General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 27-1-2025
PROJECT 1: SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & SANITARY SEWER MAIN REPAIR S. 6th St. - W. Ohio Ave. to 480’ S. of W. Ohio Ave. S. Austin St. – E. Van Norman Ave. to E. Armour Ave. N. Bartlett Ave. – E. Kane Pl. to 200’+/- NE. of E. Kane Pl. E. Howard Ave. – S. Kansas Ave. to 210’+/- E. of S. Kansas Ave. E. Howard Ave. – S. Nevada St. to S. Brust Ave. S. Kansas Ave. – E. Howard Ave. to E. Norwich Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 27-2-2025
PROJECT NO. 2: COMBINED SEWER MAIN RELAY Located at: N. 15th St. – W. Concordia Ave. to W. Keefe Ave. N. 16th St. – W. Ring St. to W. Keefe Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 104-1-2020
UNIT HEATER REPLACEMENT CENTURY CITY BUSINESS PARK, BLDG 36
11/23/2020 04:30 PM UTC
OFFICIAL NOTICE 89-1-2020
CONSTRUCTION OF 7” CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS CRUSHED STONE BASE, CONCRETE PAVEMENT, CONCRETE AND OTHER REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211190137 – In North 23rd Street from West Wright Street to West Center Street
11/19/2020 04:30 PM UTC
OFFICIAL NOTICE 99-1-2020
ZEIDLER MUNICIPAL BUILDING, 2ND FLOOR, HEALTH LAB HVAC UPGRADES
10/30/2020 03:30 PM UTC
OFFICIAL NOTICE 49-1-2020
SANITARY SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & MANHOLE REPAIR AND LINING. N. 50th St. - W. State St. to W. Juneau Ave. W. State St. - N. 46th St. to 450’ +/- W. of N. 50th Pl.
10/29/2020 03:30 PM UTC
OFFICIAL NOTICE 88-1-2020
CONSTRUCTION VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 8” CONCRETE BASE, 6” CONCRETE BASE, 7” CONCRETE PAVEMENT, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, BASE PREPARATION FOR ASPHALT SURFACES, PAVEMENT GRINDING, SEWER WORK, WATER WORK, ETC.; Located at: ST211190133 – North 24th Street; West Brown Street to West Garfield Avenue ST211160102– North 44th Street; West Villard Avenue to West Custer Avenue
10/21/2020 03:30 PM UTC
OFFICIAL NOTICE 74-1-2020
CONSTRUCTION VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, 8” CONCRETE PAVEMENT, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, BASE PREPARATION FOR ASPHALT SURFACES, PAVEMENT GRINDING, SEWER WORK, WATER WORK, ETC.; Located at: ST211150146 – South 20th Place - West Van Beck Avenue to West Howard Avenue ST211150147 – South 22nd Street - West Van Beck Avenue to West Howard Avenue ST211150148 – South 24th Street - West Van Beck Avenue to West Howard Avenue ST211150145 – West Van Beck Avenue - South 20th Place to South 24th Street ST211120117 – West Warnimont Avenue - West Eden Place to South Massachusetts Avenue
10/16/2020 03:30 PM UTC
OFFICIAL NOTICE 90-1-2020
ASBESTOS & HAZARDOUS MATERIALS ABATEMENT – INTERIOR DEMOLITION AT FORMER MCKINLEY SCHOOL
10/15/2020 03:30 PM UTC
OFFICIAL NOTICE 97-1-2020
ELECTRICAL SERVICES, VARIOUS LOCATIONS
10/14/2020 03:30 PM UTC
OFFICIAL NOTICE 58-1-2020
BIOSWALES in: W. Hampton Av. – N. Swan Rd. to N. 107th St.
09/15/2020 03:30 PM UTC
OFFICIAL NOTICE 76-1-2020
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, 7” CONCRETE DRIVEWAY, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE AND/OR CONCRETE DRIVEWAYS, 5” CONCRETE WALK, VARIABLE THICKNESS CRUSHED STONE DRIVEWAYS, SEALING PAVEMENT JOINTS AND CRACKS, PERMEABLE PAVERS, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following alleys bounded by: ST212140134 – Alley: West Arthur Avenue, West Harrison Avenue, South 65th Street to South 60th Street ST212010135 – Alley: West Historic Mitchell Street, West Lapham Boulevard, South 8th Street to South 9th Street ST212020121 – Alley: West Euclid Avenue, West Ohio Avenue, South 24th Street to South 25th Street
09/14/2020 03:30 PM UTC
511 - 520 of 1476 Solicitations
1 2 48 49 50 52 54 55 56 147 148