We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 21-1-2026
WATER MAIN RELAYS located at: W. Norwich St. (WT410230630), 200’ E/O S. 80th St. to S. 80th St. (4 working days); S. 80th St. (WT410230631), W. Van Beck Av. To W. Norwich St. (5 working days); W. Van Beck St. (WT410230632), 180’ E/O S. 80th St. to S. 80th St. (5 working days); W. Eden Ct. (WT410230649), S. Massachusetts Av. To 145’ W/O S. Massachusetts Av. (5 working days); S. Massachusetts Av. (WT410230650), W. Morgan Av. To W. Warnimont Av. (12 working days); W. Eden Pl. (WT410230651), W. Warnimont Av. To S. Massachusetts Av. (10 working days); S. 71st St. (WT410230652), S. Sunset Dr. to S. Massachusetts Av. (21 working days);, W. Wilbur Ct. (WT410230653), S. 71st St. to 140’ W/O S. 71st St. (6 working days); W. Howard Av. (WT410230678), S. 68th St. to 125’ W/O S. 69th St. (8 working days); S. 69th St. (WT410230679), W. Howard Av. to 255’ S/O W. Howard Av. (7 working days); S. Herman St. (WT410220628), E. Saveland Av. to E. Howard Av. (19 working days); W. Howard Av. (WT410250777), 235’ E/O S. Miner St. to 125’ E/O S. Miner St. (20 working days). (Note: Contractor to furnish and install approximately 5,419 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
02/05/2026 04:30 PM UTC
OFFICIAL NOTICE 28-1-2026
PROJECT NO. 1: 2026 SANITARY BYPASS PUMP REHABILITATION Located at: VARIOUS LOCATIONS
02/11/2026 04:30 PM UTC
OFFICIAL NOTICE 27-1-2026
STORM SEWER MAIN RELAY IN: SE-2785 (N. of W. Lolita Ave.) – N. 99th St. to 125’ of N. 99th St.
02/12/2026 04:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 48-1-2021
PROJECT DESCRIPTIONWATER MAIN RELAYS, at the following locations: N. 80th St. (WT410210600), W. Marion St. to W. Congress St. (16 working days); W. Lynmar Tr. (WT410210601), W. Marion St. to N. 80th St. (12 working days); N. 80th St. (WT410210602), W. Hope Ave. to W. Lynmar Tr. (13 working days); W. Hope Ave. (WT4102021605), N. 78th St. to N. 81st St. (28 working days); W. Carmen Ave. (WT410210657), N. 55th Pl. to N. 60th St. (37 working days); W. Thurston Ave. (WT410210658), 75' E/O N 55th Pl. to N. 58th St. (37 working days); N. 55th Pl. (WT410210659), W. Thurston Ave. to W. Carmen Ave. (19 working days); N. 56th St. (WT410210660), W. Thurston Ave. to W. Carmen Ave. (20 working days); . (Note: Contractor to furnish and install approximately 6148 lin. ft. of 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
05/12/2021 03:30 PM UTC
OFFICIAL NOTICE 22-1-2021
CONSTRUCTION VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT GRINDING/MILLING, TRAFFIC SIGNALS AND LIGHTING INSTALLATION, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC, ETC.; Located at: TD0948001 – West Becher Street. – South 1St Street to The Kinnickinnic River. East Becher Street - South Kinnickinnic Avenue to South 1st Street
04/30/2021 03:30 PM UTC
OFFICIAL NOTICE 39-1-2021
WP‐329: WATER QUALITY MONITORING UPGRADES at the following locations: Florist Pumping Station, 8525 W. Florist Ave., Milwaukee, WI 53225, Lincoln Pumping Station, 3641 W. Lincoln Ave. Milwaukee, WI 53215, Hawley Road Tank, 1235 N. 57th St. Milwaukee, WI 53208 and Greenfield Tank, 8787 W. Waterford Ave, Greenfield, WI 53228.
04/29/2021 03:30 PM UTC
OFFICIAL NOTICE 42-1-2021
WATER MAIN RELAYS, at the following locations: W. Nash St. (WT410210652), N. 82nd St. to N. 87th St. (38 working days); N. 83rd St. (WT410210653), 250’ S/O W. Keefe Av. to W. Keefe Av. (38 working days); N. 85th St. (WT410210654), W. Keefe Av. to W. Vienna Av. (35 working days); N. 87th St. (WT410210655), W. Lisbon Av. to W. Melvina St. (52 working days); N. 88th St. (WT410210656), W. Vienna Av. to W. Capitol Dr. (39 working days) (Note: Contractor to furnish and install approximately 8313 lin. ft. of 16”, 12”, 8”, and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/29/2021 03:30 PM UTC
OFFICIAL NOTICE 15-1-2021
SANITARY SEWER MAIN RELAY & SANITARY SEWER LINING & MANHOLE REPAIR AND LINING IN: S. 1st St. – W. Armour Ave. to 150’+/- South of W. Armour Ave. S. 5th St. – 120’+/- North of W. Van Norman Ave. to Wilson Park Creek W. Armour Ave. – S. 1st St. to S. 5th Pl. Area Bounded By S. Howell Ave. to S. 6th St. and W. Bolivar Ave. to W. Layton Ave.
04/28/2021 03:30 PM UTC
OFFICIAL NOTICE 15-2-2021
COMBINED AND STORM SEWER MAIN RELAY in: S. 36th St. – W. Grant St. to W. Lincoln Ave. W. Clybourn St. – N. 32nd St. to N. 35th St.
04/28/2021 03:30 PM UTC
OFFICIAL NOTICE 15-3-2021
COMBINED AND SANITARY SEWER MAIN RELAY in: N. 25th St. - W. Monroe St. to W. Center St. N. 28th St. - W. Concordia Av. to W. Townsend St. N. 35th St. - W. Nash St. to W. Vienna Av. W. Concordia Av. - N. 29th St. to N. 30th St. .
04/28/2021 03:30 PM UTC
OFFICIAL NOTICE 34-1-2021
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, 8” CONCRETE PAVEMENT VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, SEWER WORK, CUC WORK, ETC.; Located at: ST216210109 – ADA RAMPS FOR 2021 HIGH IMPACT PAVING @ VARIOUS LOCATIONS
04/27/2021 03:30 PM UTC
OFFICIAL NOTICE 47-1-2021
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATIONS: Project 1: CITY-OWNED LOT AREA 1A, BOUNDED BY: Capitol Drive to north City limits and Sherman Boulevard to west City limits
04/19/2021 03:30 PM UTC
OFFICIAL NOTICE 47-2-2021
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATIONS: PROJECT 2: CITY-OWNED LOT AREA 3, bounded by North Avenue, N. 27th Street, Capitol Drive, and N. 20th Street
04/19/2021 03:30 PM UTC
511 - 520 of 1525 Solicitations