General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 12-1-2026
The general work requested is: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC. Located at: ST216260101 – 2026 HIP Group 2 (North-West) N. 74th St. - W. Beckett Av. to W. Congress St. N. 79th St. - W. Vienna Av. to W. Melvina St. N. 84th St. - W. Cheyenne St. to W. Helena St. N. 99th St. - W. Appleton Av. to Point north of W. Carmen Av. W. Caldwell Ct. - W. Medford Av. to a Point West of W. Medford Av. W. Fairmount Av. - N. Green Bay Av. to N. Teutonia Av. (retain speed humps) N. Granville Rd. - W. Bradley Rd. to N. 107th St. (paved pedestrian lane on one side) W. Helena St. - N. 84th St. to N. 86th St. W. Lancaster Av. - N. 37th St. to N. Hopkins St. W. Leon Tr. - N. 76th St. to W. Silver Spring Dr. W. Medford Av. - W. Villard Av. to W. Sheridan Av. W. Park Pl. - N. 107th St. to N. 110th St. W. Stark St. - N. Sherman Bl. to N. 47th St.
05/11/2026 03:30 PM UTC
OFFICIAL NOTICE 52-1-2026
CONCRETE SURFACE REPAIRS AND PAINTING OF THE LOWER LEVEL OF MACARTHUR SQUARE PARKING STRUCTURE.
05/12/2026 03:30 PM UTC
OFFICIAL NOTICE 13-1-2026
The general work requested is: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC. Located at: ST216260102 – 2026 HIP Group 3 (East) N. 6th St. - N. Dr. Martin L. King Jr. Dr. to point north of W. Melvina St. N. 33rd St. - W. Center St. to W. Locust St. N. 33rd St. - W. North Av. to W. Meinecke Av. (retain speed humps) N. 42nd St. - W. Congress St. to W. Courtland Av. E. Albion St. - N. Farwell Av. to N. Warren Av. E. Concordia Av. - N. Humboldt Bl. to N. Pierce St. N. Hackett Av. - E. Kenwood Bl. to E. Hartford Av. N. Jefferson St. - E. Knapp St. to E. Ogden Av. (retain speed hump) W. Kilbourn Av. - N. 35th St. to point west of N. 38th St. E. Knapp St. - N. Jefferson St. to N. Broadway (retain speed hump) W. Mc. Kinley Av. - N. 21st St. to N. 26th St. (retain speed humps) W. Nash St. - W. Scranton Pl. to N. 51st Bl. E. Park Pl. - N. Lake Dr. to N. Downer Av. W. Richardson Pl. - N. 27th St. to N. 29th St. (retain speed humps) N. Summit Av. - E. Kane Pl. to E. North Av. W./N. Toronto St. - N. 35th St. to W. Hope Av. W. Wright St. - N. Teutonia Av. to N. 19th St.
05/13/2026 03:30 PM UTC
OFFICIAL NOTICE 40-1-2026
Granville Station Public Water Main Extension/Private Water Loop Extension - West Menard Road/North 80TH Street/8110 & 8120 West Brown Deer Road/Former Northridge Mall Property, Milwaukee, WI.
05/15/2026 03:30 PM UTC
OFFICIAL NOTICE 59-1-2026
Remote Bridge Upgrades at Multiple Structures over Milwaukee River
05/19/2026 03:30 PM UTC
OFFICIAL NOTICE 54-1-2026
PROJECT NO.1: SANITARY SEWER LATERAL AND LEAD SERVICE LINE REPLACEMENT & SUMP PUMP INSTALLATION IN: Area Bounded by North 54th Street to North 58th Street and West Vienna Avenue to West Capitol Drive
05/20/2026 03:30 PM UTC
OFFICIAL NOTICE 54-2-2026
PROJECT NO.2: SANITARY SEWER MANHOLE INSPECTION: Located at: Various Locations within the City of Milwaukee
05/20/2026 03:30 PM UTC
OFFICIAL NOTICE 31-1-2026
The general work requested is: THE INSTALLATION OF NON-INTRUSIVE DETECTION CAMERAS AT EXISTING SIGNALIZED INTERSECTIONS. Non-Intrusive Detection Grant 4 – ST320233401 Located at: 15 INTERSECTIONS, NORTH SIDE IN THE CITY OF MILWAUKEE (Wisconsin Department of Transportation ID No. 2984-29-94)
05/27/2026 03:30 PM UTC
OFFICIAL NOTICE 56-1-2026
46TH AND STATE STREET – RETAINING WALL REPLACEMENT
05/28/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
06/02/2026 03:30 PM UTC
10 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 19-1-2021
ASBESTOS & HAZARDOUS MATERIALS ABATEMENT – SELECT INTERIOR DEMOLITION
02/22/2021 04:30 PM UTC
OFFICIAL NOTICE 4-1-2021
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, 8” CONCRETE PAVEMENT VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, SEWER WORK, CUC WORK, ETC.; Located at: ST216210103 – ADA RAMPS FOR 2021 HIGH IMPACT PAVING @ VARIOUS LOCATIONS (NORTHSIDE PROJECTS)
02/19/2021 04:30 PM UTC
OFFICIAL NOTICE 2-1-2021
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, CONSTRUCTION STAKING OF RAMPS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, 7” CONCRETE PAVEMENT VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, SEWER WORK, CUC WORK, ETC.; Located at: ST216200108 – ADA RAMPS FOR 2016 HIGH IMPACT PAVING NORTHSIDE PROJECTS @ THE FOLLOWING LOCATIONS: - West Lisbon Ave./West Walnut Street - North 20th Street to North 31st Street - 35 corners - West Atkinson Avenue - West Keefe Avenue to North Teutonia Avenue - 67 corners - Ruby Yard - West Congress Avenue to North 30th Street) - 4 corners - West Roosevelt Drive – North 36th Street to West Fond Du Lac Avenue - 38 corners - West Villard Avenue – North 43rd Street to North 51st Street - 25 corners - North 37th Street- West Townsend Avenue to West Fond Du Lac Avenue - 22 corners - North 51st Boulevard- West Fond Du Lac Avenue to West Hampton Avenue- 17 corners - North 85th Street – West Capitol Drive to West hope Avenue- 7 corners - North 87th Court – West Fiebrantz Avenue to a point North - 4 corners - North 88th Street – West Fiebrantz Avenue to West Olive Street - 10 corners - North 92nd Street – West Lisbon Avenue to West Capitol Drive - 12 corners Total Corners = 241
02/17/2021 04:30 PM UTC
OFFICIAL NOTICE 12-1-2021
PROJECT NO. 1: SANITARY SEWER MAIN REPAIR & LINING AND MANHOLE REPAIR & LINING Located at: Area Bounded By S. 27th St. to S. 44th St. and W. Montana St. to W. Ohio Ave.
02/12/2021 04:30 PM UTC
OFFICIAL NOTICE 106-1-2020
WATER MAIN RELAYS, at the following locations: S. Miner St. (WT410200617), W. Fardale Av. to W. Howard Av. (12 working days); W. Fardale Av. (WT410200618), W. Loomis Rd. to S. Miner St. (21 working days); S. 33rd St. (WT410200625), W. Paine St. to W. Verona Ct. (12 working days); W. Paine St.(WT410200626), W. Lakefield Dr. to S. 33rd St. (12 working days); S. Sunset Dr. (WT410200638), W. Morgan Av. to S. Massachusetts Av. (42 working days); W. Tripoli Av. (WT410200639), S. Massachusetts Av. to S. 73rd St. (33 working days); S. 74th St. (WT41020640), W. Van Beck Av. to W. Waterford Av. (17 working days); S. 75th St. (WT410200641), W. Van Beck Av. to W. Waterford Av. (19 working days); W. Warnimont Av. (WT410200656), S. 78th St. to S. 81st St. (17 working days); S. 95th St. (WT410200668), W. Oklahoma Av. to W. Beloit Rd. (22 working days); S. 98th St. (WT410200669), W. Oklahoma Av. to W. Beloit Rd. (37 working days). (Note: Contractor to furnish and install approximately 12,692 lin. ft. of 16”, 12”, 8”, and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
01/14/2021 04:30 PM UTC
OFFICIAL NOTICE 11-1-2021
CONSTRUCTION AND INSTALLATION OF VARIOUS STREET LIGTHING APPURTENANCE WORK, STREET LIGHTING POLES, CONDUIT AND CABLE INSTALLATION, ELECTRICAL APPURTENANCE REMOVALS, 5” CONCRETE WALK REMOVAL AND REPLACEMENT, ETC.; Located at: TD05688016 – Historic Third Ward Pole and Fixture Installation in: East Chicago Street, North Milwaukee Street, & East Corcoran Street
01/13/2021 04:30 PM UTC
OFFICIAL NOTICE 10-1-2021
2021 Sanitary Bypass Pump & Sanitary Lift Station Inspection and Bypass Pump Wet Testing
01/05/2021 04:30 PM UTC
OFFICIAL NOTICE 103-1-2020
WATER MAIN RELAYS, at the following locations: W. Concordia Ave. (WT410200620), N. 89th St. to N. 98th St. (88 working days); N. 96th St. (WT410200622), N. Colonial Dr. to 240' N/O W. Auer Ave. (28 working days); N. Colonial Dr. (WT410200623), W. Auer Ave. to W. Concordia Ave. (25 working days); W. Auer Ave. (WT410200624), N. 89th St. to N. 97th St. (82 working days); E. Linnwood Ave. (WT410200642), N. Downer Ave. to N. Lake Dr. (46 working days); W. Hampton Ave. (S/S) (WT410200644), N. 84th St. to N. 90th St. (62 working days); (Note: Contractor to furnish and install approximately 11,528 lin. ft. of 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
01/04/2021 04:30 PM UTC
OFFICIAL NOTICE 96-1-2020
BIOSWALES IN N. Sherman Blvd. – W. Custer Ave. to W. Florist Ave.
12/30/2020 04:30 PM UTC
OFFICIAL NOTICE 108-1-2020
2020 SANITARY BYPASS PUMP REHABILITATION IN: VARIOUS LOACATIONS
12/23/2020 04:30 PM UTC
591 - 600 of 1568 Solicitations
1 2 56 57 58 60 62 63 64 156 157