General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 21-1-2026
WATER MAIN RELAYS located at: W. Norwich St. (WT410230630), 200’ E/O S. 80th St. to S. 80th St. (4 working days); S. 80th St. (WT410230631), W. Van Beck Av. To W. Norwich St. (5 working days); W. Van Beck St. (WT410230632), 180’ E/O S. 80th St. to S. 80th St. (5 working days); W. Eden Ct. (WT410230649), S. Massachusetts Av. To 145’ W/O S. Massachusetts Av. (5 working days); S. Massachusetts Av. (WT410230650), W. Morgan Av. To W. Warnimont Av. (12 working days); W. Eden Pl. (WT410230651), W. Warnimont Av. To S. Massachusetts Av. (10 working days); S. 71st St. (WT410230652), S. Sunset Dr. to S. Massachusetts Av. (21 working days);, W. Wilbur Ct. (WT410230653), S. 71st St. to 140’ W/O S. 71st St. (6 working days); W. Howard Av. (WT410230678), S. 68th St. to 125’ W/O S. 69th St. (8 working days); S. 69th St. (WT410230679), W. Howard Av. to 255’ S/O W. Howard Av. (7 working days); S. Herman St. (WT410220628), E. Saveland Av. to E. Howard Av. (19 working days); W. Howard Av. (WT410250777), 235’ E/O S. Miner St. to 125’ E/O S. Miner St. (20 working days). (Note: Contractor to furnish and install approximately 5,419 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
02/05/2026 04:30 PM UTC
OFFICIAL NOTICE 28-1-2026
PROJECT NO. 1: 2026 SANITARY BYPASS PUMP REHABILITATION Located at: VARIOUS LOCATIONS
02/11/2026 04:30 PM UTC
OFFICIAL NOTICE 27-1-2026
STORM SEWER MAIN RELAY IN: SE-2785 (N. of W. Lolita Ave.) – N. 99th St. to 125’ of N. 99th St.
02/12/2026 04:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 64-1-2020
CONSTRUCTION OF 5” CONCRETE WALK, 7” CONCRETE DRIVEWAY, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, 7” HIGH EARLY STRENGHT CONCRETE DRIVEWAY, VARIABLE THICKNESS CONCRETE BASE, GRAVEL FILING, DETECTABLE WARNING FIELDS, MANHOLE/INLET ADJUSTMENTS, AND SODDING & TOPSOIL , CONCRETE AND OTHER REMOVALS, ETC.; Located at: ST230200161 – Area Wide Bounded By: West State Street, State Truck Highway – 175, West Vliet Street, and West Highland Boulevard
08/17/2020 03:30 PM UTC
OFFICIAL NOTICE 75-1-2020
CONSTRUCTION OF 5” CONCRETE WALK, 8” CONCRETE DRIVEWAY, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, 8” HIGH EARLY STRENGHT CONCRETE DRIVEWAY, 8” CONCRETE BASE, GRAVEL FILING, DETECTABLE WARNING FIELDS, MANHOLE/INLET ADJUSTMENTS, AND SODDING & TOPSOIL , CONCRETE AND OTHER REMOVALS, ETC.; Located at: ST210020103 – In West Good Hope Road from North 60th Street to North 76th Street (Southside of West Good Hope Road only)
08/13/2020 03:30 PM UTC
OFFICIAL NOTICE 84-1-2020
WATER MAIN RELAYS, at the following locations: N. 94th St. (WT410200604), W. Bluemound Rd. to W. Wisconsin Av.(23 working days); W. Fiebrantz Av.(including Cul De Sac)(WT410200627), N. 100th St. to W. Grandtosa Dr.(20 working days); W. Beckett Av.(WT410200628), W. Ruby Av. to W. Glendale Av.(20 working days); N. Houston Av.(WT410200630), W. Congress St. to W. Courtland Av.(56 working days); W. Glendale Ct.(WT410200631), N. Houston Av. to 270’ west of N. Houston Av.(11 working days); W. Glendale Av.(WT410200632), N. 76th St. to N. 82nd St.(46 working days); N. 19th St.(WT410200655), N. McKinley Av. to W. 19th St.(14 working days). (Note: Contractor to furnish and install approximately 7356 lin. ft. of 16", 12", 8", and 4" ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposed forms.
08/12/2020 03:30 PM UTC
OFFICIAL NOTICE 86-1-2020
100 LEAD SERVICE LINE REPLACEMENTS at various locations within the City of Milwaukee.
08/12/2020 03:30 PM UTC
OFFICIAL NOTICE 78-1-2020
WATER MAIN RELAYS, at the following locations: N. 61st St. (WT410200610), W. Keefe Avenue Parkway to W. Vienna Ave. (33 working days); N. 62nd St. (WT410200611), W. Keefe Avenue Parkway to W. Nash St. (17 working days); W. Melvina St. (WT410200612), N. 60th St. to N. 65th St. (35 working days); W. Villard Ave. (WT410200613), N. 45th St. to N. 47th St. (30 working days); N. 47th St. (WT410200614), W. Villard Ave. to W. Rohr Ave. (15 working days); N. 64th St. (WT410200674), W. Keefe Avenue Parkway to W. Nash St. (15 working days). (Note: Contractor to furnish and install approximately 6,054 lin. ft. of 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
08/07/2020 03:30 PM UTC
OFFICIAL NOTICE 70-1-2020
SEALCOAT BITUMINOUS PAVEMENTS USING A SLURRY SEAL BITUMINOUS/AGGREATE MIX. SEALCOATING WILL INCLUDE SURFACE CLEANING/SWEEPING OF PAVEMENT WITH MECHANICAL SWEEPERS, INSTALL/REMOVE PROTECTIVE COVER OVER, WATER BOXES, INLETS GRATES AND MANHOLE COVERS, ETC.; Located at: ST211200121 – Sealcoating of Various Streets in the City of Milwaukee by Contract - (Slurry Seal)
07/31/2020 03:30 PM UTC
OFFICIAL NOTICE 46-1-2020
SANITARY SEWER MAIN RELAY IN: S. 64th St. – W. Main St. to W. Dickinson St. S. 67th St. – W. Dixon St. to 265’ +/- South of W. Dixon St. S. 68th St. – 330’ +/- North of W. Main St. to W. Main St. N. 68th St. – W. Stevenson St. to 275’ +/- North of W. Stevenson St. N. 76th St. – 300’ +/- South of W. Stevenson St. to W. Stevenson St. S. 80th St. – 290’ +/- North of W. O’Connor St. to W. O’Connor St. N. 80th St. – W. Fairview Ave. to W. Stevenson St. W. Adler St. – 60’ +/- East of S. 59th St. to S. 62nd St.
07/30/2020 03:30 PM UTC
OFFICIAL NOTICE 45-1-2020
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, 7” CONCRETE DRIVEWAY, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE AND/OR CONCRETE DRIVEWAYS, PERMEABLE PAVERS, VARIABLE THICKNESS CRUSHED STONE DRIVEWAYS, CRACKING AND SEATING CONCRETE PAVEMENT, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at: ST212010142 – Alley: West Lloyd Street, West North Avenue, North 14th Street, and North 15th Street ST212040101 – Alley: West Auer Avenue, West Burleigh Street, North 80th Street, and North 81st Street ST212160106 – Alley: West Douglas Avenue, West Kaul Avenue, North 37th Street, and North 38th Street
07/29/2020 03:30 PM UTC
Official Notice 83-1-2020
POURED-IN-PLACE RESILIENT RUBBER SURFACE INSTALLATION VARIOUS LOCATIONS MILWAUKEE WI
07/27/2020 03:30 PM UTC
OFFICIAL NOTICE 80-1-2020
WATER MAIN RELAYS, at the following locations: W. Ohio Ave. (WT410200681), S. 53rd St. to S. 55th St. (18 working days); S. 55th St. (WT410200682), W. Holt Ave. to W. Morgan Ave. (18 working days); W. Verona Ct. (WT410200683), 250' E/O S 55th St. to S. 55th St. (11 working days); W. Holt Ave. (WT410200684), S. 55th St. to S. 60th St. (30 working days); S. 58th St. (WT410200685), 425' N/O W Holt Ave. to W. Holt Ave. (16 working days). (Note: Contractor to furnish and install approximately 3,280 lin. ft. of 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
07/21/2020 03:30 PM UTC
581 - 590 of 1525 Solicitations
1 2 55 56 57 59 61 62 63 152 153