General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 15-1-2021
SANITARY SEWER MAIN RELAY & SANITARY SEWER LINING & MANHOLE REPAIR AND LINING IN: S. 1st St. – W. Armour Ave. to 150’+/- South of W. Armour Ave. S. 5th St. – 120’+/- North of W. Van Norman Ave. to Wilson Park Creek W. Armour Ave. – S. 1st St. to S. 5th Pl. Area Bounded By S. Howell Ave. to S. 6th St. and W. Bolivar Ave. to W. Layton Ave.
04/28/2021 03:30 PM UTC
OFFICIAL NOTICE 15-2-2021
COMBINED AND STORM SEWER MAIN RELAY in: S. 36th St. – W. Grant St. to W. Lincoln Ave. W. Clybourn St. – N. 32nd St. to N. 35th St.
04/28/2021 03:30 PM UTC
OFFICIAL NOTICE 15-3-2021
COMBINED AND SANITARY SEWER MAIN RELAY in: N. 25th St. - W. Monroe St. to W. Center St. N. 28th St. - W. Concordia Av. to W. Townsend St. N. 35th St. - W. Nash St. to W. Vienna Av. W. Concordia Av. - N. 29th St. to N. 30th St. .
04/28/2021 03:30 PM UTC
OFFICIAL NOTICE 34-1-2021
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, 8” CONCRETE PAVEMENT VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, SEWER WORK, CUC WORK, ETC.; Located at: ST216210109 – ADA RAMPS FOR 2021 HIGH IMPACT PAVING @ VARIOUS LOCATIONS
04/27/2021 03:30 PM UTC
OFFICIAL NOTICE 47-1-2021
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATIONS: Project 1: CITY-OWNED LOT AREA 1A, BOUNDED BY: Capitol Drive to north City limits and Sherman Boulevard to west City limits
04/19/2021 03:30 PM UTC
OFFICIAL NOTICE 47-2-2021
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATIONS: PROJECT 2: CITY-OWNED LOT AREA 3, bounded by North Avenue, N. 27th Street, Capitol Drive, and N. 20th Street
04/19/2021 03:30 PM UTC
OFFICIAL NOTICE 1-1-2021
CONSTRUCTION VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 9” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE SLURRY, 8” CONCRETE BASE, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, PAVEMENT GRINDING, SEWER WORK, WATER WORK, ETC.; Located at: ST211190142 – West Cleveland Avenue – South 20th Street to South 27th Street ST214210101 – North 21st Street – West Galena Street to West Walnut Street
04/15/2021 03:30 PM UTC
OFFICIAL NOTICE 29-1-2021
WATER MAIN RELAYS, at the following locations: N. 77TH ST. (WT410210650), W. Lisbon Ave. to W. Nash St. (52 working days); W. Nash ST. (WT410210651), W. Appleton Ave. to N. 78th St. (62 working days); W. Townsend St. (WT410210682), N. 76TH St. to N. 82nd St. (54 working days). (Note: Contractor to furnish and install approximately 7009 lin. ft. of 16”, 12”, 8”, 6” and 4” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/14/2021 03:30 PM UTC
OFFICIAL NOTICE 37-1-2021
100 LEAD SERVICE LINE REPLACEMENTS at various locations within the City of Milwaukee
04/14/2021 03:30 PM UTC
OFFICIAL NOTICE 36-1-2021
ROUTINE PARK AND PLAYGROUND LANDSCAPE MAINTENANCE, WASTE COLLECTION, AND SAFETY INSPECTIONPROJECT DESCRIPTION
04/13/2021 03:30 PM UTC
591 - 600 of 1601 Solicitations