); S. 71st St. (WT410230652), S. Sunset Dr. to S. Massachusetts Av. (21 working days);, W. Wilbur Ct. (WT410230653), S. 71st St. to 140’ W/O S. 71st St. (6 working days); W. Howard Av. (WT410230678), S. 68th St. to 125’ W/O S. 69th St. (8 working days); S. 69th St. (WT410230679), W. Howard Av. to 255’ S/O W. Howard Av. (7 working days); S. Herman St. (WT410220628), E. Saveland Av. to E. Howard Av. (19 working days); W. Howard Av. (WT410250777), 235’ E/O S. Miner St. to 125’ E/O S. Miner St. (20 working days). (Note: Contractor to furnish and install approximately 5,419 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
02/05/2026 04:30 PM UTC
OFFICIAL NOTICE 28-1-2026
PROJECT NO. 1: 2026 SANITARY BYPASS PUMP REHABILITATION Located at: VARIOUS LOCATIONS
02/11/2026 04:30 PM UTC
OFFICIAL NOTICE 27-1-2026
STORM SEWER MAIN RELAY IN: SE-2785 (N. of W. Lolita Ave.) – N. 99th St. to 125’ of N. 99th St.
02/12/2026 04:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 12-1-2021
PROJECT NO. 1: SANITARY SEWER MAIN REPAIR & LINING AND MANHOLE REPAIR & LINING Located at: Area Bounded By S. 27th St. to S. 44th St. and W. Montana St. to W. Ohio Ave.
02/12/2021 04:30 PM UTC
OFFICIAL NOTICE 106-1-2020
WATER MAIN RELAYS, at the following locations: S. Miner St. (WT410200617), W. Fardale Av. to W. Howard Av. (12 working days); W. Fardale Av. (WT410200618), W. Loomis Rd. to S. Miner St. (21 working days); S. 33rd St. (WT410200625), W. Paine St. to W. Verona Ct. (12 working days); W. Paine St.(WT410200626), W. Lakefield Dr. to S. 33rd St. (12 working days); S. Sunset Dr. (WT410200638), W. Morgan Av. to S. Massachusetts Av. (42 working days); W. Tripoli Av. (WT410200639), S. Massachusetts Av. to S. 73rd St. (33 working days); S. 74th St. (WT41020640), W. Van Beck Av. to W. Waterford Av. (17 working days); S. 75th St. (WT410200641), W. Van Beck Av. to W. Waterford Av. (19 working days); W. Warnimont Av. (WT410200656), S. 78th St. to S. 81st St. (17 working days); S. 95th St. (WT410200668), W. Oklahoma Av. to W. Beloit Rd. (22 working days); S. 98th St. (WT410200669), W. Oklahoma Av. to W. Beloit Rd. (37 working days). (Note: Contractor to furnish and install approximately 12,692 lin. ft. of 16”, 12”, 8”, and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
01/14/2021 04:30 PM UTC
OFFICIAL NOTICE 11-1-2021
CONSTRUCTION AND INSTALLATION OF VARIOUS STREET LIGTHING APPURTENANCE WORK, STREET LIGHTING POLES, CONDUIT AND CABLE INSTALLATION, ELECTRICAL APPURTENANCE REMOVALS, 5” CONCRETE WALK REMOVAL AND REPLACEMENT, ETC.; Located at: TD05688016 – Historic Third Ward Pole and Fixture Installation in: East Chicago Street, North Milwaukee Street, & East Corcoran Street
01/13/2021 04:30 PM UTC
OFFICIAL NOTICE 10-1-2021
2021 Sanitary Bypass Pump & Sanitary Lift Station Inspection and Bypass Pump Wet Testing
01/05/2021 04:30 PM UTC
OFFICIAL NOTICE 103-1-2020
WATER MAIN RELAYS, at the following locations: W. Concordia Ave. (WT410200620), N. 89th St. to N. 98th St. (88 working days); N. 96th St. (WT410200622), N. Colonial Dr. to 240' N/O W. Auer Ave. (28 working days); N. Colonial Dr. (WT410200623), W. Auer Ave. to W. Concordia Ave. (25 working days); W. Auer Ave. (WT410200624), N. 89th St. to N. 97th St. (82 working days); E. Linnwood Ave. (WT410200642), N. Downer Ave. to N. Lake Dr. (46 working days); W. Hampton Ave. (S/S) (WT410200644), N. 84th St. to N. 90th St. (62 working days); (Note: Contractor to furnish and install approximately 11,528 lin. ft. of 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
01/04/2021 04:30 PM UTC
OFFICIAL NOTICE 96-1-2020
BIOSWALES IN N. Sherman Blvd. – W. Custer Ave. to W. Florist Ave.
12/30/2020 04:30 PM UTC
OFFICIAL NOTICE 108-1-2020
2020 SANITARY BYPASS PUMP REHABILITATION IN: VARIOUS LOACATIONS
12/23/2020 04:30 PM UTC
OFFICIAL NOTICE 98-1-2020
City Of Milwaukee DPW -City Wide Single Space Parking Meter Collection
12/22/2020 04:30 PM UTC
OFFICIAL NOTICE 105-1-2020
75 LEAD SERVICE LINE REPLACEMENTS - WINTER at various locations within the City of Milwaukee.
12/09/2020 04:30 PM UTC
OFFICIAL NOTICE 104-1-2020
UNIT HEATER REPLACEMENT CENTURY CITY BUSINESS PARK, BLDG 36
11/23/2020 04:30 PM UTC